Romero Brother's Company Inc
- Based in
- Richmond
- On San Francisco permits
- Nov 2013 to May 2015
- Last 24 months
- 0 permits filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 11, 2015 | Completed final sign-off Jul 2015 | 2202 17th Av | to comply with complaint #201545571: (legalize permits for kitchen & bathroom remodel on main floor). kitchen approx 12x12 & bathroom 6x5.Details
to comply with complaint #201545571: (legalize permits for kitchen & bathroom remodel on main floor). kitchen approx 12x12 & bathroom 6x5. | $20,000 |
| Feb 25, 2015 | Completed final sign-off Jul 2015 | 2202 17th Av | remodel (e) master bathroom (there is only a sink and toilet currently); install new shower and bathtub. to comply with cec150.0(k)3 & 5; existing room without change of wallsDetails
remodel (e) master bathroom (there is only a sink and toilet currently); install new shower and bathtub. to comply with cec150.0(k)3 & 5; existing room without change of walls | $700 |
| Aug 26, 2014 | Completed final sign-off May 2015 | 2202 17th Av | repair in kind damaged wood in staircase, remove and install new concrete steps and landing. all construction to be replaced in-kind.Details
repair in kind damaged wood in staircase, remove and install new concrete steps and landing. all construction to be replaced in-kind. | $9,000 |
| Nov 27, 2013 | Completed final sign-off Dec 2013 | 279 Vienna St | repair partial of concrete footing and retaining wall of approx. 40 feet in length.Details
repair partial of concrete footing and retaining wall of approx. 40 feet in length. | $4,000 |