Romak Iron Works
- Based in
- Benicia
- On San Francisco permits
- Jan 2011 to Jun 2025
- Last 24 months
- 1 permit filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2025 | Completed final sign-off Sep 2025 | 151 03rd St | install structural strongbank support and ceiling monorailtrack in level 7 temp. exhibit gallery to support movable exhibit wall panels; const. & installation of movable wall panels; const. of temporary wall panels. scope only applies to layout on a2.2. additional changes require separate permit(s).Details
install structural strongbank support and ceiling monorailtrack in level 7 temp. exhibit gallery to support movable exhibit wall panels; const. & installation of movable wall panels; const. of temporary wall panels. scope only applies to layout on a2.2. additional changes require separate permit(s). | $197,000 |
| Jan 12, 2011 | Never finaled issued Jan 2011, no final | 555 California St | reinforcement of window washing track on the roof. drilling holes through extg beams and welding stiffner plates.Details
reinforcement of window washing track on the roof. drilling holes through extg beams and welding stiffner plates. | $42,000 |