Roldan Construction, Inc.
- Based in
- Fremont
- On San Francisco permits
- Jan 2011 to Aug 2011
- Last 24 months
- 0 permits filed
6 permits since 2000: 6 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 25, 2011 | Completed final sign-off Sep 2011 | 124 Geary St | bottga veneta; permit drawings show detail per stor front & sign, permit#201102821079.Details
bottga veneta; permit drawings show detail per stor front & sign, permit#201102821079. | $3,800 |
| Apr 6, 2011 | Completed final sign-off Sep 2011 | 124 Geary St | new mep work for retail t.i. to an extg retail space.include 3 new hvac,one janitor closet.new lights,outlets and switches,work includes a new sewer ejector.referance to app#201103152091Details
new mep work for retail t.i. to an extg retail space.include 3 new hvac,one janitor closet.new lights,outlets and switches,work includes a new sewer ejector.referance to app#201103152091 | $75,000 |
| Mar 15, 2011 | Completed final sign-off Sep 2011 | 124 Geary St | interior ti for new retail store botegga veneta. new floors, ceilings and fixtures. new ada toilet rooms and interior stairs. exterior work under pa# 2011.02.28.1079 ( under review). mep and life safety under separate permit. no exterior work under this permitDetails
interior ti for new retail store botegga veneta. new floors, ceilings and fixtures. new ada toilet rooms and interior stairs. exterior work under pa# 2011.02.28.1079 ( under review). mep and life safety under separate permit. no exterior work under this permit | $150,000 |
| Feb 28, 2011 | Completed final sign-off Sep 2011 | 124 Geary St | construct a temporary construction barricade approx. 5' x 45 ' x 18' tall on public sidewalk, metal stud and plywood construction with abs sandwich panel face and graphicsDetails
construct a temporary construction barricade approx. 5' x 45 ' x 18' tall on public sidewalk, metal stud and plywood construction with abs sandwich panel face and graphics | $10,000 |
| Feb 28, 2011 | Completed final sign-off Sep 2011 | 124 Geary St | remodel of an (e) building facade at one tenant storefront. work include new doors, new stone facade with signs and flagpoles. removal of (e) marble facade, store front & doors.Details
remodel of an (e) building facade at one tenant storefront. work include new doors, new stone facade with signs and flagpoles. removal of (e) marble facade, store front & doors. | $80,000 |
| Jan 6, 2011 | Completed final sign-off Jan 2011 | 124 Geary St | ground and basement floor. non struc. interior demo finishes only per ab 17. no ext. work. safe off all elec and plbg. no work to bldg, fire/safety systems. ada access, touilet and elev. to remain unaltered. demo is prep work for future ti. no change in useDetails
ground and basement floor. non struc. interior demo finishes only per ab 17. no ext. work. safe off all elec and plbg. no work to bldg, fire/safety systems. ada access, touilet and elev. to remain unaltered. demo is prep work for future ti. no change in use | $20,000 |