Rokit Construction Company
- Based in
- Daly City
- On San Francisco permits
- Dec 2010 to Aug 2017
- Last 24 months
- 0 permits filed
42 permits since 2000: 36 completed, 4 never finaled, 2 expired or cancelled.
Of the 4 never-finaled permits, 1 is 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2017 | Completed final sign-off Oct 2017 | 619 Clayton St | remodel extg bathroom and unit #4: kitchen in unit #4 on 3rd floor.Details
remodel extg bathroom and unit #4: kitchen in unit #4 on 3rd floor. | $20,000 |
| Jun 13, 2017 | Completed final sign-off Oct 2017 | 1458 Hayes St | repair termite damaged siding in light well in kind.Details
repair termite damaged siding in light well in kind. | $4,000 |
| May 31, 2017 | Completed final sign-off Oct 2017 | 1458 Hayes St | revision to 201705267762. correct address to job site from 1460 to 1458 hayes. keep the (e) wall between kitchen and living/dining roomDetails
revision to 201705267762. correct address to job site from 1460 to 1458 hayes. keep the (e) wall between kitchen and living/dining room | |
| May 26, 2017 | Completed final sign-off Oct 2017 | 1460 Hayes St | remodel existing kitchen, bathrooms, upgrade electrical panel. add bedroomDetails
remodel existing kitchen, bathrooms, upgrade electrical panel. add bedroom | $25,000 |
| Mar 23, 2017 | Expired or cancelled expired Apr 2022 | 1838 Judah St | bathroom scope - replace floor tile, convert single vanity to two vanities. new medicine cabinet, replace rear (e) vinyl window with new. new lights and outlet. new toilet. tub/shower to remain existing. replace window in kind, not visible from street, max u-factgor 0.32Details
bathroom scope - replace floor tile, convert single vanity to two vanities. new medicine cabinet, replace rear (e) vinyl window with new. new lights and outlet. new toilet. tub/shower to remain existing. replace window in kind, not visible from street, max u-factgor 0.32 | $3,000 |
| Mar 10, 2017 | Completed final sign-off Apr 2017 | 901 Faxon Av | new permit for windos (2) in kitchen and anywhere else there are new windows going in. fire culking penetration to garage, not visible from the street on the side on walk way.Details
new permit for windos (2) in kitchen and anywhere else there are new windows going in. fire culking penetration to garage, not visible from the street on the side on walk way. | $500 |
| Feb 10, 2017 | Completed final sign-off Apr 2017 | 901 Faxon Av | kitchen remodel: replace appliances, cabinets, countertop, remove non-bearing partition for pass through; no walls to be altered or removed.Details
kitchen remodel: replace appliances, cabinets, countertop, remove non-bearing partition for pass through; no walls to be altered or removed. | $10,000 |
| Nov 14, 2016 | Never finaled issued Jan 2017, no final | 1389 21st Av | ground floor renovation, relayout (e) ground floor with one bedroom, one bath & family room with 2 car parking. relocate (e) kitchen & convert dining room to bedroom on 2nd and 3rd floorDetails
ground floor renovation, relayout (e) ground floor with one bedroom, one bath & family room with 2 car parking. relocate (e) kitchen & convert dining room to bedroom on 2nd and 3rd floor | $45,000 |
| Jul 29, 2016 | Completed final sign-off Oct 2016 | 619 Clayton St | apt #3: rev to pa#201605278611. remodel bathroom and replace 1 wall furnace. everything in same location.Details
apt #3: rev to pa#201605278611. remodel bathroom and replace 1 wall furnace. everything in same location. | $5,000 |
| May 27, 2016 | Completed final sign-off Oct 2016 | 619 Clayton St | unit #3: remodel kitchennette, (n) cabinets, electrcial, flooring, appliances.Details
unit #3: remodel kitchennette, (n) cabinets, electrcial, flooring, appliances. | $10,000 |
| May 23, 2016 | Completed final sign-off Nov 2019 | 619 Clayton St | seismic retrofit of ground floor includes: anchor bolts,@ foundation throughout, new shear walls, new footings, to meet appendix chapter a4 of the 2012 iebcDetails
seismic retrofit of ground floor includes: anchor bolts,@ foundation throughout, new shear walls, new footings, to meet appendix chapter a4 of the 2012 iebc | $10,000 |
| Jan 29, 2016 | Completed final sign-off Nov 2016 | 1592 Golden Gate Av | to divide extg bedroom into two bedrooms in unit #1 in 1st floor. ref app#201502249184. n/a for maher.Details
to divide extg bedroom into two bedrooms in unit #1 in 1st floor. ref app#201502249184. n/a for maher. | $1,000 |
| Jan 21, 2016 | Completed final sign-off Aug 2016 | 619 Clayton St | 2nd floor: unit 2: remodel (e) kitchen and bathroom.Details
2nd floor: unit 2: remodel (e) kitchen and bathroom. | $15,000 |
| Aug 28, 2015 | Expired or cancelled expired Feb 2019 | 50 Eastman St | convert (e) basement space into a family room, a bedroom, and a full bath. new space to be sprinklered under separate permit. (n) area to be part of unit #1 above.Details
convert (e) basement space into a family room, a bedroom, and a full bath. new space to be sprinklered under separate permit. (n) area to be part of unit #1 above. | $40,000 |
| Jul 31, 2015 | Completed final sign-off Feb 2016 | 50 Eastman St | kitchen remodel, remodel full bath & 1/2 bath, install new electrical throughout existing walls to remain, patch plaster walls as needed. convert bedroom to livingroom.Details
kitchen remodel, remodel full bath & 1/2 bath, install new electrical throughout existing walls to remain, patch plaster walls as needed. convert bedroom to livingroom. | $35,000 |
| Jun 12, 2015 | Completed final sign-off Aug 2015 | 49 Missouri St | replace kitchen cabinets, no relocation of electrical of plumbing fixtures, (e) disable accessibility of kitchen shall be maintained. no structural work.Details
replace kitchen cabinets, no relocation of electrical of plumbing fixtures, (e) disable accessibility of kitchen shall be maintained. no structural work. | $10,000 |
| Mar 20, 2015 | Never finaled issued Mar 2015, no final | 850 Darien Wy | 2 baths remodel - remove & replace plumbing fixtures w/new. replace vanity, fan, outlets & lights. replace (e) vinyl window w/temp. window (window not visible from street) approx 100 sf & 35 sf.Details
2 baths remodel - remove & replace plumbing fixtures w/new. replace vanity, fan, outlets & lights. replace (e) vinyl window w/temp. window (window not visible from street) approx 100 sf & 35 sf. | $30,000 |
| Feb 24, 2015 | Completed final sign-off Nov 2016 | 1594 Golden Gate Av | convert commercial unit into residential apartment. conersion includes: 1 bedroom, 1 bathroom, 1 kitchen and living space. project to comply with section 307(h)(1)(d) conversion of non-conforming uses residential uses. shall comply with nov. #200921583 and nov. #200837721 n/a for maher ordinance.Details
convert commercial unit into residential apartment. conersion includes: 1 bedroom, 1 bathroom, 1 kitchen and living space. project to comply with section 307(h)(1)(d) conversion of non-conforming uses residential uses. shall comply with nov. #200921583 and nov. #200837721 n/a for maher ordinance. | $35,000 |
| Jan 29, 2015 | Completed final sign-off Mar 2015 | 969 Hayes St | in -kind repair -- repair damaged 2 x 8 deck joists and replace w/28 pressure treated wood in kind less than 50%. repair damaged siding at guardrail (guardrail is expected to remain). repair stair stringers with presure treated wood as needed less than 50%Details
in -kind repair -- repair damaged 2 x 8 deck joists and replace w/28 pressure treated wood in kind less than 50%. repair damaged siding at guardrail (guardrail is expected to remain). repair stair stringers with presure treated wood as needed less than 50% | $4,500 |
| Jan 8, 2015 | Completed final sign-off May 2015 | 1265 Union St | kitchen remodel, remodel full bath & 1/2 bath per plan, install new electrical outlets and lights throughout unit; patch plaster walls as needed.Details
kitchen remodel, remodel full bath & 1/2 bath per plan, install new electrical outlets and lights throughout unit; patch plaster walls as needed. | $3,500 |
| Sep 15, 2014 | Completed final sign-off Apr 2015 | 25 Casa Wy | install shower @ (e) 1/2 bath, (n) floor tile, at 4th floor penthouse; maher n/a. compliance with maher ordinance no 155-13 not required.Details
install shower @ (e) 1/2 bath, (n) floor tile, at 4th floor penthouse; maher n/a. compliance with maher ordinance no 155-13 not required. | $4,000 |
| Jan 15, 2014 | Completed final sign-off Apr 2014 | 1592 Golden Gate Av | to comply w/ nov #'s 200799235, 200797936, 20079255, 200678833 & 200837721. remodel 3 bathrooms, kitchen, laundry, water heater & furnace on top fl.Details
to comply w/ nov #'s 200799235, 200797936, 20079255, 200678833 & 200837721. remodel 3 bathrooms, kitchen, laundry, water heater & furnace on top fl. | $30,000 |
| Jan 7, 2014 | Completed final sign-off May 2014 | 1529 Ofarrell St | replace tile, tub and vanity in bathroom, upgrade vent fan and light over sink. paint walls & ceiling.Details
replace tile, tub and vanity in bathroom, upgrade vent fan and light over sink. paint walls & ceiling. | $4,250 |
| Oct 25, 2013 | Completed final sign-off Mar 2014 | 2713 Folsom St | to comply with nov#200451686 item #2,3,4- replace six (6) windows at each floor for total of 18 (low e), install one (1) new window in bathroom for total of 3. no windows face street view or visable from public.Details
to comply with nov#200451686 item #2,3,4- replace six (6) windows at each floor for total of 18 (low e), install one (1) new window in bathroom for total of 3. no windows face street view or visable from public. | $23,000 |
| Sep 16, 2013 | Completed final sign-off Mar 2014 | 2713 Folsom St | demolish rear sunroom/stairs and rebuild deck and egress stairs. comply with 200227882,stairs, handrails, fire exit. must maintain existing egress system, per sffd.Details
demolish rear sunroom/stairs and rebuild deck and egress stairs. comply with 200227882,stairs, handrails, fire exit. must maintain existing egress system, per sffd. | $30,000 |
| Sep 10, 2013 | Completed final sign-off Mar 2014 | 2713 Folsom St | revision to app#201308194653. convert extg 1/2 baths to full baths on floors 1,2,3, modification ot structural calculations of ceiling beams.Details
revision to app#201308194653. convert extg 1/2 baths to full baths on floors 1,2,3, modification ot structural calculations of ceiling beams. | $8,000 |
| Aug 19, 2013 | Completed final sign-off May 2014 | 2713 Folsom St | comply with his violations 200673867, 200234065, 201122481, 200455287, 200451686 - customer brought new set 8/22/13 h.s. kitchen remodel include demolition of non-bearing wall between kitchen and living room. bathroom remodel:convert bathroom/water closet room to one full bath 1/2 bath.Details
comply with his violations 200673867, 200234065, 201122481, 200455287, 200451686 - customer brought new set 8/22/13 h.s. kitchen remodel include demolition of non-bearing wall between kitchen and living room. bathroom remodel:convert bathroom/water closet room to one full bath 1/2 bath. | $50,000 |
| Apr 2, 2013 | Completed final sign-off Jun 2013 | 114 Everson St | kitchen remodel open part of wall between living room & kitchen. install new psl beam. install new closet in bedroom.Details
kitchen remodel open part of wall between living room & kitchen. install new psl beam. install new closet in bedroom. | $8,000 |
| May 21, 2012 | Completed final sign-off Sep 2012 | 19 Forest View Dr | remodel (e) bathroom & kitchen at 2nd. floor plan. in-kind.Details
remodel (e) bathroom & kitchen at 2nd. floor plan. in-kind. | $12,000 |
| May 18, 2012 | Completed final sign-off Sep 2012 | 19 Forest View Dr | 2 ned bedrooms, 1 bathroom, storage to be constructed at ground floorDetails
2 ned bedrooms, 1 bathroom, storage to be constructed at ground floor | $30,000 |
| Mar 9, 2012 | Completed final sign-off Jun 2012 | 557 10th Av | master bath remodel. convert shower tub to shower. new vanity, toilet, lights, fan, and outletDetails
master bath remodel. convert shower tub to shower. new vanity, toilet, lights, fan, and outlet | $8,000 |
| Feb 17, 2012 | Completed final sign-off Jun 2012 | 557 10th Av | remodel kitchen & powder room at ground floor - replace counter, cabinet, elec, appliances, sink, toilet, light, fan. remodle 2nd floor hallway & bath - new tub, sink, toilet, light, fan.Details
remodel kitchen & powder room at ground floor - replace counter, cabinet, elec, appliances, sink, toilet, light, fan. remodle 2nd floor hallway & bath - new tub, sink, toilet, light, fan. | $13,000 |
| Feb 9, 2012 | Completed final sign-off Jun 2012 | 557 10th Av | remove (e) 2x6 redwood decking & replacing with new 2x6 redwood decking. replace (e) 36" guards with 42" high guards @ rear deck in kind. less than 50%.Details
remove (e) 2x6 redwood decking & replacing with new 2x6 redwood decking. replace (e) 36" guards with 42" high guards @ rear deck in kind. less than 50%. | $3,000 |
| Oct 26, 2011 | Never finaled issued Oct 2011, no final | 3335 Broderick St | remove and replace cracked and damaged plaster with (n) 1/2" gypsum board. install new tile in powder room. toilet and vanity to remain. area of repair of gyp board less than 100 sq ft. repair in kind. no structural work.Details
remove and replace cracked and damaged plaster with (n) 1/2" gypsum board. install new tile in powder room. toilet and vanity to remain. area of repair of gyp board less than 100 sq ft. repair in kind. no structural work. | $1,000 |
| Sep 27, 2011 | Completed final sign-off Dec 2011 | 1721 Kirkham St | dryrot repair of exterior 50" staircase leading from grade to 2nd floor. remove and replace stringer with new 2x12 stringers, 3 min. no change to gaurds or handrails.Details
dryrot repair of exterior 50" staircase leading from grade to 2nd floor. remove and replace stringer with new 2x12 stringers, 3 min. no change to gaurds or handrails. | $5,000 |
| Jul 12, 2011 | Completed final sign-off Nov 2011 | 455 Bowdoin St | 1)remodel extg bathrooms and kitchen at 2nd floor.2) 3 bedrooms,2 bath rooms,1 family and storage room to be constructed at ground floor per plan.Details
1)remodel extg bathrooms and kitchen at 2nd floor.2) 3 bedrooms,2 bath rooms,1 family and storage room to be constructed at ground floor per plan. | $70,000 |
| May 27, 2011 | Completed final sign-off Feb 2012 | 1941 Cabrillo St | revision to the approved building app#201012247370. relocate bathroom and laundry room to the hallway.Details
revision to the approved building app#201012247370. relocate bathroom and laundry room to the hallway. | |
| Apr 5, 2011 | Completed final sign-off Feb 2012 | 1943 Cabrillo St | in-fill lightwell at the first fl to provide enclosed interior stairway connecting unit #1943 w/ the family room at the first floor.Details
in-fill lightwell at the first fl to provide enclosed interior stairway connecting unit #1943 w/ the family room at the first floor. | $5,000 |
| Feb 8, 2011 | Never finaled issued Feb 2011, no final | 1941 Cabrillo St | deck extension at third floor dwelling unit #1941.Details
deck extension at third floor dwelling unit #1941. | $1,000 |
| Feb 2, 2011 | Completed final sign-off Feb 2012 | 1941 Cabrillo St | revision #1 to the approved bldg permit application #201012136530. dwelling unit #1943 cabrillo st on 2nd floor. expansion of bathroom #1 into the light well. dwelling unit #1941 cabrillo st 3rd floor:expansion of the closet into the light well.Details
revision #1 to the approved bldg permit application #201012136530. dwelling unit #1943 cabrillo st on 2nd floor. expansion of bathroom #1 into the light well. dwelling unit #1941 cabrillo st 3rd floor:expansion of the closet into the light well. | |
| Dec 24, 2010 | Completed final sign-off May 2012 | 1941 Cabrillo St | interior remodel of extg family room and bathroom at the 1st floor. new laundry closet. enlargement of the garage door. weatherproofing of the main entry lobby.Details
interior remodel of extg family room and bathroom at the 1st floor. new laundry closet. enlargement of the garage door. weatherproofing of the main entry lobby. | $38,000 |
| Dec 13, 2010 | Completed final sign-off Feb 2012 | 1941 Cabrillo St | bathroom, kitchen, home office. interior remodel and alteration of dwelling units 1941 and 1943 at 3rd and 2nd floors. relocation of heaters and waterheaters at garage. new hallway at 1st fl connecting entry with garageDetails
bathroom, kitchen, home office. interior remodel and alteration of dwelling units 1941 and 1943 at 3rd and 2nd floors. relocation of heaters and waterheaters at garage. new hallway at 1st fl connecting entry with garage | $60,000 |