Rodan Builders Inc
- Based in
- Hayward
- On San Francisco permits
- Jun 2011 to Aug 2024
- Last 24 months
- 0 permits filed
10 permits since 2000: 6 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 7, 2024 | Completed final sign-off Jan 2026 | 375 Laguna Honda Bl | revision to pa #2021-0923-9018 replacement of the water tank no.2 at laguna honda hospital in order to clarify and resolve current jurisdiction ovelap between hcai & sfdbi. includes minor revisions for construction coordinationDetails
revision to pa #2021-0923-9018 replacement of the water tank no.2 at laguna honda hospital in order to clarify and resolve current jurisdiction ovelap between hcai & sfdbi. includes minor revisions for construction coordination | |
| Mar 4, 2022 | Completed final sign-off Oct 2022 | 59 Grant Av | 2/f: t.i. of 950sf. tenant space is 1400sf. restroom upgrade for accessible sink, renovation of break area casewok and sink, minor electrical work for lights and receptacles.Details
2/f: t.i. of 950sf. tenant space is 1400sf. restroom upgrade for accessible sink, renovation of break area casewok and sink, minor electrical work for lights and receptacles. | $170,000 |
| Sep 23, 2021 | In progress issued Feb 2024 | 375 Laguna Honda Bl | replacement of water tank #2. including new security(fencing,lighting) & access road improvements.(1)new site lighting & security camera power under emergency life-safety branch power at the water tank area to enchanced hospital security & site egress sytem,(2)no fire supression scope is includedDetails
replacement of water tank #2. including new security(fencing,lighting) & access road improvements.(1)new site lighting & security camera power under emergency life-safety branch power at the water tank area to enchanced hospital security & site egress sytem,(2)no fire supression scope is included | $2,303,000 |
| Nov 3, 2014 | Completed final sign-off Jun 2015 | 123 Ofarrell St | remove existing coating on deck, prep concrete deck (shot blast) apply new traffic coating, restripe parking spaces. maher n/a.Details
remove existing coating on deck, prep concrete deck (shot blast) apply new traffic coating, restripe parking spaces. maher n/a. | $300,000 |
| Jul 25, 2014 | Expired or cancelled expired Sep 2019 | 360 Grove St | bead blast and grind concrete deck. prime and paint with waterproof coating, restripe existing parking spaces. compliance with maher ordinance no 155-13 not required.Details
bead blast and grind concrete deck. prime and paint with waterproof coating, restripe existing parking spaces. compliance with maher ordinance no 155-13 not required. | $300,000 |
| Apr 21, 2014 | Never finaled issued Oct 2014, no final | 1001 Potrero Av | bldg 100: parapet bracing/ site fencing. bldg 10-40:entry canopy/site fencing. n/a for the maher ordinance #155-13Details
bldg 100: parapet bracing/ site fencing. bldg 10-40:entry canopy/site fencing. n/a for the maher ordinance #155-13 | $250,000 |
| Feb 15, 2012 | Never finaled issued Feb 2012, no final | 1001 Potrero Av | revision to 201111229421.to add additional information for non bearing wall framing and housekeeping padDetails
revision to 201111229421.to add additional information for non bearing wall framing and housekeeping pad | |
| Nov 22, 2011 | Completed final sign-off Apr 2012 | 1001 Potrero Av | barrier removal, construct 3 offices, interior finishes hvac. fire alarm revisions under separate application.Details
barrier removal, construct 3 offices, interior finishes hvac. fire alarm revisions under separate application. | $947,230 |
| Oct 26, 2011 | Completed final sign-off Apr 2012 | 1095 Indiana St | install c-02 fire suppression system in existing dyno engine roomDetails
install c-02 fire suppression system in existing dyno engine room | $50,000 |
| Jun 28, 2011 | Completed final sign-off Jan 2012 | 1050 Wisconsin St | dry rot repair and removal of bldg siding, new stucco and windows on exterior elevation, south/west/eastDetails
dry rot repair and removal of bldg siding, new stucco and windows on exterior elevation, south/west/east | $148,000 |