Rockland Construction Group Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2008 to Jun 2026
- Last 24 months
- 5 permits filed
45 permits since 2000: 33 completed, 4 in progress, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 29, 2026 | In progress issued Jul 2026 | 2521 Quintara St | 2/f: remodel (e) kitchen in-kind (no wall changes). no other work performed.Details
2/f: remodel (e) kitchen in-kind (no wall changes). no other work performed. | $30,000 |
| May 27, 2025 | In progress issued Jun 2025 | 4150 25th St | unit a: 1/f: remodel kitchen and bathroom in-kind. replace 13 front windows with vinyl windows. replace front shingles to hardie shingles. max u-factor 0.30 inkind windows.Details
unit a: 1/f: remodel kitchen and bathroom in-kind. replace 13 front windows with vinyl windows. replace front shingles to hardie shingles. max u-factor 0.30 inkind windows. | $40,000 |
| Apr 21, 2025 | In progress issued Apr 2025 | 4150 25th St | top floor unit 4150 25th st: remodel kitchen and bathroom in-kind. no other work performed.Details
top floor unit 4150 25th st: remodel kitchen and bathroom in-kind. no other work performed. | $45,000 |
| Feb 24, 2025 | Completed final sign-off Apr 2025 | 1921 Taraval St | new 1/2 bathroom and laundry room on 1/f. no work on 2/f & 3/f.Details
new 1/2 bathroom and laundry room on 1/f. no work on 2/f & 3/f. | $10,000 |
| Feb 3, 2025 | Completed final sign-off Jul 2025 | 638 27th St | remodel one bedroom and bathroomDetails
remodel one bedroom and bathroom | $15,000 |
| Aug 6, 2024 | Completed final sign-off Apr 2025 | 527 Moraga St | 527-529 moraga st: replace (e) siding to hardie cement and 2/f & 3/f front windows to be fiberglass in-kind and 4 rear vinyl windows replace in-kind. comply w/complaint 2024488 & 202423863 item 1-17 allDetails
527-529 moraga st: replace (e) siding to hardie cement and 2/f & 3/f front windows to be fiberglass in-kind and 4 rear vinyl windows replace in-kind. comply w/complaint 2024488 & 202423863 item 1-17 all | $10,000 |
| Jul 18, 2024 | Completed final sign-off Mar 2025 | 1124 Judah St | 1/f: new media room, bar, bathroom, bedroom, relocate mech. 2/f: remodel living & dining rooms, bathrooms and kitchen.Details
1/f: new media room, bar, bathroom, bedroom, relocate mech. 2/f: remodel living & dining rooms, bathrooms and kitchen. | $120,000 |
| Jun 26, 2024 | Completed final sign-off Jan 2025 | 822 45th Av | 2/f: relocate bathroom, removel living roo0m, relocate bedroom and new kichen per plan. n0 work on 1st floor.Details
2/f: relocate bathroom, removel living roo0m, relocate bedroom and new kichen per plan. n0 work on 1st floor. | $60,000 |
| May 8, 2024 | In progress issued May 2024 | 40 Homewood Ct | repair and replace concrete walkway between homes, about 2 ft x 5ft area.Details
repair and replace concrete walkway between homes, about 2 ft x 5ft area. | $8,000 |
| Mar 14, 2024 | Completed final sign-off Jan 2025 | 138 Shawnee Av | rev 202206216791 (n) location of kitchen (relocate), modify bedroom, add new bedroom and opening at rear.Details
rev 202206216791 (n) location of kitchen (relocate), modify bedroom, add new bedroom and opening at rear. | $10,000 |
| Jan 29, 2024 | Completed final sign-off Feb 2024 | 5434 Geary Bl | to comply with complaint # 202317103, item #3: repair one step tread and portion of guardrail @ rear.Details
to comply with complaint # 202317103, item #3: repair one step tread and portion of guardrail @ rear. | $1,000 |
| Jun 16, 2023 | Completed final sign-off Aug 2023 | 78 Stoneybrook Av | revision to approved pa# 201910184924, reconfigure interior layout per plan, convert bedroom to media room & add wet bar.Details
revision to approved pa# 201910184924, reconfigure interior layout per plan, convert bedroom to media room & add wet bar. | $1,000 |
| Feb 28, 2023 | Completed final sign-off Nov 2023 | 166 Bright St | g/f: relocate mech, laundry, bathroom, & (e) bedrooms. (n) media room & storage. 2/f: kitchen remodel, bathroom remodel in-kind. add (n) bathroom.Details
g/f: relocate mech, laundry, bathroom, & (e) bedrooms. (n) media room & storage. 2/f: kitchen remodel, bathroom remodel in-kind. add (n) bathroom. | $155,154 |
| Feb 23, 2023 | Completed final sign-off Apr 2023 | 641 Central Av | replace sheetrock in two storage rooms in the basmement. no new walls.Details
replace sheetrock in two storage rooms in the basmement. no new walls. | $3,000 |
| Jan 25, 2023 | Completed final sign-off Feb 2024 | 520 08th Av | to comply wit nov# 202296627: bathroom remodel replace bathtub,sink, toilet and tiles no wall alterations- remodel in kindDetails
to comply wit nov# 202296627: bathroom remodel replace bathtub,sink, toilet and tiles no wall alterations- remodel in kind | $10,000 |
| Dec 27, 2022 | Completed final sign-off Oct 2023 | 58 Los Palmos Dr | 2nd floor:remodel kitchen and bathroom in kind. ground floor: relocate bed, half bathroom, laundry, mech, new full bathroom, media room and wet bar. replace whole house sheetrock and install insulation where needed. replace 2 rear windows openings in kind.Details
2nd floor:remodel kitchen and bathroom in kind. ground floor: relocate bed, half bathroom, laundry, mech, new full bathroom, media room and wet bar. replace whole house sheetrock and install insulation where needed. replace 2 rear windows openings in kind. | $56,000 |
| Nov 17, 2022 | Completed final sign-off Jan 2025 | 2695 23rd Av | revision to 202202097686 and 202210285463. remove 1 bath @ ground fl. relocate kitchen, add 1 bath @ 2nd fl. add one bath @ 3rd fl. revised struct. framingDetails
revision to 202202097686 and 202210285463. remove 1 bath @ ground fl. relocate kitchen, add 1 bath @ 2nd fl. add one bath @ 3rd fl. revised struct. framing | |
| Sep 26, 2022 | Completed final sign-off Sep 2023 | 240 Vicente St | g/f: convert study room into media room and convert storage into new office. no other work performed.Details
g/f: convert study room into media room and convert storage into new office. no other work performed. | $10,000 |
| Jun 21, 2022 | Completed final sign-off Jan 2025 | 138 Shawnee Av | unit a: remodel kitchen and bathroom.Details
unit a: remodel kitchen and bathroom. | $20,000 |
| Mar 31, 2022 | Completed final sign-off Feb 2023 | 151 Venus St | remodel/relocate kitchen and bath, add full bath, relocate stairs enclose patio, remove walls, add a deck and stair at rear on 2nd floor. add 2 bedroom, a full bath, media and kitchenette on 1st floor. replace w/ aluminum windows and entry door at front. replace vinyl doors at rear. replace water heDetails
remodel/relocate kitchen and bath, add full bath, relocate stairs enclose patio, remove walls, add a deck and stair at rear on 2nd floor. add 2 bedroom, a full bath, media and kitchenette on 1st floor. replace w/ aluminum windows and entry door at front. replace vinyl doors at rear. replace water he | $200,000 |
| Mar 3, 2022 | Completed final sign-off Feb 2023 | 151 Venus St | replace sheetrock in the kitchen and bathroom. no kitchen remodel under this permit no bathroom remodel under this permit.Details
replace sheetrock in the kitchen and bathroom. no kitchen remodel under this permit no bathroom remodel under this permit. | $8,000 |
| Dec 29, 2021 | Completed final sign-off Apr 2024 | 1761 Leavenworth St | remodel existing kitchen and 1 bathroom. no structural work: no walls/framing modifications.Details
remodel existing kitchen and 1 bathroom. no structural work: no walls/framing modifications. | $30,000 |
| Oct 29, 2021 | Completed final sign-off Nov 2021 | 40 Homewood Ct | add counter and sink at family room 1st fl; rev to pa202103227038 & 202109299440Details
add counter and sink at family room 1st fl; rev to pa202103227038 & 202109299440 | $1,000 |
| Oct 22, 2021 | Completed final sign-off Apr 2022 | 3811 24th St | unit c: renovation kitchen no layout changesDetails
unit c: renovation kitchen no layout changes | $21,000 |
| Sep 29, 2021 | Completed final sign-off Nov 2021 | 40 Homewood Ct | revision to pa# 202103227038. combine bedroom #4 and family as a family room. remove liner closet.Details
revision to pa# 202103227038. combine bedroom #4 and family as a family room. remove liner closet. | |
| May 21, 2021 | Completed final sign-off Feb 2026 | 1801 28th Av | new dwelling unit on ground floor per government code sec. 65852.2. relocate (e) bath & kitchen on 2nd floor per plan. add 1 new master bedroom with bath on 2nd floor per plan.Details
new dwelling unit on ground floor per government code sec. 65852.2. relocate (e) bath & kitchen on 2nd floor per plan. add 1 new master bedroom with bath on 2nd floor per plan. | $200,000 |
| Feb 18, 2021 | Completed final sign-off Oct 2021 | 40 Homewood Ct | replace drywall inside, approximately 3,000 sq. ft., gypboard to be 5/8", type x w/sd cooler nails @ 4" oc or equivalent screwsDetails
replace drywall inside, approximately 3,000 sq. ft., gypboard to be 5/8", type x w/sd cooler nails @ 4" oc or equivalent screws | $6,000 |
| Nov 1, 2019 | Completed final sign-off Jun 2020 | 507 04th Av | structural revision to pa 2019-0123-0981 widening of approved rear deck, voluntary seismic upgradeDetails
structural revision to pa 2019-0123-0981 widening of approved rear deck, voluntary seismic upgrade | $500 |
| Sep 26, 2019 | Never finaled issued Oct 2019, no final | 216 04th Av | unit #7: remodel bathroom. add 1 bedroom and 1 full bathDetails
unit #7: remodel bathroom. add 1 bedroom and 1 full bath | $15,000 |
| Aug 19, 2019 | Never finaled issued Aug 2019, no final | 2174 28th Av | to obtain a final inspection for work approved under pa#201712015235. all work is complete.Details
to obtain a final inspection for work approved under pa#201712015235. all work is complete. | $60,000 |
| May 31, 2019 | Completed final sign-off Feb 2020 | 294 Ivy St | existing retail space at grd floor to be wine bar. **maher n/a**Details
existing retail space at grd floor to be wine bar. **maher n/a** | $49,000 |
| Jan 23, 2019 | Completed final sign-off Jun 2020 | 507 04th Av | interior remodel at e single family dwelling @ 2nd and 3rd flr, new rear deck off great room 2nd fl. new proposed 2nd dwelling units at 1st fl, 1 bedroom, 1 full bath. garage to remainDetails
interior remodel at e single family dwelling @ 2nd and 3rd flr, new rear deck off great room 2nd fl. new proposed 2nd dwelling units at 1st fl, 1 bedroom, 1 full bath. garage to remain | $150,000 |
| Jan 24, 2018 | Completed final sign-off Sep 2018 | 600 South Van Ness Av | restaurant tenant improvement in a commercial shell. 38 occupants, b occupancy. includes new kitchen hood, fire under separate permits. no compressed gas, no co2 use. provide smoke detector shutdown for supply and fan systems over 2000 sfm, under separate permit(s). n/a for maherDetails
restaurant tenant improvement in a commercial shell. 38 occupants, b occupancy. includes new kitchen hood, fire under separate permits. no compressed gas, no co2 use. provide smoke detector shutdown for supply and fan systems over 2000 sfm, under separate permit(s). n/a for maher | $300,000 |
| Dec 1, 2017 | Never finaled issued Dec 2017, no final | 2174 28th Av | 1st fl - convert part 0f (e) garge and tunnel entrance to living space and add shear walls, media room, laundry, storage and bathroom; 2nd fl - add roof over stair, install skylight, remove main door, and create open visual and spatial connection between floorsDetails
1st fl - convert part 0f (e) garge and tunnel entrance to living space and add shear walls, media room, laundry, storage and bathroom; 2nd fl - add roof over stair, install skylight, remove main door, and create open visual and spatial connection between floors | $60,000 |
| Oct 31, 2017 | Completed final sign-off Sep 2018 | 2120 Clement St | 4th floor unit #11: remodel kitchen and bath, and walk-in closet.Details
4th floor unit #11: remodel kitchen and bath, and walk-in closet. | $30,000 |
| Sep 13, 2017 | Expired or cancelled expired Apr 2025 | 715 Brannan St | scope of work to include installation of plumbing and electrical hvac systems for proposed restraurant. see architectural and structural drawings, pa 2016-0401-3768 s1Details
scope of work to include installation of plumbing and electrical hvac systems for proposed restraurant. see architectural and structural drawings, pa 2016-0401-3768 s1 | $80,000 |
| Jul 31, 2017 | Completed final sign-off Feb 2018 | 2115 16th Av | remodel/relocate kitchen & bath, add a full bath, convert dining to bedroom, remove interior stairs, replace main stairs, add skylight on 2/f, add family/study/2 full bath, entry doors on 1/fl, replace with aluminum clad wood windows in kind @ front, vinyl window @ rear, replace water heater,furnaceDetails
remodel/relocate kitchen & bath, add a full bath, convert dining to bedroom, remove interior stairs, replace main stairs, add skylight on 2/f, add family/study/2 full bath, entry doors on 1/fl, replace with aluminum clad wood windows in kind @ front, vinyl window @ rear, replace water heater,furnace | $98,000 |
| Jun 23, 2017 | Completed final sign-off Mar 2018 | 98 Raymond Av | remodel kitchen and bath on 2nd fl, cabinets, countertop,Details
remodel kitchen and bath on 2nd fl, cabinets, countertop, | $30,000 |
| Jun 23, 2017 | Completed final sign-off Mar 2018 | 98 Raymond Av | replace 9 aluminum windows with wood or wood clad windows. face street.Details
replace 9 aluminum windows with wood or wood clad windows. face street. | $5,000 |
| Jun 21, 2017 | Expired or cancelled cancelled Jan 2026 | 98 Raymond Av | remodel kitchen and 2 baths, upgrade electricDetails
remodel kitchen and 2 baths, upgrade electric | $30,000 |
| Dec 1, 2016 | Expired or cancelled expired Oct 2025 | 1400 Hyde St | addition of(n) unit at basement le el per ord. 162-16 bpa#201509177259 (n) unit 675 sq. ft; (2) bedrooms,(one) office, kitchen, living room (2) bathroomsDetails
addition of(n) unit at basement le el per ord. 162-16 bpa#201509177259 (n) unit 675 sq. ft; (2) bedrooms,(one) office, kitchen, living room (2) bathrooms | $25,000 |
| Aug 31, 2016 | Completed final sign-off Feb 2017 | 2174 28th Av | add one 2nd floor bathroom. convert lite well into interior space. combine 2 closets into one.Details
add one 2nd floor bathroom. convert lite well into interior space. combine 2 closets into one. | $25,000 |
| Apr 1, 2016 | Expired or cancelled expired Apr 2025 | 715 Brannan St | provide full-service restaurant w/ commercial kitchen, (2) ada complied bathrooms, entry way, exit. no structural work - all (e) load bearing walls, columns, roof trusses to remain.Details
provide full-service restaurant w/ commercial kitchen, (2) ada complied bathrooms, entry way, exit. no structural work - all (e) load bearing walls, columns, roof trusses to remain. | $60,000 |
| Mar 28, 2016 | Completed final sign-off Nov 2016 | 1746 22nd Av | remodel e bathroom and remove non bearing wall at closet. 2nd flDetails
remodel e bathroom and remove non bearing wall at closet. 2nd fl | $12,000 |
| Jun 19, 2008 | Never finaled issued Apr 2013, no final | 138 Alpha St | construct a new 3 story, single family dwelling.Details
construct a new 3 story, single family dwelling. | $500,000 |