Rocket Science
- Based in
- San Francisco
- On San Francisco permits
- Dec 2003 to Jan 2014
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 14, 2014 | Never finaled issued Jan 2014, no final | 991 Tennessee St | strengthen roof trasses in order to support increased load.Details
strengthen roof trasses in order to support increased load. | $20,000 |
| May 21, 2012 | Completed final sign-off Jan 2013 | 1301 Cesar Chavez St | install new steel frame and foundation to support bell and new foundations to support 3 cleats. under separate app 200404080860 to erect new art structureDetails
install new steel frame and foundation to support bell and new foundations to support 3 cleats. under separate app 200404080860 to erect new art structure | $6,000 |
| Dec 21, 2011 | Completed final sign-off Apr 2013 | 707 23rd Av | revision of estimate cost of pa# 201107089808 & 201109063925 to total $250,000 per request of inspector on 12/16/2011. additional plaster removal for repair, floor replacement.Details
revision of estimate cost of pa# 201107089808 & 201109063925 to total $250,000 per request of inspector on 12/16/2011. additional plaster removal for repair, floor replacement. | $77,000 |
| Sep 6, 2011 | Completed final sign-off Apr 2013 | 707 23rd Av | revision to app#201107089808. revise engineering per actual conditions 1) eliminate unnecessary beam,2) simplify new beam installation, 3) address roof structure concerns, replace 2 interior doors with pocket doors, modify closet for master bedroom, detail moisture barrier at 1st level,Details
revision to app#201107089808. revise engineering per actual conditions 1) eliminate unnecessary beam,2) simplify new beam installation, 3) address roof structure concerns, replace 2 interior doors with pocket doors, modify closet for master bedroom, detail moisture barrier at 1st level, | $3,000 |
| Jul 8, 2011 | Completed final sign-off Apr 2013 | 707 23rd Av | new family room, bathroom, and laundry room on 1st floor, renovate extg bathroom and kitchen at 2nd floor. replace with new windows and french doors both levels, new roof deck at south light well, new rear deck,move skylight at roofDetails
new family room, bathroom, and laundry room on 1st floor, renovate extg bathroom and kitchen at 2nd floor. replace with new windows and french doors both levels, new roof deck at south light well, new rear deck,move skylight at roof | $125,000 |
| Dec 8, 2003 | Completed final sign-off Mar 2004 | 2390 Bush St | hang frame to carry speaker cluster,no exterior work,structuralDetails
hang frame to carry speaker cluster,no exterior work,structural | $15,000 |