- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 29, 2014 | Completed final sign-off Dec 2014 | 60 Collingwood St | skylight and closet buildout at 3rd floor unit. glass panel walkwayDetails
skylight and closet buildout at 3rd floor unit. glass panel walkway | $10,000 |
| Jul 9, 2013 | Completed final sign-off Aug 2013 | 580 Peralta Av | remove & replace 1 2"x8"x12' rim joist, remove/replace 1 2"x8"x12' deck ledgers, remove/replace 2 6"x6"x5' posts under deck ledger, remove/discard 1 sliding glass door, replace with smaller 6' door (frame in wall to fit door), match & install exterior siding, replace/repair deck, less than 50%Details
remove & replace 1 2"x8"x12' rim joist, remove/replace 1 2"x8"x12' deck ledgers, remove/replace 2 6"x6"x5' posts under deck ledger, remove/discard 1 sliding glass door, replace with smaller 6' door (frame in wall to fit door), match & install exterior siding, replace/repair deck, less than 50% | $10,000 |
| Dec 21, 2009 | Completed final sign-off Apr 2011 | 896 Rhode Island St | revision to appl #200702063549 skeep lower beam intact & raise floor level to accomodate (e) beams below to stay & min. scope of work.all work shown on delta 1Details
revision to appl #200702063549 skeep lower beam intact & raise floor level to accomodate (e) beams below to stay & min. scope of work.all work shown on delta 1 |