Robinson Renovations
- Based in
- San Rafael
- On San Francisco permits
- May 2014 to Sep 2020
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 22, 2020 | Completed final sign-off Oct 2020 | 3621 Webster St | in-kind dryrot repair of side staircase less than 50%Details
in-kind dryrot repair of side staircase less than 50% | $9,500 |
| Aug 8, 2018 | Completed final sign-off Feb 2019 | 88 King St | replace in kind kitchen cabinets. add pendant light. replace in kind shower, toilet, tile.Details
replace in kind kitchen cabinets. add pendant light. replace in kind shower, toilet, tile. | $65,000 |
| Aug 22, 2017 | Completed final sign-off Feb 2018 | 348 Church St | reconstruction due to water damange: includes retiling 2 bathrooms, reflooring 1 bedroom, installting vanities/fixtures, electricals, work to add additional power outlet in each bathroom, plubming wood for vanities and to fix pipes fixing baseboards & casings.Details
reconstruction due to water damange: includes retiling 2 bathrooms, reflooring 1 bedroom, installting vanities/fixtures, electricals, work to add additional power outlet in each bathroom, plubming wood for vanities and to fix pipes fixing baseboards & casings. | $40,000 |
| May 9, 2017 | Completed final sign-off Sep 2017 | 348 Church St | in-kind remodel of (e) kitchen& bathroom at (e) locations. new fixtures & finishes. no structural changes.Details
in-kind remodel of (e) kitchen& bathroom at (e) locations. new fixtures & finishes. no structural changes. | $12,000 |
| Feb 13, 2015 | Completed final sign-off Apr 2016 | 119 Corwin St | #2 - interior remodel includes an update kitchen, stair, living/dining room, and bathroom. hydronic radiant heat system will be added. no structural or exterior work intended under this permit.Details
#2 - interior remodel includes an update kitchen, stair, living/dining room, and bathroom. hydronic radiant heat system will be added. no structural or exterior work intended under this permit. | $120,000 |
| Nov 4, 2014 | Completed final sign-off Jan 2015 | 1938 34th Av | small amount of dry rot repair on the boards surrounding the garage. replace siding in kind with stucco siding.Details
small amount of dry rot repair on the boards surrounding the garage. replace siding in kind with stucco siding. | $2,500 |
| Jun 19, 2014 | Completed final sign-off Jul 2014 | 88 King St | revision to 201405196143: remove installation of bathroom sink/vanity.Details
revision to 201405196143: remove installation of bathroom sink/vanity. | |
| May 19, 2014 | Completed final sign-off Jul 2014 | 88 King St | remove old laminate floor/carpeting in 3 rooms and replace with new laminate. replace bathroom vanity, install new crown molding, baseboards in 3 rooms, tile backsplash in kitchen. new paint, new bath vent fan, led disc lights. new entry way fixture, replace 2 pendent lights.Details
remove old laminate floor/carpeting in 3 rooms and replace with new laminate. replace bathroom vanity, install new crown molding, baseboards in 3 rooms, tile backsplash in kitchen. new paint, new bath vent fan, led disc lights. new entry way fixture, replace 2 pendent lights. | $40,000 |