Robert D Whitworth/Dba Whitworth Const.
- Based in
- Martinez
- On San Francisco permits
- Apr 2010 to May 2010
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 17, 2010 | Completed final sign-off May 2010 | 117 College Av | window replacement @ front & rear of building. 12-windows in total replace door to rear yard "in-kind".Details
window replacement @ front & rear of building. 12-windows in total replace door to rear yard "in-kind". | $2,000 |
| Apr 13, 2010 | Completed final sign-off May 2010 | 117 College Av | legalize (e) kitchen & bathroom remodel on 2nd floor. lighting, electrical, plumbing, cabinets & counter top. no adding or moving walls. kitchen:atleast 50% high efficacy llighting by wattage bathroom:high efficacy or occupancy sensor control.Details
legalize (e) kitchen & bathroom remodel on 2nd floor. lighting, electrical, plumbing, cabinets & counter top. no adding or moving walls. kitchen:atleast 50% high efficacy llighting by wattage bathroom:high efficacy or occupancy sensor control. | $8,500 |