Rise Construction
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Feb 2018
- Last 24 months
- 0 permits filed
39 permits since 2000: 30 completed, 1 never finaled, 8 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 15, 2018 | Completed final sign-off Jun 2018 | 3329 Washington St | remodel one master bath, replace tub, tub surround, stonve vanity top and plumbing fixtures.Details
remodel one master bath, replace tub, tub surround, stonve vanity top and plumbing fixtures. | $34,800 |
| Sep 7, 2017 | Never finaled issued Mar 2018, no final | 550 Clipper St | replace windows and garage in kind, security gate at front entry. all work on street facade and no structural work. remove existing stucco and install cove rustic wood siding.Details
replace windows and garage in kind, security gate at front entry. all work on street facade and no structural work. remove existing stucco and install cove rustic wood siding. | $3,000 |
| Jun 26, 2017 | Expired or cancelled expired Aug 2018 | 550 Clipper St | revision to pa 2014-0429-4437, moving north retaining wall closer to front of house creating a mechanical room. changing framing assembly at addition to slab on grade. change beam assembly in street level framing.Details
revision to pa 2014-0429-4437, moving north retaining wall closer to front of house creating a mechanical room. changing framing assembly at addition to slab on grade. change beam assembly in street level framing. | |
| Apr 7, 2017 | Completed final sign-off Apr 2017 | 75 Clarendon Av | to renew for final inspection 200602013570Details
to renew for final inspection 200602013570 | |
| Mar 1, 2017 | Completed final sign-off Sep 2017 | 1908 Filbert St | 4th floor: infill interior lightwell. replace rear sliding windows. provide radiant heated floors for 4th floor only. ref app#201611173051Details
4th floor: infill interior lightwell. replace rear sliding windows. provide radiant heated floors for 4th floor only. ref app#201611173051 | $30,000 |
| Feb 28, 2017 | Completed final sign-off Dec 2017 | 3505 Pacific Av | remodeling kitchen & foure bathrooms. install new wood floor.Details
remodeling kitchen & foure bathrooms. install new wood floor. | $285,000 |
| Nov 17, 2016 | Completed final sign-off Sep 2017 | 1908 Filbert St | demo (e) bathroom wet bar & closets, new kitchen & island fixtrues. improve/expand bathroom & closets. no exterior alterations.Details
demo (e) bathroom wet bar & closets, new kitchen & island fixtrues. improve/expand bathroom & closets. no exterior alterations. | $83,486 |
| Oct 7, 2016 | Completed final sign-off Jul 2017 | 217 Bocana St | revision to 201601116763, replace all existing windows, aluminum-clad at front; fiberglas clad elsewhere. replace garage door. enlarge rear patio door to 8 ft wide. replace e fnds except at stair. replace e fireplace with direct vent. reconfigure walls on gr fl. remove asbestos sidingDetails
revision to 201601116763, replace all existing windows, aluminum-clad at front; fiberglas clad elsewhere. replace garage door. enlarge rear patio door to 8 ft wide. replace e fnds except at stair. replace e fireplace with direct vent. reconfigure walls on gr fl. remove asbestos siding | $35,000 |
| Jan 11, 2016 | Completed final sign-off Jul 2017 | 217 Bocana St | develop gr floor rooms and part of garage area into habitable space. remove non conforming staircase and replace with new spiral stair. raise ceiling above 2nd fl living room. revise windows and doorsDetails
develop gr floor rooms and part of garage area into habitable space. remove non conforming staircase and replace with new spiral stair. raise ceiling above 2nd fl living room. revise windows and doors | $80,000 |
| Apr 29, 2014 | Expired or cancelled expired Aug 2018 | 550 Clipper St | rear yard add'n. grade level: kitchen, dinning, living, 1/2 bath, deck w/roof deck above street level, modify stair.Details
rear yard add'n. grade level: kitchen, dinning, living, 1/2 bath, deck w/roof deck above street level, modify stair. | $50,000 |
| Apr 16, 2014 | Completed final sign-off Nov 2014 | 3954 26th St | remodel gr fl apartment with updated electrical, plumbing, add new bathroom. remove non load bearing wall at kitchen. remove non lad bearing wall between sunroom & living room. replace 4 windows not visible from streetDetails
remodel gr fl apartment with updated electrical, plumbing, add new bathroom. remove non load bearing wall at kitchen. remove non lad bearing wall between sunroom & living room. replace 4 windows not visible from street | $150,000 |
| Oct 16, 2013 | Completed final sign-off Oct 2013 | 150 Lombard St | to obtain final inspection for work approved under pa 20086174590Details
to obtain final inspection for work approved under pa 20086174590 | |
| Apr 12, 2013 | Completed final sign-off Oct 2013 | 150 Lombard St | remodel 2 bathrooms, new tile showers, new vanities & light fixtures above mirrorsDetails
remodel 2 bathrooms, new tile showers, new vanities & light fixtures above mirrors | $40,000 |
| Sep 25, 2012 | Completed final sign-off Dec 2012 | 2212 Castro St | remodel one master bathroom & remove current materials to studs & replace with new tub, vanity, cabinet, sinks and all tile work. install 3 new pendant lights & move 2 recessed can lights. permanently installed lights in bathroom controlled by manual on occupancy sensor cec150(k)10Details
remodel one master bathroom & remove current materials to studs & replace with new tub, vanity, cabinet, sinks and all tile work. install 3 new pendant lights & move 2 recessed can lights. permanently installed lights in bathroom controlled by manual on occupancy sensor cec150(k)10 | $25,000 |
| Apr 18, 2011 | Completed final sign-off Oct 2011 | 170 San Anselmo Av | remodel kitchen & 3 bathrooms, replace exterior windows (total of 36 windows). interior remodel, no change to bldg envelope.Details
remodel kitchen & 3 bathrooms, replace exterior windows (total of 36 windows). interior remodel, no change to bldg envelope. | $215,000 |
| Nov 12, 2010 | Completed final sign-off Mar 2011 | 281 Chestnut St | install new beam to support existing roof framing.Details
install new beam to support existing roof framing. | $750 |
| Oct 19, 2010 | Completed final sign-off Mar 2011 | 281 Chestnut St | rear bldg. kitchen and bath remodel including floor plan change for kitchen and bath of non structural wallsDetails
rear bldg. kitchen and bath remodel including floor plan change for kitchen and bath of non structural walls | $85,000 |
| Apr 1, 2010 | Completed final sign-off Jul 2010 | 866 Rhode Island St | remove (e) slab on ground level of bldg. & install (n) with radiant heat tubing. frame (n) shear walls. install thee windows in (e) locations. install two windows in (n) locations. install (n) lighting & plugs per plan. install one toilet & sing in small powder room.Details
remove (e) slab on ground level of bldg. & install (n) with radiant heat tubing. frame (n) shear walls. install thee windows in (e) locations. install two windows in (n) locations. install (n) lighting & plugs per plan. install one toilet & sing in small powder room. | $100,000 |
| Oct 13, 2009 | Completed final sign-off Feb 2010 | 574 Alvarado St | remodel kitchen-demo to studs, update electrical to meet code & include ten (n) recessed cans. install one (n) pocket door. change laundry room into bathroom. change closet into laundry closet.Details
remodel kitchen-demo to studs, update electrical to meet code & include ten (n) recessed cans. install one (n) pocket door. change laundry room into bathroom. change closet into laundry closet. | $80,000 |
| Oct 6, 2009 | Completed final sign-off Oct 2011 | 4349 25th St | 224 sq ft 2nd floor addition over (e) 1st floor kitchen. new addition will include a master bedtoom & bathroom. rear addition/horizontal addition. no change to (e) footprintDetails
224 sq ft 2nd floor addition over (e) 1st floor kitchen. new addition will include a master bedtoom & bathroom. rear addition/horizontal addition. no change to (e) footprint | $50,000 |
| Sep 23, 2009 | Expired or cancelled expired Nov 2011 | 4096 17th St | bathroom remodel-demo bathroom to studs, install new tile shower, 4 can lights, 2 sinks, new touilet, new vanity & cabinet. no relocation of (e) walls. apply 5/8 type x gypum board at right angle to 2x4 wood studs at 16"ocDetails
bathroom remodel-demo bathroom to studs, install new tile shower, 4 can lights, 2 sinks, new touilet, new vanity & cabinet. no relocation of (e) walls. apply 5/8 type x gypum board at right angle to 2x4 wood studs at 16"oc | $22,000 |
| Oct 14, 2008 | Completed final sign-off Feb 2009 | 1734 Bay St | remodel 2 bathrooms with new tile, vanity cabinets, plmg fixtures and new electricle fixtures. remodel one kitch with new cabines plum fixtures & recessed lighting. install one washer dryer in cabinets in dinning room.Details
remodel 2 bathrooms with new tile, vanity cabinets, plmg fixtures and new electricle fixtures. remodel one kitch with new cabines plum fixtures & recessed lighting. install one washer dryer in cabinets in dinning room. | $80,000 |
| Oct 2, 2008 | Completed final sign-off Mar 2009 | 628 Carolina St | remodel of one powder room & 2 full bathrooms. remove & replace 2 tubs, 3 sinks, 3 toilets. install new recessed lights in bathrooms.Details
remodel of one powder room & 2 full bathrooms. remove & replace 2 tubs, 3 sinks, 3 toilets. install new recessed lights in bathrooms. | $52,000 |
| Sep 4, 2008 | Completed final sign-off Nov 2008 | 4515 20th St | 1 bathroom remodel. demolish existing shower, tub, sink & toilet. frame new entry door @ bath as pocket door & change locations of plumbing. install new tub, shower, toilet & sink in new location.Details
1 bathroom remodel. demolish existing shower, tub, sink & toilet. frame new entry door @ bath as pocket door & change locations of plumbing. install new tub, shower, toilet & sink in new location. | $32,000 |
| Jun 17, 2008 | Expired or cancelled expired Jan 2010 | 150 Lombard St | work @ apt# 902 only. remove existing cabinets & appliances. install new cabinets, appliances, light fixtures in kitchen & living room ceiling. provide h.e. lights per title 24.Details
work @ apt# 902 only. remove existing cabinets & appliances. install new cabinets, appliances, light fixtures in kitchen & living room ceiling. provide h.e. lights per title 24. | $65,000 |
| Jan 24, 2008 | Completed final sign-off May 2008 | 1999 Broadway | work @ unit# 21 only. kitchen remodel, remove and install new cabinets, new recessed electrical lighting, new appliances, new washer/dryer in unit. no structural changes. removal of 8' of non load bearing wall @ kitchen @ 2nd @ unit# 21 only.Details
work @ unit# 21 only. kitchen remodel, remove and install new cabinets, new recessed electrical lighting, new appliances, new washer/dryer in unit. no structural changes. removal of 8' of non load bearing wall @ kitchen @ 2nd @ unit# 21 only. | $100,000 |
| Jan 3, 2008 | Completed final sign-off Apr 2008 | 3011 Jackson St | remodel existing bathroom and move one non-load bearing wall approx. 12" into bedroom. install a new shower, sink, toilet, and tile work. no structural work. all work is in unit-2.Details
remodel existing bathroom and move one non-load bearing wall approx. 12" into bedroom. install a new shower, sink, toilet, and tile work. no structural work. all work is in unit-2. | $25,000 |
| Oct 10, 2007 | Completed final sign-off Oct 2007 | 215 Moulton St | renew 200603025847 for final inspection.Details
renew 200603025847 for final inspection. | |
| May 7, 2007 | Completed final sign-off Oct 2007 | 2 Bellair Pl | remodel guest bath within existing footprint. adding recessed lighting in bedroom on ground level.Details
remodel guest bath within existing footprint. adding recessed lighting in bedroom on ground level. | $25,000 |
| Sep 6, 2006 | Completed final sign-off Jan 2007 | 1367 03rd Av | interior kkitchen and living room errmodel new appliances, new cabinets, new windows, refurbish floors, fenestration added is lessthan 50 sf u factor for replacement new windows 42 maxDetails
interior kkitchen and living room errmodel new appliances, new cabinets, new windows, refurbish floors, fenestration added is lessthan 50 sf u factor for replacement new windows 42 max | $50,000 |
| Jun 21, 2006 | Completed final sign-off Nov 2006 | 2206 Pine St | remove/replace kitchen cabinets, install new sink in new location, install new wiring to meet code, widen existing entry to kitchen adding a bar top. demolish interior of master bath & install new plumbing fixtures, cabinets, tile.Details
remove/replace kitchen cabinets, install new sink in new location, install new wiring to meet code, widen existing entry to kitchen adding a bar top. demolish interior of master bath & install new plumbing fixtures, cabinets, tile. | $100,000 |
| Mar 2, 2006 | Expired or cancelled expired Jun 2007 | 215 Moulton St | add bathroom with sink, toilet, and shower on ground leel in garage & exxisting living spaces. enclosed stair well & install packet doors. add recessed lighting in existing space as ground floor.Details
add bathroom with sink, toilet, and shower on ground leel in garage & exxisting living spaces. enclosed stair well & install packet doors. add recessed lighting in existing space as ground floor. | $35,000 |
| Feb 1, 2006 | Expired or cancelled expired Sep 2007 | 75 Clarendon Av | remodel existing mater bath with new shower, toilet, and sink locations. install new tile floor in guest bath. flourescent lightingDetails
remodel existing mater bath with new shower, toilet, and sink locations. install new tile floor in guest bath. flourescent lighting | $50,000 |
| Jun 29, 2005 | Completed final sign-off Sep 2005 | 88 King St | remodel bathroom-remove tub,replace with shoer stall.no stru wk.provide fluorescent light fixture.Details
remodel bathroom-remove tub,replace with shoer stall.no stru wk.provide fluorescent light fixture. | $15,000 |
| May 6, 2005 | Expired or cancelled expired Jul 2005 | 88 King St | change (e) bathroom tub to shower with floor drain. install partial height wall with glazing aboveDetails
change (e) bathroom tub to shower with floor drain. install partial height wall with glazing above | $2,500 |
| Feb 11, 2004 | Completed final sign-off May 2004 | 2539 Clay St | #1- rev.appl#200401164228 to add bath remodel.remove tile walls to studs,tile floor to sub.installDetails
#1- rev.appl#200401164228 to add bath remodel.remove tile walls to studs,tile floor to sub.install | $12,000 |
| Jan 16, 2004 | Completed final sign-off May 2004 | 2539 Clay St | remodel kitchen -cabinets,appl,light fixtures,drywall&flooring.reframe wall .install plumb&elec.Details
remodel kitchen -cabinets,appl,light fixtures,drywall&flooring.reframe wall .install plumb&elec. | $40,000 |
| Jan 15, 2004 | Expired or cancelled cancelled Nov 2024 | 2539 Clay St | remodel kitchen -cabinets,appl,light fixtures,drywall&flooring.reframe wall .install plumb&elec.Details
remodel kitchen -cabinets,appl,light fixtures,drywall&flooring.reframe wall .install plumb&elec. | |
| Mar 7, 2000 | Completed final sign-off Mar 2001 | 534 Broderick St | install new cabinets, sink , paint, counter top, etcDetails
install new cabinets, sink , paint, counter top, etc |