Riley Remodeling And Consulting Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2017 to May 2026
- Last 24 months
- 1 permit filed
6 permits since 2000: 5 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2026 | Completed final sign-off Jul 2026 | 2058 48th Av | partial remodel of (e) ground floor bathroom. remove (e) bathtub and install new barrier free shower. new tile at shower floor and surround. changed drain from 1/2" to 2". (e) toilet, vanity, and lav to remain. add two 4' wet rated led recessed lights at shower ceiling.Details
partial remodel of (e) ground floor bathroom. remove (e) bathtub and install new barrier free shower. new tile at shower floor and surround. changed drain from 1/2" to 2". (e) toilet, vanity, and lav to remain. add two 4' wet rated led recessed lights at shower ceiling. | $14,000 |
| Sep 30, 2022 | Completed final sign-off Oct 2022 | 1020 Union St | remodel existing ground floor laundry to include new applianes and cabinets. remodel existing ground floor bathroom- new fixtures and finishes wall repair and finishes upgrade at existing ground floor bedroom.Details
remodel existing ground floor laundry to include new applianes and cabinets. remodel existing ground floor bathroom- new fixtures and finishes wall repair and finishes upgrade at existing ground floor bedroom. | $21,500 |
| Mar 4, 2022 | Never finaled issued Mar 2022, no final | 325 Granada Av | remodel 2 existing bathrooms to include new fixtures and finishes. sheetrock patching or replacement as required. new fans with motion and humidity sensors. new led lighting. replace all knb and tube wiring with new romex upgrade main panel to 200amps w/ corrective work requested on nov 201622922Details
remodel 2 existing bathrooms to include new fixtures and finishes. sheetrock patching or replacement as required. new fans with motion and humidity sensors. new led lighting. replace all knb and tube wiring with new romex upgrade main panel to 200amps w/ corrective work requested on nov 201622922 | $34,000 |
| May 21, 2020 | Completed final sign-off Dec 2020 | 284 Jules Av | reconstruction of porch, foundation and stairsDetails
reconstruction of porch, foundation and stairs | $10,000 |
| Feb 28, 2018 | Completed final sign-off Dec 2018 | 76 Gates St | install new tile at existing master bath, install new lighting and fan to replace existing, install new shower valves and trim, install new glass block assembly and framing modifications per drawings, new sheet rock at showerDetails
install new tile at existing master bath, install new lighting and fan to replace existing, install new shower valves and trim, install new glass block assembly and framing modifications per drawings, new sheet rock at shower | $50,000 |
| Apr 14, 2017 | Completed final sign-off Mar 2018 | 2579 30th Av | kitchen remodel to residence. remove walls from kitchen to dining and kitchen to living structural improvement.Details
kitchen remodel to residence. remove walls from kitchen to dining and kitchen to living structural improvement. | $45,000 |