Riechers Construction
- Based in
- Napa
- On San Francisco permits
- Jul 2018 to Feb 2022
- Last 24 months
- 0 permits filed
13 permits since 2000: 9 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 16, 2022 | Completed final sign-off Mar 2022 | 400 Prentiss St | revision to pa# 202106021471.minor layout changes. change door location to bath and yard, remove non bearing wall.Details
revision to pa# 202106021471.minor layout changes. change door location to bath and yard, remove non bearing wall. | |
| Jun 2, 2021 | Completed final sign-off Mar 2022 | 400 Prentiss St | add bathroom and office. move bedroom and kitchen. replace brick foundationDetails
add bathroom and office. move bedroom and kitchen. replace brick foundation | $80,000 |
| Dec 16, 2020 | Completed final sign-off Sep 2023 | 3479 Mission St | unit #1: tenant improvement. relocate kitchen, bathroom & bedroom. add 1 bathroom.Details
unit #1: tenant improvement. relocate kitchen, bathroom & bedroom. add 1 bathroom. | $40,000 |
| Nov 17, 2020 | Expired or cancelled withdrawn Jun 2021 | 400 Prentiss St | tenant improvements. add 2 bedrooms and a bathroomDetails
tenant improvements. add 2 bedrooms and a bathroom | $40,000 |
| Nov 17, 2020 | Never finaled filed Nov 2020, never issued | 3481 Mission St | add one bedroom and one bathroom to existing adu in back of existing bldg on bottom flr within existing envelope.Details
add one bedroom and one bathroom to existing adu in back of existing bldg on bottom flr within existing envelope. | $25,000 |
| Oct 13, 2020 | Completed final sign-off Jun 2023 | 3483 Mission St | add a bedroom and a bathroom within the existing footprint of the additional residential unit on ground floor approved under pa# 201607213007.Details
add a bedroom and a bathroom within the existing footprint of the additional residential unit on ground floor approved under pa# 201607213007. | $30,000 |
| May 26, 2020 | Never finaled issued May 2020, no final | 511 Eureka St | install 2 100amp subpanels, install wiring throughout, install 30 ceiling lights, 20 ouletsDetails
install 2 100amp subpanels, install wiring throughout, install 30 ceiling lights, 20 oulets | $8,000 |
| Jan 17, 2020 | Completed final sign-off Feb 2021 | 511 Eureka St | front bldg - ti move kitchen, add 3 bathrooms, change entry doors, add roof access, add roof deckDetails
front bldg - ti move kitchen, add 3 bathrooms, change entry doors, add roof access, add roof deck | $20,000 |
| Dec 9, 2019 | Completed final sign-off Jun 2021 | 402 Prentiss St | revision to pa# 2019/0801/7540 - ti add bathroom, move bedroom. convert (e) attic to habitable space by addiiton of (2) dormers to include (2) br & (1) full bath. add internal stair to connect attic.Details
revision to pa# 2019/0801/7540 - ti add bathroom, move bedroom. convert (e) attic to habitable space by addiiton of (2) dormers to include (2) br & (1) full bath. add internal stair to connect attic. | $15,000 |
| Nov 26, 2019 | Completed final sign-off Jan 2020 | 2814 Harrison St | revision to pa #201906102929. replace water heater.Details
revision to pa #201906102929. replace water heater. | $1,000 |
| Mar 19, 2019 | Completed final sign-off Feb 2021 | 513 Eureka St | relocate kitchen and 1 bath, add 1 (n) bedroom and 2 (n) bathroom. modification to (e) front door opening.Details
relocate kitchen and 1 bath, add 1 (n) bedroom and 2 (n) bathroom. modification to (e) front door opening. | $60,000 |
| Jan 16, 2019 | Never finaled issued Jan 2019, no final | 2816 Harrison St | install washer and dryerDetails
install washer and dryer | $200 |
| Jul 25, 2018 | Completed final sign-off Sep 2019 | 2814 Harrison St | interior renovation of 3rd fl, remove 20' partitions, renovate 2 baths, install new bath, move and remodel kitchen with new appliances, replace all lath and plaster w 5/8 drywall, replace e flooring w 3/8 t and g plywoodDetails
interior renovation of 3rd fl, remove 20' partitions, renovate 2 baths, install new bath, move and remodel kitchen with new appliances, replace all lath and plaster w 5/8 drywall, replace e flooring w 3/8 t and g plywood | $80,000 |