| May 21, 2026 | Completed final sign-off Sep 2026 | 139 Tingley St | re-roofing with torch downDetails- Permit
- 202605211667
- Status
- complete
- Filed
- May 21, 2026
- Permit issued
- May 21, 2026
- Final sign-off
- Sep 28, 2026
- Declared cost
- $11,600
- Address
- 139 Tingley St
re-roofing with torch down Open the permit page | $11,600 |
| May 8, 2026 | Completed final sign-off Aug 2026 | 1390 York St | reroofing torch down, remove tar & gravel haul away, install new rubber.Details- Permit
- 202605080910
- Status
- complete
- Filed
- May 8, 2026
- Permit issued
- May 8, 2026
- Final sign-off
- Aug 12, 2026
- Declared cost
- $14,600
- Address
- 1390 York St
reroofing torch down, remove tar & gravel haul away, install new rubber. Open the permit page | $14,600 |
| Dec 1, 2025 | Completed final sign-off Mar 2026 | 3058 25th St | reroofing- torch downDetails- Permit
- 202512010591
- Status
- complete
- Filed
- Dec 1, 2025
- Permit issued
- Dec 1, 2025
- Final sign-off
- Mar 20, 2026
- Declared cost
- $12,800
- Address
- 3058 25th St
reroofing- torch down Open the permit page | $12,800 |
| Jul 30, 2025 | Completed final sign-off Oct 2025 | 1363 31st Av | re roofing: hot work.Details- Permit
- 202507301930
- Status
- complete
- Filed
- Jul 30, 2025
- Permit issued
- Jul 31, 2025
- Final sign-off
- Oct 20, 2025
- Declared cost
- $6,000
- Address
- 1363 31st Av
re roofing: hot work. Open the permit page | $6,000 |
| May 8, 2025 | Completed final sign-off Oct 2025 | 975 San Bruno Av | reroof w/hot workDetails- Permit
- 202505086034
- Status
- complete
- Filed
- May 8, 2025
- Permit issued
- May 9, 2025
- Final sign-off
- Oct 15, 2025
- Declared cost
- $11,800
- Address
- 975 San Bruno Av
reroof w/hot work Open the permit page | $11,800 |
| Apr 11, 2025 | Completed final sign-off Apr 2025 | 835 Madrid St | re-roofing hot works.Details- Permit
- 202504114188
- Status
- complete
- Filed
- Apr 11, 2025
- Permit issued
- Apr 11, 2025
- Final sign-off
- Apr 28, 2025
- Declared cost
- $11,800
- Address
- 835 Madrid St
re-roofing hot works. Open the permit page | $11,800 |
| Mar 31, 2025 | Completed final sign-off Apr 2025 | 174 Santa Rosa Av | reroof torch downDetails- Permit
- 202503313356
- Status
- complete
- Filed
- Mar 31, 2025
- Permit issued
- Mar 31, 2025
- Final sign-off
- Apr 28, 2025
- Declared cost
- $10,800
- Address
- 174 Santa Rosa Av
reroof torch down Open the permit page | $10,800 |
| Mar 5, 2025 | Completed final sign-off Apr 2025 | 778 22nd Av | re-roofing. hot works torch down.Details- Permit
- 202503051594
- Status
- complete
- Filed
- Mar 5, 2025
- Permit issued
- Mar 5, 2025
- Final sign-off
- Apr 28, 2025
- Declared cost
- $12,600
- Address
- 778 22nd Av
re-roofing. hot works torch down. Open the permit page | $12,600 |
| Mar 5, 2025 | Completed final sign-off Apr 2025 | 52 Shotwell St | re-roofing. hot works torch down.Details- Permit
- 202503051591
- Status
- complete
- Filed
- Mar 5, 2025
- Permit issued
- Mar 5, 2025
- Final sign-off
- Apr 11, 2025
- Declared cost
- $6,200
- Address
- 52 Shotwell St
re-roofing. hot works torch down. Open the permit page | $6,200 |
| Feb 24, 2025 | Completed final sign-off Apr 2025 | 2155 Alemany Bl | re-roofing about 1100 sq. ft.. hot works.Details- Permit
- 202502240944
- Status
- complete
- Filed
- Feb 24, 2025
- Permit issued
- Feb 24, 2025
- Final sign-off
- Apr 28, 2025
- Declared cost
- $10,200
- Address
- 2155 Alemany Bl
re-roofing about 1100 sq. ft.. hot works. Open the permit page | $10,200 |
| Feb 24, 2025 | Completed final sign-off Apr 2025 | 444 Oxford St | re-roofing, about 800 sq. ft. hot works.Details- Permit
- 202502240943
- Status
- complete
- Filed
- Feb 24, 2025
- Permit issued
- Feb 24, 2025
- Final sign-off
- Apr 28, 2025
- Declared cost
- $10,600
- Address
- 444 Oxford St
re-roofing, about 800 sq. ft. hot works. Open the permit page | $10,600 |
| Feb 13, 2025 | Completed final sign-off Apr 2025 | 2731 23rd St | remove rubber roofing install new rubber roofing only lower leverl in back no hot workDetails- Permit
- 202502130259
- Status
- complete
- Filed
- Feb 13, 2025
- Permit issued
- Feb 13, 2025
- Final sign-off
- Apr 28, 2025
- Declared cost
- $9,200
- Address
- 2731 23rd St
remove rubber roofing install new rubber roofing only lower leverl in back no hot work Open the permit page | $9,200 |
| Jan 3, 2025 | Completed final sign-off Feb 2025 | 283 Juanita Wy | re-roofing. no hot works.Details- Permit
- 202501037660
- Status
- complete
- Filed
- Jan 3, 2025
- Permit issued
- Jan 3, 2025
- Final sign-off
- Feb 4, 2025
- Declared cost
- $11,200
- Address
- 283 Juanita Wy
re-roofing. no hot works. Open the permit page | $11,200 |
| Jan 3, 2025 | Completed final sign-off Jan 2025 | 119 University St | re-roofing. torch down.Details- Permit
- 202501037659
- Status
- complete
- Filed
- Jan 3, 2025
- Permit issued
- Jan 3, 2025
- Final sign-off
- Jan 28, 2025
- Declared cost
- $10,200
- Address
- 119 University St
re-roofing. torch down. Open the permit page | $10,200 |
| Nov 13, 2024 | Completed final sign-off Jan 2025 | 408 Ulloa St | re-roofing: torch down.Details- Permit
- 202411134886
- Status
- complete
- Filed
- Nov 13, 2024
- Permit issued
- Nov 13, 2024
- Final sign-off
- Jan 28, 2025
- Declared cost
- $10,800
- Address
- 408 Ulloa St
re-roofing: torch down. Open the permit page | $10,800 |
| Jul 29, 2024 | Completed final sign-off Feb 2025 | 2146 41st Av | reroofingDetails- Permit
- 202407297431
- Status
- complete
- Filed
- Jul 29, 2024
- Permit issued
- Jul 29, 2024
- Final sign-off
- Feb 4, 2025
- Declared cost
- $10,200
- Address
- 2146 41st Av
reroofing Open the permit page | $10,200 |
| Jul 10, 2024 | Completed final sign-off Jan 2025 | 264 Lexington St | re-roofing.Details- Permit
- 202407106159
- Status
- complete
- Filed
- Jul 10, 2024
- Permit issued
- Jul 10, 2024
- Final sign-off
- Jan 28, 2025
- Declared cost
- $11,800
- Address
- 264 Lexington St
re-roofing. Open the permit page | $11,800 |
| May 24, 2024 | Completed final sign-off Jun 2024 | 854 32nd Av | reroofingDetails- Permit
- 202405242899
- Status
- complete
- Filed
- May 24, 2024
- Permit issued
- May 24, 2024
- Final sign-off
- Jun 7, 2024
- Declared cost
- $11,800
- Address
- 854 32nd Av
reroofing Open the permit page | $11,800 |
| May 17, 2024 | Completed final sign-off Jun 2024 | 177 Harold Av | reroofingDetails- Permit
- 202405172337
- Status
- complete
- Filed
- May 17, 2024
- Permit issued
- May 17, 2024
- Final sign-off
- Jun 7, 2024
- Declared cost
- $10,200
- Address
- 177 Harold Av
reroofing Open the permit page | $10,200 |
| May 2, 2024 | Completed final sign-off May 2024 | 534 Oak St | re-roofingDetails- Permit
- 202405021316
- Status
- complete
- Filed
- May 2, 2024
- Permit issued
- May 3, 2024
- Final sign-off
- May 24, 2024
- Declared cost
- $12,200
- Address
- 534 Oak St
re-roofing Open the permit page | $12,200 |
| Apr 22, 2024 | Completed final sign-off Jun 2024 | 2144 Sloat Bl | reroofingDetails- Permit
- 202404220428
- Status
- complete
- Filed
- Apr 22, 2024
- Permit issued
- Apr 22, 2024
- Final sign-off
- Jun 7, 2024
- Declared cost
- $12,200
- Address
- 2144 Sloat Bl
reroofing Open the permit page | $12,200 |
| Apr 4, 2024 | Completed final sign-off May 2024 | 70 Lopez Av | reroofingDetails- Permit
- 202404049332
- Status
- complete
- Filed
- Apr 4, 2024
- Permit issued
- Apr 4, 2024
- Final sign-off
- May 24, 2024
- Declared cost
- $22,800
- Address
- 70 Lopez Av
reroofing Open the permit page | $22,800 |
| Mar 18, 2024 | Completed final sign-off May 2024 | 1675 09th Av | reroofing. remove tar and gravel for flat roof to install new torch down. no work to (e) roof structural sheathing. (e) roof structural sheathing to remain.Details- Permit
- 202403188005
- Status
- complete
- Filed
- Mar 18, 2024
- Permit issued
- Mar 18, 2024
- Final sign-off
- May 24, 2024
- Declared cost
- $12,800
- Address
- 1675 09th Av
reroofing. remove tar and gravel for flat roof to install new torch down. no work to (e) roof structural sheathing. (e) roof structural sheathing to remain. Open the permit page | $12,800 |
| Feb 20, 2024 | Completed final sign-off May 2024 | 10 Encline Ct | reroofingDetails- Permit
- 202402206168
- Status
- complete
- Filed
- Feb 20, 2024
- Permit issued
- Feb 20, 2024
- Final sign-off
- May 24, 2024
- Declared cost
- $12,800
- Address
- 10 Encline Ct
reroofing Open the permit page | $12,800 |
| Oct 27, 2023 | Completed final sign-off Jun 2024 | 571 33rd Av | reroofingDetails- Permit
- 202310279630
- Status
- complete
- Filed
- Oct 27, 2023
- Permit issued
- Oct 27, 2023
- Final sign-off
- Jun 7, 2024
- Declared cost
- $21,800
- Address
- 571 33rd Av
reroofing Open the permit page | $21,800 |
| Sep 25, 2023 | Completed final sign-off Nov 2023 | 150 Southwood Dr | reroofingDetails- Permit
- 202309257355
- Status
- complete
- Filed
- Sep 25, 2023
- Permit issued
- Sep 25, 2023
- Final sign-off
- Nov 6, 2023
- Declared cost
- $12,600
- Address
- 150 Southwood Dr
reroofing Open the permit page | $12,600 |
| Aug 28, 2023 | Completed final sign-off Nov 2023 | 2010 Bush St | reroofingDetails- Permit
- 202308285379
- Status
- complete
- Filed
- Aug 28, 2023
- Permit issued
- Aug 28, 2023
- Final sign-off
- Nov 6, 2023
- Declared cost
- $10,600
- Address
- 2010 Bush St
reroofing Open the permit page | $10,600 |
| Aug 28, 2023 | Completed final sign-off Nov 2023 | 2012 Bush St | reroofingDetails- Permit
- 202308285377
- Status
- complete
- Filed
- Aug 28, 2023
- Permit issued
- Aug 28, 2023
- Final sign-off
- Nov 6, 2023
- Declared cost
- $10,600
- Address
- 2012 Bush St
reroofing Open the permit page | $10,600 |
| Jan 24, 2023 | Completed final sign-off Nov 2023 | 407 Lakeshore Dr | reroofingDetails- Permit
- 202301240633
- Status
- complete
- Filed
- Jan 24, 2023
- Permit issued
- Jan 24, 2023
- Final sign-off
- Nov 6, 2023
- Declared cost
- $10,200
- Address
- 407 Lakeshore Dr
reroofing Open the permit page | $10,200 |
| Aug 22, 2022 | Completed final sign-off Nov 2022 | 1447 18th Av | reroofingDetails- Permit
- 202208220970
- Status
- complete
- Filed
- Aug 22, 2022
- Permit issued
- Aug 22, 2022
- Final sign-off
- Nov 22, 2022
- Declared cost
- $10,200
- Address
- 1447 18th Av
reroofing Open the permit page | $10,200 |
| Aug 17, 2022 | Completed final sign-off Nov 2022 | 42 Putnam St | reroofingDetails- Permit
- 202208170704
- Status
- complete
- Filed
- Aug 17, 2022
- Permit issued
- Aug 17, 2022
- Final sign-off
- Nov 21, 2022
- Declared cost
- $9,200
- Address
- 42 Putnam St
reroofing Open the permit page | $9,200 |
| Jul 25, 2022 | Completed final sign-off Nov 2022 | 356 16th Av | reroofing. remove tar/gravel, install new rubber torch downDetails- Permit
- 202207259213
- Status
- complete
- Filed
- Jul 25, 2022
- Permit issued
- Jul 25, 2022
- Final sign-off
- Nov 21, 2022
- Declared cost
- $9,800
- Address
- 356 16th Av
reroofing. remove tar/gravel, install new rubber torch down Open the permit page | $9,800 |
| Jul 1, 2022 | Completed final sign-off Sep 2022 | 720 Rutland St | reroofingDetails- Permit
- 202207017617
- Status
- complete
- Filed
- Jul 1, 2022
- Permit issued
- Jul 1, 2022
- Final sign-off
- Sep 7, 2022
- Declared cost
- $9,200
- Address
- 720 Rutland St
reroofing Open the permit page | $9,200 |
| Jun 9, 2022 | Completed final sign-off Sep 2022 | 2089 10th Av | reroofingDetails- Permit
- 202206095960
- Status
- complete
- Filed
- Jun 9, 2022
- Permit issued
- Jun 9, 2022
- Final sign-off
- Sep 7, 2022
- Declared cost
- $9,800
- Address
- 2089 10th Av
reroofing Open the permit page | $9,800 |
| May 19, 2022 | Completed final sign-off Sep 2022 | 650 Quintara St | reroofingDetails- Permit
- 202205194630
- Status
- complete
- Filed
- May 19, 2022
- Permit issued
- May 19, 2022
- Final sign-off
- Sep 8, 2022
- Declared cost
- $10,200
- Address
- 650 Quintara St
reroofing Open the permit page | $10,200 |
| Mar 14, 2022 | Completed final sign-off Nov 2022 | 2 07th Av | reroofing.Details- Permit
- 202203149903
- Status
- complete
- Filed
- Mar 14, 2022
- Permit issued
- Mar 14, 2022
- Final sign-off
- Nov 21, 2022
- Declared cost
- $9,600
- Address
- 2 07th Av
reroofing. Open the permit page | $9,600 |
| Feb 10, 2022 | Completed final sign-off Sep 2022 | 1600 12th Av | reroofingDetails- Permit
- 202202107716
- Status
- complete
- Filed
- Feb 10, 2022
- Permit issued
- Feb 10, 2022
- Final sign-off
- Sep 8, 2022
- Declared cost
- $9,200
- Address
- 1600 12th Av
reroofing Open the permit page | $9,200 |
| Feb 10, 2022 | Completed final sign-off Mar 2022 | 1886 11th Av | reroofingDetails- Permit
- 202202107715
- Status
- complete
- Filed
- Feb 10, 2022
- Permit issued
- Feb 10, 2022
- Final sign-off
- Mar 3, 2022
- Declared cost
- $9,800
- Address
- 1886 11th Av
reroofing Open the permit page | $9,800 |
| Jan 24, 2022 | Completed final sign-off Mar 2022 | 118 Cayuga Av | reroofingDetails- Permit
- 202201246473
- Status
- complete
- Filed
- Jan 24, 2022
- Permit issued
- Jan 24, 2022
- Final sign-off
- Mar 3, 2022
- Declared cost
- $9,200
- Address
- 118 Cayuga Av
reroofing Open the permit page | $9,200 |
| Jan 24, 2022 | Completed final sign-off Mar 2022 | 513 Rhode Island St | reroofingDetails- Permit
- 202201246474
- Status
- complete
- Filed
- Jan 24, 2022
- Permit issued
- Jan 24, 2022
- Final sign-off
- Mar 15, 2022
- Declared cost
- $10,200
- Address
- 513 Rhode Island St
reroofing Open the permit page | $10,200 |
| Nov 29, 2021 | Completed final sign-off Mar 2022 | 231 Holly Park Cr | reroofingDetails- Permit
- 202111293204
- Status
- complete
- Filed
- Nov 29, 2021
- Permit issued
- Nov 29, 2021
- Final sign-off
- Mar 15, 2022
- Declared cost
- $8,800
- Address
- 231 Holly Park Cr
reroofing Open the permit page | $8,800 |
| Nov 29, 2021 | Completed final sign-off Mar 2022 | 114 Moffitt St | reroofingDetails- Permit
- 202111293206
- Status
- complete
- Filed
- Nov 29, 2021
- Permit issued
- Nov 29, 2021
- Final sign-off
- Mar 15, 2022
- Declared cost
- $9,200
- Address
- 114 Moffitt St
reroofing Open the permit page | $9,200 |
| Nov 17, 2021 | Completed final sign-off Mar 2022 | 443 09th Av | re-roofing.Details- Permit
- 202111172557
- Status
- complete
- Filed
- Nov 17, 2021
- Permit issued
- Nov 17, 2021
- Final sign-off
- Mar 3, 2022
- Declared cost
- $9,800
- Address
- 443 09th Av
re-roofing. Open the permit page | $9,800 |
| Nov 17, 2021 | Completed final sign-off Mar 2022 | 5630 Anza St | reroofingDetails- Permit
- 202111172566
- Status
- complete
- Filed
- Nov 17, 2021
- Permit issued
- Nov 17, 2021
- Final sign-off
- Mar 3, 2022
- Declared cost
- $9,200
- Address
- 5630 Anza St
reroofing Open the permit page | $9,200 |
| Nov 10, 2021 | Completed final sign-off Mar 2022 | 4325 Cesar Chavez St | reroofingDetails- Permit
- 202111102170
- Status
- complete
- Filed
- Nov 10, 2021
- Permit issued
- Nov 10, 2021
- Final sign-off
- Mar 15, 2022
- Declared cost
- $9,600
- Address
- 4325 Cesar Chavez St
reroofing Open the permit page | $9,600 |
| Sep 30, 2021 | Completed final sign-off Mar 2022 | 175 18th Av | reroofingDetails- Permit
- 202109309538
- Status
- complete
- Filed
- Sep 30, 2021
- Permit issued
- Sep 30, 2021
- Final sign-off
- Mar 3, 2022
- Declared cost
- $7,200
- Address
- 175 18th Av
reroofing Open the permit page | $7,200 |
| Aug 27, 2021 | Completed final sign-off Oct 2021 | 5624 Anza St | re-roofingDetails- Permit
- 202108277263
- Status
- complete
- Filed
- Aug 27, 2021
- Permit issued
- Aug 27, 2021
- Final sign-off
- Oct 8, 2021
- Declared cost
- $9,200
- Address
- 5624 Anza St
re-roofing Open the permit page | $9,200 |
| Aug 27, 2021 | Completed final sign-off Oct 2021 | 1583 35th Av | re-roofingDetails- Permit
- 202108277265
- Status
- complete
- Filed
- Aug 27, 2021
- Permit issued
- Aug 27, 2021
- Final sign-off
- Oct 8, 2021
- Declared cost
- $6,200
- Address
- 1583 35th Av
re-roofing Open the permit page | $6,200 |
| Aug 9, 2021 | Completed final sign-off Oct 2021 | 24 Ringold St | reroofing.Details- Permit
- 202108096019
- Status
- complete
- Filed
- Aug 9, 2021
- Permit issued
- Aug 9, 2021
- Final sign-off
- Oct 8, 2021
- Declared cost
- $8,200
- Address
- 24 Ringold St
reroofing. Open the permit page | $8,200 |
| Aug 9, 2021 | Completed final sign-off Oct 2021 | 2050 21st Av | reroofing.Details- Permit
- 202108096021
- Status
- complete
- Filed
- Aug 9, 2021
- Permit issued
- Aug 9, 2021
- Final sign-off
- Oct 8, 2021
- Declared cost
- $9,600
- Address
- 2050 21st Av
reroofing. Open the permit page | $9,600 |
| Jul 23, 2021 | Completed final sign-off Oct 2021 | 236 Wheeler Av | reroofingDetails- Permit
- 202107234991
- Status
- complete
- Filed
- Jul 23, 2021
- Permit issued
- Jul 23, 2021
- Final sign-off
- Oct 8, 2021
- Declared cost
- $8,600
- Address
- 236 Wheeler Av
reroofing Open the permit page | $8,600 |
| Jun 4, 2021 | Completed final sign-off Oct 2021 | 501 Amazon Av | reroofingDetails- Permit
- 202106041657
- Status
- complete
- Filed
- Jun 4, 2021
- Permit issued
- Jun 4, 2021
- Final sign-off
- Oct 8, 2021
- Declared cost
- $8,600
- Address
- 501 Amazon Av
reroofing Open the permit page | $8,600 |
| May 14, 2021 | Completed final sign-off Oct 2021 | 2091 21st Av | reroofingDetails- Permit
- 202105140390
- Status
- complete
- Filed
- May 14, 2021
- Permit issued
- May 14, 2021
- Final sign-off
- Oct 8, 2021
- Declared cost
- $9,200
- Address
- 2091 21st Av
reroofing Open the permit page | $9,200 |
| Apr 21, 2021 | Completed final sign-off Oct 2021 | 390 Chenery St | reroofing.Details- Permit
- 202104219008
- Status
- complete
- Filed
- Apr 21, 2021
- Permit issued
- Apr 21, 2021
- Final sign-off
- Oct 8, 2021
- Declared cost
- $9,600
- Address
- 390 Chenery St
reroofing. Open the permit page | $9,600 |
| Dec 22, 2020 | Completed final sign-off Oct 2021 | 26 Talbert St | reroofingDetails- Permit
- 202012221545
- Status
- complete
- Filed
- Dec 22, 2020
- Permit issued
- Dec 22, 2020
- Final sign-off
- Oct 8, 2021
- Declared cost
- $7,200
- Address
- 26 Talbert St
reroofing Open the permit page | $7,200 |
| Nov 19, 2020 | Completed final sign-off Dec 2020 | 1217 Douglass St | reroofingDetails- Permit
- 202011199259
- Status
- complete
- Filed
- Nov 19, 2020
- Permit issued
- Nov 19, 2020
- Final sign-off
- Dec 22, 2020
- Declared cost
- $8,200
- Address
- 1217 Douglass St
reroofing Open the permit page | $8,200 |
| Nov 6, 2020 | Completed final sign-off Dec 2020 | 2046 10th Av | re-roofingDetails- Permit
- 202011068360
- Status
- complete
- Filed
- Nov 6, 2020
- Permit issued
- Nov 6, 2020
- Final sign-off
- Dec 21, 2020
- Declared cost
- $8,200
- Address
- 2046 10th Av
re-roofing Open the permit page | $8,200 |
| Nov 6, 2020 | Completed final sign-off Dec 2020 | 2122 26th Av | re-roofingDetails- Permit
- 202011068362
- Status
- complete
- Filed
- Nov 6, 2020
- Permit issued
- Nov 6, 2020
- Final sign-off
- Dec 21, 2020
- Declared cost
- $8,200
- Address
- 2122 26th Av
re-roofing Open the permit page | $8,200 |
| Aug 21, 2020 | Never finaled issued Aug 2020, no final | 97 Amber Dr | re-roofingDetails- Permit
- 202008212272
- Status
- issued
- Filed
- Aug 21, 2020
- Permit issued
- Aug 21, 2020
- Declared cost
- $6,600
- Address
- 97 Amber Dr
re-roofing Open the permit page | $6,600 |
| Aug 10, 2020 | Completed final sign-off Dec 2020 | 143 Hearst Av | removal tar & gravel install new rubber touch down.Details- Permit
- 202008101418
- Status
- complete
- Filed
- Aug 10, 2020
- Permit issued
- Aug 10, 2020
- Final sign-off
- Dec 21, 2020
- Declared cost
- $7,200
- Address
- 143 Hearst Av
removal tar & gravel install new rubber touch down. Open the permit page | $7,200 |
| Jul 28, 2020 | Completed final sign-off Aug 2020 | 1341 Vallejo St | reroofingDetails- Permit
- 202007280841
- Status
- complete
- Filed
- Jul 28, 2020
- Permit issued
- Jul 28, 2020
- Final sign-off
- Aug 24, 2020
- Declared cost
- $8,900
- Address
- 1341 Vallejo St
reroofing Open the permit page | $8,900 |
| Jul 20, 2020 | Completed final sign-off Dec 2020 | 460 Pennsylvania Av | reroofingDetails- Permit
- 202007200474
- Status
- complete
- Filed
- Jul 20, 2020
- Permit issued
- Jul 20, 2020
- Final sign-off
- Dec 21, 2020
- Declared cost
- $9,800
- Address
- 460 Pennsylvania Av
reroofing Open the permit page | $9,800 |
| Jul 20, 2020 | Completed final sign-off Dec 2020 | 143 Collins St | reroofingDetails- Permit
- 202007200472
- Status
- complete
- Filed
- Jul 20, 2020
- Permit issued
- Jul 20, 2020
- Final sign-off
- Dec 21, 2020
- Declared cost
- $8,800
- Address
- 143 Collins St
reroofing Open the permit page | $8,800 |
| Jun 29, 2020 | Completed final sign-off Dec 2020 | 2655 Filbert St | reroofing. remove tar and gravel. haul away all roof debris and install new bitumen rubber roofing material torch down.Details- Permit
- 202006299342
- Status
- complete
- Filed
- Jun 29, 2020
- Permit issued
- Jul 1, 2020
- Final sign-off
- Dec 21, 2020
- Declared cost
- $9,000
- Address
- 2655 Filbert St
reroofing. remove tar and gravel. haul away all roof debris and install new bitumen rubber roofing material torch down. Open the permit page | $9,000 |
| Jun 8, 2020 | Completed final sign-off Dec 2020 | 1388 08th Av | reroofing. remove tar and gravel. install new modified bitumen rubber roofing material torch downDetails- Permit
- 202006088254
- Status
- complete
- Filed
- Jun 8, 2020
- Permit issued
- Jun 9, 2020
- Final sign-off
- Dec 21, 2020
- Declared cost
- $9,000
- Address
- 1388 08th Av
reroofing. remove tar and gravel. install new modified bitumen rubber roofing material torch down Open the permit page | $9,000 |
| May 26, 2020 | Completed final sign-off Dec 2020 | 49 Dorland St | reroofingDetails- Permit
- 202005267796
- Status
- complete
- Filed
- May 26, 2020
- Permit issued
- Jun 4, 2020
- Final sign-off
- Dec 22, 2020
- Declared cost
- $9,200
- Address
- 49 Dorland St
reroofing Open the permit page | $9,200 |
| Feb 14, 2020 | Completed final sign-off Mar 2020 | 418 17th Av | reroofingDetails- Permit
- 202002144517
- Status
- complete
- Filed
- Feb 14, 2020
- Permit issued
- Feb 14, 2020
- Final sign-off
- Mar 10, 2020
- Declared cost
- $8,200
- Address
- 418 17th Av
reroofing Open the permit page | $8,200 |
| Feb 6, 2020 | Completed final sign-off Feb 2020 | 198 Pope St | reroofingDetails- Permit
- 202002063706
- Status
- complete
- Filed
- Feb 6, 2020
- Permit issued
- Feb 6, 2020
- Final sign-off
- Feb 10, 2020
- Declared cost
- $7,200
- Address
- 198 Pope St
reroofing Open the permit page | $7,200 |
| Feb 3, 2020 | Completed final sign-off Mar 2020 | 2018 47th Av | reroofingDetails- Permit
- 202002033354
- Status
- complete
- Filed
- Feb 3, 2020
- Permit issued
- Feb 3, 2020
- Final sign-off
- Mar 10, 2020
- Declared cost
- $7,800
- Address
- 2018 47th Av
reroofing Open the permit page | $7,800 |
| Jan 28, 2020 | Completed final sign-off Mar 2020 | 2143 29th Av | reroofingDetails- Permit
- 202001282903
- Status
- complete
- Filed
- Jan 28, 2020
- Permit issued
- Jan 28, 2020
- Final sign-off
- Mar 10, 2020
- Declared cost
- $7,600
- Address
- 2143 29th Av
reroofing Open the permit page | $7,600 |
| Nov 20, 2019 | Completed final sign-off Mar 2020 | 218 Peabody St | re-roofingDetails- Permit
- 201911207763
- Status
- complete
- Filed
- Nov 20, 2019
- Permit issued
- Nov 20, 2019
- Final sign-off
- Mar 10, 2020
- Declared cost
- $6,800
- Address
- 218 Peabody St
re-roofing Open the permit page | $6,800 |
| Nov 7, 2019 | Completed final sign-off Mar 2020 | 254 Holladay Av | reroofingDetails- Permit
- 201911076681
- Status
- complete
- Filed
- Nov 7, 2019
- Permit issued
- Nov 7, 2019
- Final sign-off
- Mar 10, 2020
- Declared cost
- $6,800
- Address
- 254 Holladay Av
reroofing Open the permit page | $6,800 |
| Oct 15, 2019 | Completed final sign-off Mar 2020 | 636 London St | reroofingDetails- Permit
- 201910154377
- Status
- complete
- Filed
- Oct 15, 2019
- Permit issued
- Oct 15, 2019
- Final sign-off
- Mar 10, 2020
- Declared cost
- $6,500
- Address
- 636 London St
reroofing Open the permit page | $6,500 |
| Sep 27, 2019 | Completed final sign-off Dec 2019 | 715 Plymouth Av | reroofingDetails- Permit
- 201909272911
- Status
- complete
- Filed
- Sep 27, 2019
- Permit issued
- Sep 27, 2019
- Final sign-off
- Dec 18, 2019
- Declared cost
- $6,800
- Address
- 715 Plymouth Av
reroofing Open the permit page | $6,800 |
| Sep 9, 2019 | Completed final sign-off Dec 2019 | 237 Holly Park Cr | reroofing.Details- Permit
- 201909091012
- Status
- complete
- Filed
- Sep 9, 2019
- Permit issued
- Sep 9, 2019
- Final sign-off
- Dec 18, 2019
- Declared cost
- $2,600
- Address
- 237 Holly Park Cr
reroofing. Open the permit page | $2,600 |
| Sep 9, 2019 | Completed final sign-off Dec 2019 | 366 28th Av | reroofing.Details- Permit
- 201909091013
- Status
- complete
- Filed
- Sep 9, 2019
- Permit issued
- Sep 9, 2019
- Final sign-off
- Dec 18, 2019
- Declared cost
- $8,200
- Address
- 366 28th Av
reroofing. Open the permit page | $8,200 |
| Aug 26, 2019 | Completed final sign-off Dec 2019 | 435 11th Av | reroofingDetails- Permit
- 201908269800
- Status
- complete
- Filed
- Aug 26, 2019
- Permit issued
- Aug 26, 2019
- Final sign-off
- Dec 18, 2019
- Declared cost
- $8,200
- Address
- 435 11th Av
reroofing Open the permit page | $8,200 |
| Jul 31, 2019 | Completed final sign-off Aug 2019 | 34 Harold Av | reroofingDetails- Permit
- 201907317454
- Status
- complete
- Filed
- Jul 31, 2019
- Permit issued
- Jul 31, 2019
- Final sign-off
- Aug 9, 2019
- Declared cost
- $8,200
- Address
- 34 Harold Av
reroofing Open the permit page | $8,200 |
| May 21, 2019 | Completed final sign-off Dec 2019 | 1222 Egbert Av | reroofingDetails- Permit
- 201905211295
- Status
- complete
- Filed
- May 21, 2019
- Permit issued
- May 21, 2019
- Final sign-off
- Dec 18, 2019
- Declared cost
- $6,800
- Address
- 1222 Egbert Av
reroofing Open the permit page | $6,800 |
| May 13, 2019 | Completed final sign-off Dec 2019 | 967 Goettingen St | reroofingDetails- Permit
- 201905130431
- Status
- complete
- Filed
- May 13, 2019
- Permit issued
- May 13, 2019
- Final sign-off
- Dec 18, 2019
- Declared cost
- $6,800
- Address
- 967 Goettingen St
reroofing Open the permit page | $6,800 |
| Apr 29, 2019 | Completed final sign-off Dec 2019 | 830 43rd Av | reroofing: remove tar & gravel. install new rubber torch downDetails- Permit
- 201904299142
- Status
- complete
- Filed
- Apr 29, 2019
- Permit issued
- Apr 29, 2019
- Final sign-off
- Dec 18, 2019
- Declared cost
- $7,900
- Address
- 830 43rd Av
reroofing: remove tar & gravel. install new rubber torch down Open the permit page | $7,900 |
| Apr 22, 2019 | Completed final sign-off Mar 2020 | 430 College Av | re-roofingDetails- Permit
- 201904228550
- Status
- complete
- Filed
- Apr 22, 2019
- Permit issued
- Apr 22, 2019
- Final sign-off
- Mar 10, 2020
- Declared cost
- $9,800
- Address
- 430 College Av
re-roofing Open the permit page | $9,800 |
| Apr 19, 2019 | Completed final sign-off Dec 2019 | 415 Moscow St | reroofingDetails- Permit
- 201904198431
- Status
- complete
- Filed
- Apr 19, 2019
- Permit issued
- Apr 19, 2019
- Final sign-off
- Dec 18, 2019
- Declared cost
- $6,600
- Address
- 415 Moscow St
reroofing Open the permit page | $6,600 |
| Apr 15, 2019 | Completed final sign-off Dec 2019 | 732 Noriega St | reroofingDetails- Permit
- 201904157987
- Status
- complete
- Filed
- Apr 15, 2019
- Permit issued
- Apr 15, 2019
- Final sign-off
- Dec 18, 2019
- Declared cost
- $8,200
- Address
- 732 Noriega St
reroofing Open the permit page | $8,200 |
| Mar 22, 2019 | Completed final sign-off Mar 2019 | 97 Valley St | reroofingDetails- Permit
- 201903226009
- Status
- complete
- Filed
- Mar 22, 2019
- Permit issued
- Mar 22, 2019
- Final sign-off
- Mar 28, 2019
- Declared cost
- $6,200
- Address
- 97 Valley St
reroofing Open the permit page | $6,200 |
| Mar 11, 2019 | Completed final sign-off Mar 2019 | 2190 21st Av | reroofingDetails- Permit
- 201903114836
- Status
- complete
- Filed
- Mar 11, 2019
- Permit issued
- Mar 11, 2019
- Final sign-off
- Mar 27, 2019
- Declared cost
- $7,200
- Address
- 2190 21st Av
reroofing Open the permit page | $7,200 |
| Feb 21, 2019 | Completed final sign-off Mar 2019 | 1854 41st Av | reroofingDetails- Permit
- 201902213435
- Status
- complete
- Filed
- Feb 21, 2019
- Permit issued
- Feb 21, 2019
- Final sign-off
- Mar 28, 2019
- Declared cost
- $8,200
- Address
- 1854 41st Av
reroofing Open the permit page | $8,200 |
| Feb 15, 2019 | Completed final sign-off Mar 2019 | 5636 Anza St | reroofingDetails- Permit
- 201902153071
- Status
- complete
- Filed
- Feb 15, 2019
- Permit issued
- Feb 15, 2019
- Final sign-off
- Mar 27, 2019
- Declared cost
- $7,200
- Address
- 5636 Anza St
reroofing Open the permit page | $7,200 |
| Jan 22, 2019 | Completed final sign-off Mar 2019 | 82 Valley St | reroofingDetails- Permit
- 201901220822
- Status
- complete
- Filed
- Jan 22, 2019
- Permit issued
- Jan 22, 2019
- Final sign-off
- Mar 28, 2019
- Declared cost
- $7,200
- Address
- 82 Valley St
reroofing Open the permit page | $7,200 |
| Nov 9, 2018 | Completed final sign-off Mar 2019 | 200 San Jose Av | re-roofing. no change to pitched roof. in kind replacementDetails- Permit
- 201811095476
- Status
- complete
- Filed
- Nov 9, 2018
- Permit issued
- Nov 9, 2018
- Final sign-off
- Mar 27, 2019
- Declared cost
- $7,200
- Address
- 200 San Jose Av
re-roofing. no change to pitched roof. in kind replacement Open the permit page | $7,200 |
| Nov 2, 2018 | Completed final sign-off Mar 2019 | 1348 Bacon St | reroofingDetails- Permit
- 201811024912
- Status
- complete
- Filed
- Nov 2, 2018
- Permit issued
- Nov 2, 2018
- Final sign-off
- Mar 27, 2019
- Declared cost
- $7,200
- Address
- 1348 Bacon St
reroofing Open the permit page | $7,200 |
| Oct 22, 2018 | Completed final sign-off Mar 2019 | 2634 45th Av | re-roofingDetails- Permit
- 201810223743
- Status
- complete
- Filed
- Oct 22, 2018
- Permit issued
- Oct 22, 2018
- Final sign-off
- Mar 27, 2019
- Declared cost
- $7,000
- Address
- 2634 45th Av
re-roofing Open the permit page | $7,000 |
| Oct 16, 2018 | Completed final sign-off Mar 2019 | 521 46th Av | re-roofingDetails- Permit
- 201810163258
- Status
- complete
- Filed
- Oct 16, 2018
- Permit issued
- Oct 16, 2018
- Final sign-off
- Mar 27, 2019
- Declared cost
- $7,200
- Address
- 521 46th Av
re-roofing Open the permit page | $7,200 |
| Sep 26, 2018 | Completed final sign-off Dec 2018 | 117 28th St | reroofingDetails- Permit
- 201809261412
- Status
- complete
- Filed
- Sep 26, 2018
- Permit issued
- Sep 26, 2018
- Final sign-off
- Dec 4, 2018
- Declared cost
- $7,280
- Address
- 117 28th St
reroofing Open the permit page | $7,280 |
| Sep 10, 2018 | Completed final sign-off Mar 2019 | 510 Hearst Av | reroofing. remove shingles, install new 30 years shingleDetails- Permit
- 201809109512
- Status
- complete
- Filed
- Sep 10, 2018
- Permit issued
- Sep 10, 2018
- Final sign-off
- Mar 27, 2019
- Declared cost
- $5,200
- Address
- 510 Hearst Av
reroofing. remove shingles, install new 30 years shingle Open the permit page | $5,200 |
| Sep 6, 2018 | Completed final sign-off Dec 2018 | 1859 43rd Av | reroofingDetails- Permit
- 201809069240
- Status
- complete
- Filed
- Sep 6, 2018
- Permit issued
- Sep 6, 2018
- Final sign-off
- Dec 4, 2018
- Declared cost
- $6,200
- Address
- 1859 43rd Av
reroofing Open the permit page | $6,200 |
| Aug 24, 2018 | Completed final sign-off Dec 2018 | 1232 46th Av | re-roofingDetails- Permit
- 201808248220
- Status
- complete
- Filed
- Aug 24, 2018
- Permit issued
- Aug 24, 2018
- Final sign-off
- Dec 4, 2018
- Declared cost
- $7,800
- Address
- 1232 46th Av
re-roofing Open the permit page | $7,800 |
| Aug 16, 2018 | Completed final sign-off Dec 2018 | 5567 Diamond Heights Bl | reroofingDetails- Permit
- 201808167485
- Status
- complete
- Filed
- Aug 16, 2018
- Permit issued
- Aug 16, 2018
- Final sign-off
- Dec 4, 2018
- Declared cost
- $6,800
- Address
- 5567 Diamond Heights Bl
reroofing Open the permit page | $6,800 |
| Aug 13, 2018 | Completed final sign-off Dec 2018 | 23 Congo St | reroofingDetails- Permit
- 201808137125
- Status
- complete
- Filed
- Aug 13, 2018
- Permit issued
- Aug 13, 2018
- Final sign-off
- Dec 4, 2018
- Declared cost
- $6,600
- Address
- 23 Congo St
reroofing Open the permit page | $6,600 |
| Jul 23, 2018 | Completed final sign-off Dec 2018 | 278 Holladay Av | reroofingDetails- Permit
- 201807235178
- Status
- complete
- Filed
- Jul 23, 2018
- Permit issued
- Jul 23, 2018
- Final sign-off
- Dec 4, 2018
- Declared cost
- $6,000
- Address
- 278 Holladay Av
reroofing Open the permit page | $6,000 |