Rem Solutions
- Based in
- San Ramon
- On San Francisco permits
- Jan 2010 to Mar 2010
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 17, 2010 | Completed final sign-off Aug 2010 | 1201 Palou Av | remove lath/plaster walls (only), replace with 1/2" rock, frame in new closet, move bedroom door 2' to left, puch back interior wall, insulate exterior walls, upgrade kitchen & bathroom wiring, replace copper & tub. revision to p/a 2010.0111.4486.Details
remove lath/plaster walls (only), replace with 1/2" rock, frame in new closet, move bedroom door 2' to left, puch back interior wall, insulate exterior walls, upgrade kitchen & bathroom wiring, replace copper & tub. revision to p/a 2010.0111.4486. | $10,000 |
| Jan 11, 2010 | Completed final sign-off Aug 2010 | 1201 Palou Av | repair interior wall at entry, replace 11windows. change out 12" starter board. new interior door. repair cabs in kind.Details
repair interior wall at entry, replace 11windows. change out 12" starter board. new interior door. repair cabs in kind. | $20,000 |