Regan Scott Kosch
- Based in
- San Jose
- On San Francisco permits
- Mar 2014 to Mar 2014
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 28, 2014 | Never finaled issued Apr 2014, no final | 65 Zircon Pl | revision to 201304094115 for facade addition under existing entry door overhang, cosmetec facade changes, removal of rear wall bay window and reconfiguration of gr fl baths. existing interior stair to remain. adjustment of some window and exterior doors, change of skylight size and shape, adjustmentDetails
revision to 201304094115 for facade addition under existing entry door overhang, cosmetec facade changes, removal of rear wall bay window and reconfiguration of gr fl baths. existing interior stair to remain. adjustment of some window and exterior doors, change of skylight size and shape, adjustment |