Redoak Construction
- Based in
- El Sobrante
- On San Francisco permits
- Jul 2018 to Sep 2024
- Last 24 months
- 0 permits filed
8 permits since 2000: 6 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 24, 2024 | Completed final sign-off Dec 2024 | 4760 19th St | in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 1 shower pan(s). | $25,000 |
| Apr 30, 2024 | Completed final sign-off Sep 2024 | 2862 Bush St | revision to pa#202003137090. 1)change stair at deck to garden from switch back to spiral. 2)nw a/c condenser unit on roof. 3)nw hvac unit on roof. 4)2 nw sewage + rain water ejectors(sumpumps) on ground fl. 5)nw tankless water heater. 6)nw sink in primary bathrm. 7)washer/dryer nw location.Details
revision to pa#202003137090. 1)change stair at deck to garden from switch back to spiral. 2)nw a/c condenser unit on roof. 3)nw hvac unit on roof. 4)2 nw sewage + rain water ejectors(sumpumps) on ground fl. 5)nw tankless water heater. 6)nw sink in primary bathrm. 7)washer/dryer nw location. | |
| Jan 12, 2023 | Completed final sign-off May 2024 | 172 16th Av | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). alteration of service equipment. installing gas line. need a "green tag" for electrical service equipment.Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 3 bathroom(s) in 1st fl, 2nd fl with 1 shower pan(s). alteration of service equipment. installing gas line. need a "green tag" for electrical service equipment. | $145,000 |
| Feb 1, 2022 | Completed final sign-off Mar 2023 | 69 Beaver St | new door at bottom floor rear yard. new wall opening & pocket door on upper level. new master suite reconfiguration on lower level.Details
new door at bottom floor rear yard. new wall opening & pocket door on upper level. new master suite reconfiguration on lower level. | $85,000 |
| Oct 22, 2021 | Completed final sign-off Aug 2024 | 2862 Bush St | demolition:remove non-load bearing partitions,non-working boiler and old concret flat work(basement)Details
demolition:remove non-load bearing partitions,non-working boiler and old concret flat work(basement) | $18,000 |
| Feb 25, 2021 | In progress issued Jan 2024 | 19 Norwich St | 1st floor remodel bedroom & bathroom. add 63 sqft extension in the projection to building rear end under the 2nd floor. add 1 new bathroom. 2nd floor remodel interior with no added sqft. new rear deck. top floor new roof deck.Details
1st floor remodel bedroom & bathroom. add 63 sqft extension in the projection to building rear end under the 2nd floor. add 1 new bathroom. 2nd floor remodel interior with no added sqft. new rear deck. top floor new roof deck. | $300,000 |
| Mar 13, 2020 | Completed final sign-off Sep 2024 | 2862 Bush St | excavate and underpin existing ground fl and renovate to additional living space. renovate existing first and second story above.Details
excavate and underpin existing ground fl and renovate to additional living space. renovate existing first and second story above. | $800,000 |
| Jul 12, 2018 | Expired or cancelled expired Apr 2026 | 2868 Bush St | addition (n) 3rd floor & horizontal addition @ rear of (e) sfd. @ ground fl: restore (e) entry stair per hist reference, remove (e) & provide (n) interior stair & partitions. @ 2nd fl: restore (e) entryway, remove & reconfigure walls,provide (n) walls,stairs to 3rd fl.Details
addition (n) 3rd floor & horizontal addition @ rear of (e) sfd. @ ground fl: restore (e) entry stair per hist reference, remove (e) & provide (n) interior stair & partitions. @ 2nd fl: restore (e) entryway, remove & reconfigure walls,provide (n) walls,stairs to 3rd fl. | $1,100,000 |