Reddington Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2014 to Mar 2016
- Last 24 months
- 0 permits filed
17 permits since 2000: 12 completed, 4 never finaled, 1 expired or cancelled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 23, 2016 | Never finaled issued Apr 2016, no final | 354 28th St | new site wall construction.Details
new site wall construction. | $15,000 |
| Mar 21, 2016 | Completed final sign-off Feb 2017 | 1381 Sanchez St | remodel upstairs bathroom, remodel downstairs master bathroom. new flooring and new paintDetails
remodel upstairs bathroom, remodel downstairs master bathroom. new flooring and new paint | $40,000 |
| Jan 7, 2016 | Never finaled issued Jan 2016, no final | 354 28th St | partial foundation replacement & new rear site retaining wallDetails
partial foundation replacement & new rear site retaining wall | $15,000 |
| Dec 1, 2015 | Never finaled issued Dec 2015, no final | 354 28th St | remove lath and plaster interior walls.Details
remove lath and plaster interior walls. | $3,500 |
| Nov 3, 2015 | Completed final sign-off Sep 2016 | 260 Divisadero St | change of use from group b retial to group b ltd restaurant use. t/i of a g/f comm'l space including installation of ada bathroom, clean/production rm, food prep., sales counter, seating, new fixtures and finishesDetails
change of use from group b retial to group b ltd restaurant use. t/i of a g/f comm'l space including installation of ada bathroom, clean/production rm, food prep., sales counter, seating, new fixtures and finishes | $50,000 |
| Jul 1, 2015 | Expired or cancelled cancelled Aug 2022 | 2095 Chestnut St | no work to be performed-need 312 mailing notification . all work has already been completed and signed off on application number#201410249804.Details
no work to be performed-need 312 mailing notification . all work has already been completed and signed off on application number#201410249804. | |
| Jun 16, 2015 | Completed final sign-off Nov 2015 | 4181 26th St | existing tile stone at front deck & stairs to be removed and replaced by new bluestone tile. replace in-kind.Details
existing tile stone at front deck & stairs to be removed and replaced by new bluestone tile. replace in-kind. | $20,000 |
| May 19, 2015 | Never finaled issued Jan 2016, no final | 354 28th St | 1st floor addition @ rear to include 2 bedroom, 2 bath, laundry rm & stairs to connect 1st & 2nd floors. 2nd fl kitchen, family room remodel.Details
1st floor addition @ rear to include 2 bedroom, 2 bath, laundry rm & stairs to connect 1st & 2nd floors. 2nd fl kitchen, family room remodel. | $400,000 |
| Jan 15, 2015 | Completed final sign-off Jun 2015 | 2095 Chestnut St | revision to permit 201410249804; change door on steiner st side to fixed window, change window to match chestnut st. height.Details
revision to permit 201410249804; change door on steiner st side to fixed window, change window to match chestnut st. height. | $1,500 |
| Jan 7, 2015 | Completed final sign-off Mar 2015 | 2095 Chestnut St | soft demo pending appeal of appplic. #201410249804. no structural. includes tile removal, 2 (e) counters, sheetrock on each 4 2walls.Details
soft demo pending appeal of appplic. #201410249804. no structural. includes tile removal, 2 (e) counters, sheetrock on each 4 2walls. | $2,500 |
| Oct 31, 2014 | Completed final sign-off Jan 2015 | 34 Porter St | repair in kind stucco on building front (with scaffold) new paint, new concrete at driveway-side, walk-entrywayDetails
repair in kind stucco on building front (with scaffold) new paint, new concrete at driveway-side, walk-entryway | $40,000 |
| Oct 24, 2014 | Completed final sign-off Jun 2015 | 2095 Chestnut St | demolish (e) counters, cabinets, drop ceiling, lighting, finishes, front facade door, windows, kitchen walls. renovate (e) restroom to ada, (n) kitchen, cabinetry lighting, finishes, equipment, storage, mezzanine, front facade windows and door. change tenant to glaze teriyakiDetails
demolish (e) counters, cabinets, drop ceiling, lighting, finishes, front facade door, windows, kitchen walls. renovate (e) restroom to ada, (n) kitchen, cabinetry lighting, finishes, equipment, storage, mezzanine, front facade windows and door. change tenant to glaze teriyaki | $110,250 |
| Jul 31, 2014 | Completed final sign-off Oct 2015 | 667 Mangels Av | revision to appn. 201406209008; addition of built-in cabinet & bench in existing hallway, no new conditioned area, no exterior work, all work is interior.Details
revision to appn. 201406209008; addition of built-in cabinet & bench in existing hallway, no new conditioned area, no exterior work, all work is interior. | $75,000 |
| Jul 10, 2014 | Completed final sign-off Aug 2014 | 417 27th St | structural upgrade of current en roof rafters. new 1 3/4 x 5 1/2 lvl on solar panel side. new 2x6 on non solar side. new 2x4 collar tie system/new drywall 4/8 type 1Details
structural upgrade of current en roof rafters. new 1 3/4 x 5 1/2 lvl on solar panel side. new 2x6 on non solar side. new 2x4 collar tie system/new drywall 4/8 type 1 | $15,000 |
| Jul 2, 2014 | Completed final sign-off Aug 2014 | 1098 Page St | unit 201: removal of non structural hallway wall, new tile in bathroom, new electric outlets in bedroom wall, new hardwood floors/new paintDetails
unit 201: removal of non structural hallway wall, new tile in bathroom, new electric outlets in bedroom wall, new hardwood floors/new paint | $12,500 |
| May 28, 2014 | Completed final sign-off May 2014 | 2267 Francisco St | permit issued for pa# 201207054159 had a roof deck on it that was never part of the project. to clarify no roof deck in the bldg.Details
permit issued for pa# 201207054159 had a roof deck on it that was never part of the project. to clarify no roof deck in the bldg. | |
| Apr 10, 2014 | Completed final sign-off Jul 2014 | 1258 12th Av | to comply with physical inspection report # cc-7529, existing fire resistant wall to be repaired & sealed with stucco rear exterior stair to get new handrail & closed risers, ceilings in units #1,3& 4 to be replaced with new sypsum board .Details
to comply with physical inspection report # cc-7529, existing fire resistant wall to be repaired & sealed with stucco rear exterior stair to get new handrail & closed risers, ceilings in units #1,3& 4 to be replaced with new sypsum board . | $2,000 |