Red Road Construction
- Based in
- Pleasanton
- On San Francisco permits
- Sep 2011 to Nov 2017
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 27, 2017 | Completed final sign-off Jan 2018 | 116 Broad St | reroofing.Details
reroofing. | $9,646 |
| Sep 27, 2011 | Completed final sign-off Nov 2011 | 100 Bush St | suite 1625: add small sink to break room; remove partition, move door to new location (non-egress); pathch and repair ceiling after demo as needed; install carpet and paint.Details
suite 1625: add small sink to break room; remove partition, move door to new location (non-egress); pathch and repair ceiling after demo as needed; install carpet and paint. | $18,000 |