Red Hammer Construction
- Based in
- Martinez
- On San Francisco permits
- Jun 2020 to Nov 2020
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 24, 2020 | Completed final sign-off Sep 2021 | 2050 Divisadero St | #1 - remodel 2 full & 1/2 bathrooms which includes; replace shower valves in master's guest & shower pans in both. replace 3 toilets. electrical work is permitted. inspection & approved. no walls are being moved; installing new cabinets in kitchen - footprint remains the sameDetails
#1 - remodel 2 full & 1/2 bathrooms which includes; replace shower valves in master's guest & shower pans in both. replace 3 toilets. electrical work is permitted. inspection & approved. no walls are being moved; installing new cabinets in kitchen - footprint remains the same | $8,100 |
| Jun 10, 2020 | Completed final sign-off Sep 2021 | 2050 Divisadero St | drywall & rc channel installation & finish the whole ceiling to the unit. approx 2000 sq ft ( 2 bathroom, 1 half bathroom, kitchen, 3 bedrooms, living room, dining room, hallway). double sheet rock with rc channel. random patch work in kitchen and wall in half bath room about 250 sq ftDetails
drywall & rc channel installation & finish the whole ceiling to the unit. approx 2000 sq ft ( 2 bathroom, 1 half bathroom, kitchen, 3 bedrooms, living room, dining room, hallway). double sheet rock with rc channel. random patch work in kitchen and wall in half bath room about 250 sq ft | $45,000 |