Reab Construction
- Based in
- Forestville
- On San Francisco permits
- Jun 2011 to Jun 2025
- Last 24 months
- 1 permit filed
7 permits since 2000: 4 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 16, 2025 | In progress issued Jun 2025 | 1258 Francisco St | remove ceiling drywall replace with sound protection type and new drywall.Details
remove ceiling drywall replace with sound protection type and new drywall. | $125,000 |
| Sep 28, 2022 | Completed final sign-off Jul 2023 | 1950 Gough St | remove ceiling drywall, install new drywall under floor. install insulation, install two layer of 5/8 type x on ceiling for entire unit approximately 550 sq.ft. for soound proofing purposes.Details
remove ceiling drywall, install new drywall under floor. install insulation, install two layer of 5/8 type x on ceiling for entire unit approximately 550 sq.ft. for soound proofing purposes. | $100,000 |
| Mar 24, 2015 | Completed final sign-off Aug 2015 | 2259 15th St | remove and replace 12 windows total. remove and replace 6 windows in front to match wood double hung above.Details
remove and replace 12 windows total. remove and replace 6 windows in front to match wood double hung above. | $8,000 |
| Jan 7, 2015 | Never finaled issued Jan 2015, no final | 2259 15th St | remove and replace ceiling through out. replace with sound proofing and 2 layers 5/8" type x sheetrock, approx. 1,200 sq.ft. some lighting work.Details
remove and replace ceiling through out. replace with sound proofing and 2 layers 5/8" type x sheetrock, approx. 1,200 sq.ft. some lighting work. | $50,000 |
| Apr 3, 2014 | Never finaled issued Apr 2014, no final | 139 Carmel St | remove and replace drywall @ ceiling install a sound ceiling to reduce noise, insulate with mineral wool installation.Details
remove and replace drywall @ ceiling install a sound ceiling to reduce noise, insulate with mineral wool installation. | $50,000 |
| Mar 5, 2013 | Completed final sign-off Jun 2013 | 1111 Greenwich St | remove and replace drywall on ceilings master bedroom and bath, guest bedroom and bath and 5' of hallway add. installation and spring system type sound system. replace extg can lighting to ic can lighting. 2 layers of 5/8 inch gyp. boardDetails
remove and replace drywall on ceilings master bedroom and bath, guest bedroom and bath and 5' of hallway add. installation and spring system type sound system. replace extg can lighting to ic can lighting. 2 layers of 5/8 inch gyp. board | $50,000 |
| Jun 15, 2011 | Completed final sign-off Nov 2011 | 1020 Union St | unit #20: take out existing ceiling install r19 insulation and new ceiling drwall/repl 5/8 type x gyp bd for whole unit, no structural work (n) lighting comply with cec 150(k)Details
unit #20: take out existing ceiling install r19 insulation and new ceiling drwall/repl 5/8 type x gyp bd for whole unit, no structural work (n) lighting comply with cec 150(k) | $60,000 |