Re-Model Design & Build Co
- Based in
- San Jose
- On San Francisco permits
- Oct 2020 to Mar 2023
- Last 24 months
- 0 permits filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2023 | Completed final sign-off May 2023 | 73 Estero Av | (2) non structural bathroom remodel like for like: replace plumbing fixtures.Details
(2) non structural bathroom remodel like for like: replace plumbing fixtures. | $45,000 |
| Jan 19, 2023 | Completed final sign-off May 2023 | 73 Estero Av | kitchen remodel like for like, replace plumbing fixtures, update e/m/p up to code replace. all work in kitchen.Details
kitchen remodel like for like, replace plumbing fixtures, update e/m/p up to code replace. all work in kitchen. | $35,000 |
| Jul 29, 2022 | Completed final sign-off Oct 2022 | 2591 20th Av | kitchen like for like. replace plumbing fixtures copper line for fridge. like new.Details
kitchen like for like. replace plumbing fixtures copper line for fridge. like new. | $20,000 |
| Mar 17, 2022 | Completed final sign-off Dec 2022 | 1896 Green St | 1 complete bathroom remodel & sub panel upgrade. install shower stall, replace vertical pipes, install linear drain, electrical recessed light & fixtures. tile on floor.Details
1 complete bathroom remodel & sub panel upgrade. install shower stall, replace vertical pipes, install linear drain, electrical recessed light & fixtures. tile on floor. | $35,000 |
| Dec 20, 2021 | Completed final sign-off Oct 2024 | 1563 Innes Av | convert (e) storage room into gym with equipment room, powder room. relocate luandry. replace (e) w/h with tnakless w/y & relocate to garage. changes to rear doors and replace 2 windows, not visible from pow. close the door at the rear of (e) laundry room.Details
convert (e) storage room into gym with equipment room, powder room. relocate luandry. replace (e) w/h with tnakless w/y & relocate to garage. changes to rear doors and replace 2 windows, not visible from pow. close the door at the rear of (e) laundry room. | $10,000 |
| May 19, 2021 | Completed final sign-off Mar 2022 | 2075 Sutter St | unit 513: kitchen remodeling like for like, replace plumbing fixtures, appliances.Details
unit 513: kitchen remodeling like for like, replace plumbing fixtures, appliances. | $20,000 |
| Apr 12, 2021 | Completed final sign-off Nov 2021 | 1920 14th Av | kitchen remodelingDetails
kitchen remodeling | $25,000 |
| Oct 6, 2020 | Completed final sign-off Jan 2021 | 1647 Lombard St | complete kitchen remodel like for like. no layout or wall changes.Details
complete kitchen remodel like for like. no layout or wall changes. | $20,000 |