Re-Bath
- Based in
- San Leandro
- On San Francisco permits
- Jul 2015 to Oct 2015
- Last 24 months
- 0 permits filed
2 permits since 2000: 1 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 14, 2015 | Completed final sign-off Dec 2015 | 351 Buena Vista East Av | unit #702: replace bath tub with shower base. remove tile surround. replace plumbing valve, diverter, toilet and exhaust fan. install (3) recessed led lights.Details
unit #702: replace bath tub with shower base. remove tile surround. replace plumbing valve, diverter, toilet and exhaust fan. install (3) recessed led lights. | $30,000 |
| Jul 20, 2015 | Never finaled issued Jul 2015, no final | 177 Idora Av | bedroom remodel/ new shower wall tiles, new shower valve, entry level shower & tile floor. to comply with cec150.0(k)5Details
bedroom remodel/ new shower wall tiles, new shower valve, entry level shower & tile floor. to comply with cec150.0(k)5 | $12,000 |