Rcgc
- Based in
- Galt
- On San Francisco permits
- Oct 2012 to Jan 2024
- Last 24 months
- 0 permits filed
29 permits since 2000: 24 completed, 5 never finaled.
Of the 5 never-finaled permits, 4 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 29, 2024 | Completed final sign-off Nov 2024 | 32 Carson St | revision to pa# 202311060193, vault living room ceiling. install new taller front door, framing for taller doorDetails
revision to pa# 202311060193, vault living room ceiling. install new taller front door, framing for taller door | $6,000 |
| Nov 6, 2023 | Completed final sign-off Nov 2024 | 32 Carson St | kitchen and 2 bathroom remodel. new finishes. add laundry; replace double door with single & increase window size in rear; remove existing steel catwalk and bedroom loft to create attic space; drop down ladder access. new hardwood flooringDetails
kitchen and 2 bathroom remodel. new finishes. add laundry; replace double door with single & increase window size in rear; remove existing steel catwalk and bedroom loft to create attic space; drop down ladder access. new hardwood flooring | $105,678 |
| Dec 30, 2022 | Completed final sign-off May 2024 | 65 Dorantes Av | kitchen remodel: no strucural work, new appliances, cabinets, countertops, flooring. new sheetrock and paint. electrical: new outlet and switch locations, new lighting. plumbing: extend water for fridge. rework existing drain and water for new sink cabinets.Details
kitchen remodel: no strucural work, new appliances, cabinets, countertops, flooring. new sheetrock and paint. electrical: new outlet and switch locations, new lighting. plumbing: extend water for fridge. rework existing drain and water for new sink cabinets. | $24,500 |
| Dec 20, 2021 | Completed final sign-off Apr 2023 | 2510 Mcallister St | kitchen and bathroom remodel, addition of powder room. kitchen will have new finishes including appliances and lighting. bathroom will have new finishes and some plumbing will move. addition of powder room outside of kitchen space to include new toilet and sink.Details
kitchen and bathroom remodel, addition of powder room. kitchen will have new finishes including appliances and lighting. bathroom will have new finishes and some plumbing will move. addition of powder room outside of kitchen space to include new toilet and sink. | $240,000 |
| Mar 17, 2021 | Never finaled issued May 2021, no final | 2151 45th Av | 1st fl: partial new slab to create a minimum 8'0" ceiling space to include a new family room, bedroom, & walk-in closet. 2nd fl: renovate (e) kitchen, bathroom, & new stairs to connect to 1st floor.Details
1st fl: partial new slab to create a minimum 8'0" ceiling space to include a new family room, bedroom, & walk-in closet. 2nd fl: renovate (e) kitchen, bathroom, & new stairs to connect to 1st floor. | $85,000 |
| Feb 19, 2021 | Completed final sign-off May 2022 | 2907 Bush St | remove fireplace and chimney in the dining room and create an opening to add counter seating.decrease bathroom size and rallocate that space to the kitchen to relocate the fridge and pantry. relocate shower and toilet and wall-in wdw in bath.replace sink in closet with stacked laundry.Details
remove fireplace and chimney in the dining room and create an opening to add counter seating.decrease bathroom size and rallocate that space to the kitchen to relocate the fridge and pantry. relocate shower and toilet and wall-in wdw in bath.replace sink in closet with stacked laundry. | $125,000 |
| Jan 21, 2021 | Completed final sign-off Sep 2021 | 328 Jersey St | interior kitchen remodel. demo existing wall at kitchen & living room. expand wall opening at dining to hallway.Details
interior kitchen remodel. demo existing wall at kitchen & living room. expand wall opening at dining to hallway. | $15,000 |
| Jun 16, 2020 | Never finaled issued Jun 2020, no final | 918 Haight St | two bathroom and kitchen remodel in-kind. no structural work. cosmetic changes. new finishes including: cabinets, tile, lighting, plumbing fixturesDetails
two bathroom and kitchen remodel in-kind. no structural work. cosmetic changes. new finishes including: cabinets, tile, lighting, plumbing fixtures | $83,491 |
| Mar 4, 2020 | Completed final sign-off Sep 2021 | 4241 25th St | unit 1. bath remodel no structural work. new finishes. fixtures remain in same place. everything in same location.Details
unit 1. bath remodel no structural work. new finishes. fixtures remain in same place. everything in same location. | $35,463 |
| Jul 30, 2019 | Completed final sign-off Sep 2021 | 4241 25th St | masther bath remodel: no structural work. new shower enclosure, vanity, finishes.Details
masther bath remodel: no structural work. new shower enclosure, vanity, finishes. | $46,628 |
| Nov 8, 2018 | Completed final sign-off Oct 2019 | 26 Cameo Wy | remodel (e) kitchen and remove (e) load bearing 2nd non- load bearing walls, add posts and beamDetails
remodel (e) kitchen and remove (e) load bearing 2nd non- load bearing walls, add posts and beam | $25,000 |
| Oct 9, 2018 | Completed final sign-off Apr 2019 | 2900 Pacific Av | apt 202: master and guest bathroom remodel. fixtures in same location. new finishes.Details
apt 202: master and guest bathroom remodel. fixtures in same location. new finishes. | $87,400 |
| Jun 1, 2018 | Never finaled issued Jun 2018, no final | 1257 Union St | comply with nov 201720681. kitchen remodel new abinets, countertops lighting flooring, appliances, casework. work on 1257 union onlyDetails
comply with nov 201720681. kitchen remodel new abinets, countertops lighting flooring, appliances, casework. work on 1257 union only | $54,014 |
| Apr 4, 2018 | Completed final sign-off Sep 2018 | 32 Page St | remodel (e) 2nd floor break room kitchen with addition of electrical stove and mechanical exhaust to roofDetails
remodel (e) 2nd floor break room kitchen with addition of electrical stove and mechanical exhaust to roof | $31,000 |
| Mar 21, 2018 | Completed final sign-off Jun 2018 | 1802 Scott St | master bath remodel: new finishes. no structural work. approx 425f floor plan. everything stays in same location.Details
master bath remodel: new finishes. no structural work. approx 425f floor plan. everything stays in same location. | $28,500 |
| Jan 16, 2018 | Completed final sign-off May 2018 | 980 Clayton St | master bath remodel. convert tub to shower. new shower fixts. new lighting. new tile & finishes. no structural work.Details
master bath remodel. convert tub to shower. new shower fixts. new lighting. new tile & finishes. no structural work. | $45,000 |
| Dec 19, 2017 | Completed final sign-off Aug 2018 | 56 Everglade Dr | kitchen remodel: new cabinets, counters, appliances, outlet locations. bathroom remodel: new shower, flooring, fixtures, cabinets. no structural workDetails
kitchen remodel: new cabinets, counters, appliances, outlet locations. bathroom remodel: new shower, flooring, fixtures, cabinets. no structural work | $95,276 |
| Apr 12, 2017 | Never finaled issued Apr 2017, no final | 1425 Vallejo St | unit 106: kitchen and bath remodel. new cabinets and fixtures. new shower enclosure including tile.Details
unit 106: kitchen and bath remodel. new cabinets and fixtures. new shower enclosure including tile. | $54,267 |
| Dec 15, 2016 | Completed final sign-off Mar 2017 | 722 Hampshire St | guest bath remodel: new bath fixtures and drain line, new shower pan, new vanity sink, re-work lighting, new finishes.Details
guest bath remodel: new bath fixtures and drain line, new shower pan, new vanity sink, re-work lighting, new finishes. | $25,000 |
| Aug 5, 2015 | Completed final sign-off Dec 2015 | 1732 Fell St | unit 1732 kitchen remodel. new cabinets, new sink location, new appliances, new floor, drywall, trim, paint.Details
unit 1732 kitchen remodel. new cabinets, new sink location, new appliances, new floor, drywall, trim, paint. | $39,992 |
| Jun 22, 2015 | Completed final sign-off Sep 2015 | 970 Duncan St | bathroom remodel. master bath new shower enclosure including new shower pan. new tile, vanity, glass. guest bath, new bathtub tile, bath tub will remain. new vanity, new glass, no change on walls.Details
bathroom remodel. master bath new shower enclosure including new shower pan. new tile, vanity, glass. guest bath, new bathtub tile, bath tub will remain. new vanity, new glass, no change on walls. | $20,000 |
| Apr 6, 2015 | Completed final sign-off Oct 2015 | 1257 Dolores St | kitchen remodel, wall to be removed, load center to be relocated, lights, outlets, switches added/relocated. plumbing to be relocated moved. windows to b e replaced. exterior door to be replacedDetails
kitchen remodel, wall to be removed, load center to be relocated, lights, outlets, switches added/relocated. plumbing to be relocated moved. windows to b e replaced. exterior door to be replaced | $25,344 |
| Jun 20, 2013 | Completed final sign-off Apr 2014 | 616 Moraga St | unit #-kitchen & bathroom remodel-relocate eletrical load center from closet to hallway, add exhaust fan in bathroom,. add receptacles to comly with code. install new bathroom tub, shower fixtures, vanity, sink, kitchen vanity, sink & d/w. new tile floor & shower walls in bathroom. new cabinets inDetails
unit #-kitchen & bathroom remodel-relocate eletrical load center from closet to hallway, add exhaust fan in bathroom,. add receptacles to comly with code. install new bathroom tub, shower fixtures, vanity, sink, kitchen vanity, sink & d/w. new tile floor & shower walls in bathroom. new cabinets in | $25,000 |
| Jun 20, 2013 | Completed final sign-off May 2014 | 616 Moraga St | unit #2-kitchen & bathroom remodel-relocate eletrical load center from closet to hallway, add exhaust fan in bathroom,. add receptacles to comly with code. install new bathroom tub, shower fixtures, vanity, sink, kitchen vanity, sink & d/w. new tile floor & shower walls in bathroom. new cabinets inDetails
unit #2-kitchen & bathroom remodel-relocate eletrical load center from closet to hallway, add exhaust fan in bathroom,. add receptacles to comly with code. install new bathroom tub, shower fixtures, vanity, sink, kitchen vanity, sink & d/w. new tile floor & shower walls in bathroom. new cabinets in | $25,000 |
| Jun 12, 2013 | Completed final sign-off May 2014 | 616 Moraga St | unit #1: kitchen & bath remodel, new cabinets & appliances in kitchen, new tile, bathtub, sinks & fixtures in bath. plumbing, shower fixtures, vanity. electrical: relocate (e) panel location, use (e) panel in closet as junction box & move new panel to hallway. add necessary circuits to comply with.Details
unit #1: kitchen & bath remodel, new cabinets & appliances in kitchen, new tile, bathtub, sinks & fixtures in bath. plumbing, shower fixtures, vanity. electrical: relocate (e) panel location, use (e) panel in closet as junction box & move new panel to hallway. add necessary circuits to comply with. | $12,500 |
| Apr 16, 2013 | Completed final sign-off Dec 2013 | 616 Moraga St | unit #3 -kitchen & bathroom remodel:new cabinet & appliances in the kitchen. new tile, bathtub, fixtures and sink in bath. plumbing: install new bathtub, shower fixtures, sin & fixtures in bath. install new sink, fixture in kitchen. electrical: relocate panel,use (e) panel location in hall closet asDetails
unit #3 -kitchen & bathroom remodel:new cabinet & appliances in the kitchen. new tile, bathtub, fixtures and sink in bath. plumbing: install new bathtub, shower fixtures, sin & fixtures in bath. install new sink, fixture in kitchen. electrical: relocate panel,use (e) panel location in hall closet as | $12,500 |
| Nov 29, 2012 | Completed final sign-off Dec 2013 | 616 Moraga St | unit 6 - kitchen and 2 bathroom(s) remodel. new cabinets in kitchen, new shower float, tile, vanity in master bath. new tub, tile, vanityin guest bath. plumb in new shower fixtures in both bathrooms. add exhaust fan(s) in both bathrooms and energy saver light switches and gfi in both bathrooms andDetails
unit 6 - kitchen and 2 bathroom(s) remodel. new cabinets in kitchen, new shower float, tile, vanity in master bath. new tub, tile, vanityin guest bath. plumb in new shower fixtures in both bathrooms. add exhaust fan(s) in both bathrooms and energy saver light switches and gfi in both bathrooms and | $19,000 |
| Oct 31, 2012 | Completed final sign-off Dec 2013 | 616 Moraga St | unit #5: 2 bathrooms remodels: repl existing tub, fixture and new tile (guest) 48 sq.ft/each, repl existing floated shower pan, shower drain, fixture, tile. kitchen: new cabinets, counter top, 120 sq.ft.,lighting must comply with cec 150(k) cec 150(k) (bathrm) new exhaust fans at bathrms vent toDetails
unit #5: 2 bathrooms remodels: repl existing tub, fixture and new tile (guest) 48 sq.ft/each, repl existing floated shower pan, shower drain, fixture, tile. kitchen: new cabinets, counter top, 120 sq.ft.,lighting must comply with cec 150(k) cec 150(k) (bathrm) new exhaust fans at bathrms vent to | $19,700 |
| Oct 1, 2012 | Never finaled issued Oct 2012, no final | 616 Moraga St | remove exterior window trim, remove window and replaef with same size window, replace exterior trim, caulk and paintDetails
remove exterior window trim, remove window and replaef with same size window, replace exterior trim, caulk and paint | $2,000 |