Radenko Losic
- Based in
- Campbell
- On San Francisco permits
- Feb 2013 to Feb 2013
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2013 | Completed final sign-off Feb 2013 | 304 South Hill Bl | to comply with nov 201283435 - replacing the 9e) patio walkway. the new concrete walkway with wwm will include a 4" high concrete curb to capture and redirect the majority of the surface run off. replacing the existing retaining wall using pressure treated timber posts and timber lagging.Details
to comply with nov 201283435 - replacing the 9e) patio walkway. the new concrete walkway with wwm will include a 4" high concrete curb to capture and redirect the majority of the surface run off. replacing the existing retaining wall using pressure treated timber posts and timber lagging. | $2,000 |