R D Engineering &Construction
- Based in
- El Cajon
- On San Francisco permits
- Dec 2008 to Dec 2008
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 19, 2008 | Never finaled issued Jun 2009, no final | 101 California St | roof top antenna - (1) uhf antenna mounted to the rooftop penthouse. (2) ku satelite antennas. (2) gps antennas and related broadcast & equipment installed inside existing building.Details
roof top antenna - (1) uhf antenna mounted to the rooftop penthouse. (2) ku satelite antennas. (2) gps antennas and related broadcast & equipment installed inside existing building. | $90,000 |