Quest Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- May 2008 to Mar 2010
- Last 24 months
- 0 permits filed
3 permits since 2000: 3 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 15, 2010 | Completed final sign-off May 2010 | 23 Franklin St | replace (e) egress stairs in-kind from basement to roof at southside of property.Details
replace (e) egress stairs in-kind from basement to roof at southside of property. | $20,000 |
| Jun 26, 2009 | Completed final sign-off Sep 2009 | 147 Dellbrook Av | remodel kitchen-update elec wiring w/ new circuits, move gas stove 1 ft to the left w/ new gas shut-off in base cabinet. nor other structure or layout is to be altered.Details
remodel kitchen-update elec wiring w/ new circuits, move gas stove 1 ft to the left w/ new gas shut-off in base cabinet. nor other structure or layout is to be altered. | $8,500 |
| May 27, 2008 | Completed final sign-off Sep 2008 | 623 09th Av | bathroom alteration including new fixtures, toilet, and pocket door. update electrical wiring within the bathroom.Details
bathroom alteration including new fixtures, toilet, and pocket door. update electrical wiring within the bathroom. | $15,000 |