Quality Painting Services Inc
- Based in
- Martinez
- On San Francisco permits
- Jul 2021 to Sep 2024
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 12, 2024 | Completed final sign-off May 2025 | 1443 Church St | change two windows. like for like.Details
change two windows. like for like. | $10,000 |
| May 23, 2024 | Completed final sign-off Feb 2025 | 1628 Broderick St | one kitchen remodel, remodel laundry, and (2) hallway bathrooms. replace bathroom door to pocket door - no changes to opening size. in kind remodels. fixture replacement.Details
one kitchen remodel, remodel laundry, and (2) hallway bathrooms. replace bathroom door to pocket door - no changes to opening size. in kind remodels. fixture replacement. | $55,000 |
| Jul 27, 2023 | Completed final sign-off Aug 2025 | 25 Cameo Wy | repair and restoration of damaged structure of existing sfd due to fallen tree and subsequent storm damage, replace damaged elements like for like and update exsiting to code requirements.Details
repair and restoration of damaged structure of existing sfd due to fallen tree and subsequent storm damage, replace damaged elements like for like and update exsiting to code requirements. | $160,000 |
| Feb 15, 2022 | Completed final sign-off May 2022 | 720 York St | unit 102. bathroom remodel,everything is staying as is. non- strutural bathroom size 7x10Details
unit 102. bathroom remodel,everything is staying as is. non- strutural bathroom size 7x10 | $40,000 |
| Feb 14, 2022 | Expired or cancelled cancelled Feb 2022 | 235 Montecito Av | bathroom remodel. everything is staying as is. bathroom size 7x10. non structuralDetails
bathroom remodel. everything is staying as is. bathroom size 7x10. non structural | $58,000 |
| Jul 26, 2021 | Completed final sign-off Dec 2021 | 614 Banks St | bathroom remodel, 2/f, 60 sq. ft., (2) window replacements-kitchen & bathroom, (1) sliding door installation (8850.00), all not visible from streetDetails
bathroom remodel, 2/f, 60 sq. ft., (2) window replacements-kitchen & bathroom, (1) sliding door installation (8850.00), all not visible from street | $16,500 |