Proyecto
- Based in
- Oakland
- On San Francisco permits
- Jan 2019 to Sep 2021
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 17, 2021 | Completed final sign-off Mar 2024 | 815 Miramar Av | proposed 1215 sq ft adu in lower level of house. adu to include (n) bedroom, (n) bathroom, (n) kitchen, (n) dining room and (n) craft room.Details
proposed 1215 sq ft adu in lower level of house. adu to include (n) bedroom, (n) bathroom, (n) kitchen, (n) dining room and (n) craft room. | $200,000 |
| Jun 28, 2021 | Never finaled issued Jun 2021, no final | 442 Sanchez St | admin permit only for pa202009033350 to correct unit number from 101 to 201.Details
admin permit only for pa202009033350 to correct unit number from 101 to 201. | |
| Jan 26, 2021 | Completed final sign-off Aug 2023 | 191 Topaz Wy | revision to app#201906133320/r1. layout update, plumbing changes, window and door changes, reflected ceiling plan update, electrical changes.Details
revision to app#201906133320/r1. layout update, plumbing changes, window and door changes, reflected ceiling plan update, electrical changes. | $50,000 |
| Jan 14, 2021 | Completed final sign-off Sep 2021 | 33 Miraloma Dr | remodel e bath. no structural work. no new wall and no existing wall relocation. all new plumbing fixtures reamin at e locations. new lighting shall comply with cec 150.k5Details
remodel e bath. no structural work. no new wall and no existing wall relocation. all new plumbing fixtures reamin at e locations. new lighting shall comply with cec 150.k5 | $30,000 |
| Sep 3, 2020 | Completed final sign-off Jan 2021 | 812 Lyon St | unit b: remodel 2 existing bathrooms no structural. all work in kindDetails
unit b: remodel 2 existing bathrooms no structural. all work in kind | $60,000 |
| Sep 3, 2020 | Completed final sign-off Mar 2021 | 442 Sanchez St | unit #101: remodel (e) kitchen & bath , no structural, all work in kind. **maher n/a**Details
unit #101: remodel (e) kitchen & bath , no structural, all work in kind. **maher n/a** | $58,000 |
| Jan 9, 2020 | Completed final sign-off Sep 2021 | 825 Plymouth Av | remodel kitchen on 2/f: replacing caibnets, counters, appliances. all fixtures to remain in the same location.Details
remodel kitchen on 2/f: replacing caibnets, counters, appliances. all fixtures to remain in the same location. | $45,000 |
| Dec 16, 2019 | Completed final sign-off May 2023 | 481 Teresita Bl | flr 2 reconstruct interior stair to flr 1 & basement, create habitable area behind garage(master bedroom, bath & office) basement: create habitable rec room, replace front exterior steps in-kindDetails
flr 2 reconstruct interior stair to flr 1 & basement, create habitable area behind garage(master bedroom, bath & office) basement: create habitable rec room, replace front exterior steps in-kind | $150,000 |
| Jun 13, 2019 | Completed final sign-off Aug 2023 | 191 Topaz Wy | the work consists of an interior remodel and filling in a light well to create a 78.33 sq ft addition to an existing single family residenceDetails
the work consists of an interior remodel and filling in a light well to create a 78.33 sq ft addition to an existing single family residence | $250,000 |
| Jan 11, 2019 | Completed final sign-off Oct 2021 | 125 Pioche St | partial 2nd floor addition, rear yard addition, no modification to front elevation. 2 new bedrooms & 1 new bathroom. 3 bedrooms & 2 baths final count.Details
partial 2nd floor addition, rear yard addition, no modification to front elevation. 2 new bedrooms & 1 new bathroom. 3 bedrooms & 2 baths final count. | $150,000 |