Promax Builders Inc Dba Procraft Builder
- Based in
- Fremont
- On San Francisco permits
- Jan 2012 to Oct 2022
- Last 24 months
- 0 permits filed
22 permits since 2000: 16 completed, 5 never finaled, 1 expired or cancelled.
Of the 5 never-finaled permits, 4 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 11, 2022 | Completed final sign-off May 2024 | 83 Arbor St | convert (e) bedroom, study room into 1 bedroom, relocate (e) bathroom at g/f. remodel (e) kitchen, bathroom & replace (e) sheet rock with new at 2/f. construct 1 bedroom, family room with wet bar and 1 full bathroom at basement.Details
convert (e) bedroom, study room into 1 bedroom, relocate (e) bathroom at g/f. remodel (e) kitchen, bathroom & replace (e) sheet rock with new at 2/f. construct 1 bedroom, family room with wet bar and 1 full bathroom at basement. | $200,000 |
| Apr 12, 2022 | Completed final sign-off Aug 2023 | 570 Beale St | revision to pa 2019-1226-0698. shear wall relocation a 1 story existing shear wall (that was undercovered during demo) to allow for the approved layout of the amenity space. building # 4 - 570 beale st.Details
revision to pa 2019-1226-0698. shear wall relocation a 1 story existing shear wall (that was undercovered during demo) to allow for the approved layout of the amenity space. building # 4 - 570 beale st. | |
| Dec 26, 2019 | Completed final sign-off Dec 2023 | 570 Beale St | building #4: renovations of existing amernity spaces on level 1 in building #4.Details
building #4: renovations of existing amernity spaces on level 1 in building #4. | $198,500 |
| Dec 26, 2019 | Completed final sign-off Dec 2023 | 160 Brannan St | building #3: renovation of existing amenity space om level 1.Details
building #3: renovation of existing amenity space om level 1. | $198,500 |
| Aug 16, 2018 | Never finaled issued Aug 2018, no final | 41 Peralta Av | revision to pa 2015-0304-9963 (n) partitions to separate (e) bath & laundry/mech roomDetails
revision to pa 2015-0304-9963 (n) partitions to separate (e) bath & laundry/mech room | $2,000 |
| Jun 25, 2018 | Never finaled issued Jun 2018, no final | 333 03rd St | washer dryer locations in different location upgrade/relocate ele panel. ref 201701106809 15 different unit types, 215 locations. contractor has unit matrix for inspection.Details
washer dryer locations in different location upgrade/relocate ele panel. ref 201701106809 15 different unit types, 215 locations. contractor has unit matrix for inspection. | |
| Mar 19, 2018 | Completed final sign-off Sep 2020 | 41 Peralta Av | revision to 201503049963 add 41a foundation workDetails
revision to 201503049963 add 41a foundation work | |
| Mar 21, 2017 | Completed final sign-off Jan 2018 | 1715 Broadway | revision to pa #201512185471 - soft story seismic retrofit. revised drawings is for foundation repair to leave existing foundation in place & attach new footing next to it. soft story retrofit per sfbc chapter 34b fema p-807.Details
revision to pa #201512185471 - soft story seismic retrofit. revised drawings is for foundation repair to leave existing foundation in place & attach new footing next to it. soft story retrofit per sfbc chapter 34b fema p-807. | |
| Jan 10, 2017 | Never finaled issued Dec 2017, no final | 333 03rd St | for existing complex built in 1989 with 359 apartments privide (n) washer (ven hess) dryer in each apartment. provide (n) ada kitchen counters.Details
for existing complex built in 1989 with 359 apartments privide (n) washer (ven hess) dryer in each apartment. provide (n) ada kitchen counters. | $2,872,000 |
| Dec 29, 2015 | Expired or cancelled cancelled Jan 2026 | 125 28th Av | revision to app#201509177268 remove extg front deck. waterproof only. rewater proof per plan prepared by cjw architecture 7-9-15. put back deck like for like.Details
revision to app#201509177268 remove extg front deck. waterproof only. rewater proof per plan prepared by cjw architecture 7-9-15. put back deck like for like. | |
| Dec 18, 2015 | Completed final sign-off Jan 2018 | 1715 Broadway | soft story seismic retrofit per sf ordinance 66-13, sf bldg code chapter 34b & sf admin bulletins 106 & 107. structural analysis per fema p-807.Details
soft story seismic retrofit per sf ordinance 66-13, sf bldg code chapter 34b & sf admin bulletins 106 & 107. structural analysis per fema p-807. | $50,000 |
| Nov 6, 2015 | Completed final sign-off Apr 2017 | 579 Burnett Av | soft story seismic retrofit per sf ordinance 66-13. sf bldg code chapter 34b and sf administration. bulletins 106 & 107. analysis per 2012 iebc appendix a-4.Details
soft story seismic retrofit per sf ordinance 66-13. sf bldg code chapter 34b and sf administration. bulletins 106 & 107. analysis per 2012 iebc appendix a-4. | $80,000 |
| Nov 6, 2015 | Completed final sign-off Apr 2017 | 587 Burnett Av | soft story seismic retrofit per sf ordinance 66-13. sf bldg code chapter 34b and sf administration. bulletins 106 & 107. analysis per 2012 iebc appendix a-4.Details
soft story seismic retrofit per sf ordinance 66-13. sf bldg code chapter 34b and sf administration. bulletins 106 & 107. analysis per 2012 iebc appendix a-4. | $150,000 |
| Oct 13, 2015 | Completed final sign-off Feb 2017 | 230 12th Av | soft story retrofit - per sf ord no 66-13 bld code chapter 34b & admin bulletins 106 & 107. per iebc a4. maher n/aDetails
soft story retrofit - per sf ord no 66-13 bld code chapter 34b & admin bulletins 106 & 107. per iebc a4. maher n/a | $150,000 |
| Oct 2, 2015 | Completed final sign-off Jan 2017 | 1205 Oak St | voluntary strenghtening upgrade at ground floor. n/a ordinance #155-13Details
voluntary strenghtening upgrade at ground floor. n/a ordinance #155-13 | $40,000 |
| Sep 17, 2015 | Completed final sign-off Sep 2016 | 125 28th Av | remove extg rear deck. rewater proof per plans prepared by cjw architecture. put back deck like for like.Details
remove extg rear deck. rewater proof per plans prepared by cjw architecture. put back deck like for like. | $50,000 |
| Jun 4, 2015 | Completed final sign-off Aug 2016 | 291 Broderick St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. n/a maher ordinanceDetails
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4. n/a maher ordinance | $140,000 |
| Mar 4, 2015 | Never finaled issued Jan 2018, no final | 41 Peralta Av | renovation to 2nd story new deck on 2nd floor, add dormers to 3rd story.Details
renovation to 2nd story new deck on 2nd floor, add dormers to 3rd story. | $100,000 |
| Aug 22, 2014 | Completed final sign-off Nov 2014 | 867 Ashbury St | soft story seismic retrofit. to comply with engineering critera fema p-807.Details
soft story seismic retrofit. to comply with engineering critera fema p-807. | $20,000 |
| Jun 20, 2014 | Completed final sign-off Dec 2014 | 3251 16th St | soft story retrofit per sfbc chapter 34b engineering criteria: fema p-807. soft story seismic retrofit per san francisco ordinance no. 66-13, building code chapter 34-b & administrative bulletin 106Details
soft story retrofit per sfbc chapter 34b engineering criteria: fema p-807. soft story seismic retrofit per san francisco ordinance no. 66-13, building code chapter 34-b & administrative bulletin 106 | $60,000 |
| Apr 18, 2014 | Completed final sign-off May 2014 | 2200 Pacific Av | installing sheetrock at closet and partial hallway in unit along with baseboard (like for like) common area (floors #2-12)Details
installing sheetrock at closet and partial hallway in unit along with baseboard (like for like) common area (floors #2-12) | $13,000 |
| Jan 31, 2012 | Never finaled issued Feb 2012, no final | 77 Grand View Av | work for the whole bldg - replace entry walkway 3x6 wood planks, replace covered entry alcove cermic tile 80 sq. feet. install metal flashing - in kind. maintain all required exits during and after work hours.Details
work for the whole bldg - replace entry walkway 3x6 wood planks, replace covered entry alcove cermic tile 80 sq. feet. install metal flashing - in kind. maintain all required exits during and after work hours. | $3,600 |