Profound Systems Inc.
- Based in
- Brentwood
- On San Francisco permits
- Jan 2021 to Jan 2023
- Last 24 months
- 0 permits filed
7 permits since 2000: 6 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 5, 2023 | Completed final sign-off Sep 2023 | 3319 Geary Bl | to comply with the accessible business entrance program abe # 202306127543. exterior pkg lot work only.Details
to comply with the accessible business entrance program abe # 202306127543. exterior pkg lot work only. | $128,000 |
| Jan 5, 2023 | Completed final sign-off Jul 2024 | 926 Taraval St | abe#201812143000, upgrade portions of public sidewalk to provide compliant path of travel from the public row to the entrance, reconstructing landings at bottom of sloped walk and at entrance door including new threshold, automatic door openers & door hardware adjustments, remove barriersDetails
abe#201812143000, upgrade portions of public sidewalk to provide compliant path of travel from the public row to the entrance, reconstructing landings at bottom of sloped walk and at entrance door including new threshold, automatic door openers & door hardware adjustments, remove barriers | $134,000 |
| Dec 13, 2022 | Completed final sign-off Sep 2024 | 2112 15th St | removal and reconstruction of accessible ada parking and route to primary enntrance including door hardware to bring it into compliance ada standars. the entire scope of work is solely for the purpose of removing barriers. abe 201910237332Details
removal and reconstruction of accessible ada parking and route to primary enntrance including door hardware to bring it into compliance ada standars. the entire scope of work is solely for the purpose of removing barriers. abe 201910237332 | $225,000 |
| Nov 15, 2022 | Completed final sign-off Dec 2023 | 2900 Mission St | to comply with the accessible business entrance program, this is a reconfiguration of door entry landing and hardware abe 202201273051Details
to comply with the accessible business entrance program, this is a reconfiguration of door entry landing and hardware abe 202201273051 | $75,000 |
| Sep 10, 2021 | Completed final sign-off Dec 2025 | 1500 Polk St | scope of work is to bring the building entrance up to code with s.f.'s disabled building entrance(sf abe)program.this includes replacing existing sidewalk at primary building entrance.install high/low automatic door actuators at existing exterior doors.replace door hardware at exterior side door.Details
scope of work is to bring the building entrance up to code with s.f.'s disabled building entrance(sf abe)program.this includes replacing existing sidewalk at primary building entrance.install high/low automatic door actuators at existing exterior doors.replace door hardware at exterior side door. | $38,000 |
| Apr 30, 2021 | In progress issued May 2026 | 98 West Portal Av | bring bldg entrance up to code accordance to disabled bldg entrance (sf abe) program. replace (e) sidewalk, steps, ramp & handrail. install high/low automatic door actuators @ (e) exterior doors. replace door hardware @ exterior main entry/exit door. relocate (e) walk-up atm & after-hour depositoryDetails
bring bldg entrance up to code accordance to disabled bldg entrance (sf abe) program. replace (e) sidewalk, steps, ramp & handrail. install high/low automatic door actuators @ (e) exterior doors. replace door hardware @ exterior main entry/exit door. relocate (e) walk-up atm & after-hour depository | $262,441 |
| Jan 27, 2021 | Completed final sign-off Oct 2021 | 1040 Grant Av | modification to storefront & vestibule to remove barrier.Details
modification to storefront & vestibule to remove barrier. | $15,000 |