Proficient Termite And Construction Co
- Based in
- Pinole
- On San Francisco permits
- Jun 2022 to Jan 2025
- Last 24 months
- 3 permits filed
5 permits since 2000: 4 completed, 1 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 21, 2025 | Completed final sign-off Jan 2025 | 85 Woodward St | comply w/ nov 20249922 #4: repair and railing repair house step near top of stairs and repair loose railing near bottom of stair. all work is in the rear. note this work not related to pa# 2024-1211-6601 and that property manager will perform complaint nos. 1-3 and 5-7 which do not require a p/a.Details
comply w/ nov 20249922 #4: repair and railing repair house step near top of stairs and repair loose railing near bottom of stair. all work is in the rear. note this work not related to pa# 2024-1211-6601 and that property manager will perform complaint nos. 1-3 and 5-7 which do not require a p/a. | $500 |
| Dec 11, 2024 | In progress filed Dec 2024, not yet issued | 85 Woodward St | repair 4 pieces of trim and repair 3 steps per termite report #120624-1Details
repair 4 pieces of trim and repair 3 steps per termite report #120624-1 | $1,120 |
| Nov 19, 2024 | Completed final sign-off Dec 2024 | 425 Steiner St | deck repair only. side deck only plus stairs. less 50% of deck and stairs.Details
deck repair only. side deck only plus stairs. less 50% of deck and stairs. | $4,500 |
| Oct 26, 2022 | Completed final sign-off May 2023 | 226 Monterey Bl | voluntary foundation strengthening to perimeter footing at rear portion of structure. underpining approx 18 foot of footing (not on property line)Details
voluntary foundation strengthening to perimeter footing at rear portion of structure. underpining approx 18 foot of footing (not on property line) | |
| Jun 7, 2022 | Completed final sign-off Jan 2023 | 226 Monterey Bl | 1. update electrical in area we work both bath and kitchen. install hvac. 2. remodel baths in like with low flow plumbing and update electric. 3. remove existing wood panelling and install insulation and sheetrock in 1st floor. 4. remodeling kitchen in kindDetails
1. update electrical in area we work both bath and kitchen. install hvac. 2. remodel baths in like with low flow plumbing and update electric. 3. remove existing wood panelling and install insulation and sheetrock in 1st floor. 4. remodeling kitchen in kind | $82,000 |