177 permits since 2000: 122 completed, 16 in progress, 34 never finaled, 5 expired or cancelled.
Of the 34 never-finaled permits, 6 are 3 to 5 years old, 14 are 5 to 10 years old, 14 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 177.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2026 | In progress issued Aug 2026 | 525 05th St | installation of 4 evacuation maps for floor 2 (for fire review only)Details
installation of 4 evacuation maps for floor 2 (for fire review only) | $1,800 |
| Apr 2, 2026 | Completed final sign-off Jul 2026 | 750 Phelps St | install evacuation maps on floors1-3Details
install evacuation maps on floors1-3 | $3,000 |
| Oct 30, 2025 | In progress issued Oct 2025 | 150 09th St | 12 evacuation paln maps -basment, 1/f, 2/f, 3/f & 4/f for fire review only. ref #202305026865Details
12 evacuation paln maps -basment, 1/f, 2/f, 3/f & 4/f for fire review only. ref #202305026865 | $5,400 |
| Oct 9, 2025 | Completed final sign-off Jul 2026 | 200 Folsom St | erect non electric sign: "272 folsom" facing street and not in public right of way.Details
erect non electric sign: "272 folsom" facing street and not in public right of way. | $3,000 |
| Oct 9, 2025 | In progress issued Oct 2025 | 3359 24th St | 7 evacuation maps in the basement 1,2, and roof reference bap#2021-0419-8808.Details
7 evacuation maps in the basement 1,2, and roof reference bap#2021-0419-8808. | $3,150 |
| Sep 18, 2025 | Completed final sign-off Dec 2025 | 272 Folsom St | levels 1-9 plus roof: 29 evacuation maps totalDetails
levels 1-9 plus roof: 29 evacuation maps total | $2,500 |
| Apr 21, 2025 | Completed final sign-off Jul 2025 | 915 North Point St | 15 evacuation plan maps floors 1,2,3,4,5 for review by fire only ref 201912200210Details
15 evacuation plan maps floors 1,2,3,4,5 for review by fire only ref 201912200210 | $6,750 |
| Feb 27, 2025 | Completed final sign-off Jun 2025 | 4220 Geary Bl | aka 4200 geary bl. install evacuation maps on floor 1- 7. ref to n/c pa# 202009305561Details
aka 4200 geary bl. install evacuation maps on floor 1- 7. ref to n/c pa# 202009305561 | $11,000 |
| Feb 21, 2025 | In progress issued Feb 2025 | 1440 Harrison St | 1-new freestanding, non-illuminated, single-faced signDetails
1-new freestanding, non-illuminated, single-faced sign | $26,321 |
| Jan 30, 2025 | In progress issued Jan 2025 | 1501 Sunnydale Av | evacuation plan maps, basement g1 & lobby floors 2,3,4,5. total 26 maps for fire review only. ref to n/c pa# 202106031549Details
evacuation plan maps, basement g1 & lobby floors 2,3,4,5. total 26 maps for fire review only. ref to n/c pa# 202106031549 | $11,700 |
| Jan 9, 2025 | In progress issued Jan 2025 | 1530 Sunnydale Av | install 2 non-illuminated single faced projecting sign "the hub"Details
install 2 non-illuminated single faced projecting sign "the hub" | $11,000 |
| Jan 9, 2025 | In progress issued Jan 2025 | 1530 Sunnydale Av | install 1 non-illuminated sign cabinet into existing sign base single faced sign "mercy housing, boys & girls clubs of san francisco, wuyee"Details
install 1 non-illuminated sign cabinet into existing sign base single faced sign "mercy housing, boys & girls clubs of san francisco, wuyee" | $8,000 |
| Dec 13, 2024 | In progress issued Oct 2025 | 500 Terry A Francois Bl | install (1) freestanding externally illuminated monument sign. "cisco"Details
install (1) freestanding externally illuminated monument sign. "cisco" | $28,000 |
| Nov 12, 2024 | In progress issued Nov 2024 | 151 Friedell St | evacuationplan maps froos 1,2,3,4,5 total 18 maps for fire review onlyDetails
evacuationplan maps froos 1,2,3,4,5 total 18 maps for fire review only | $8,100 |
| Nov 12, 2024 | In progress issued Nov 2024 | 351 Friedell St | 1-5/fl-evacuatin plan maps for fire reviewDetails
1-5/fl-evacuatin plan maps for fire review | $9,450 |
| Nov 8, 2024 | Completed final sign-off Apr 2025 | 240 Van Ness Av | 24 evacuation plan maps for floors 1,2,3,4,5,6,7,8 for fire review only. ref 202101042034Details
24 evacuation plan maps for floors 1,2,3,4,5,6,7,8 for fire review only. ref 202101042034 | $10,800 |
| Sep 3, 2024 | In progress issued Nov 2024 | 1500 Sunnydale Av | ref pa 2021-0712-4132 install illuminated "sunnydale" sign. sign a.1Details
ref pa 2021-0712-4132 install illuminated "sunnydale" sign. sign a.1 | $10,000 |
| Sep 3, 2024 | In progress issued Nov 2024 | 1500 Sunnydale Av | 1ref pa # 2021-0712-4132 install non illuminated "community center" sign. sign c & eDetails
1ref pa # 2021-0712-4132 install non illuminated "community center" sign. sign c & e | $10,000 |
| Aug 1, 2024 | In progress issued Aug 2024 | 2350 San Jose Av | non elec sign on property: villa de kapusoDetails
non elec sign on property: villa de kapuso | $5,000 |
| Aug 1, 2024 | In progress issued Aug 2024 | 2350 San Jose Av | non elec sign on property: the yDetails
non elec sign on property: the y | $10,000 |
| Jun 10, 2024 | Completed final sign-off Dec 2024 | 1450 Owens St | sign m.01 92" x 62"Details
sign m.01 92" x 62" | $10,000 |
| Jun 5, 2024 | Completed final sign-off May 2025 | 331 Powell St | erect a "nintendo san francisco" sign - 42" x 42"Details
erect a "nintendo san francisco" sign - 42" x 42" | $4,000 |
| Jun 4, 2024 | Completed final sign-off Apr 2025 | 331 Powell St | to erect non electric and non-structural sign.Details
to erect non electric and non-structural sign. | $10,000 |
| Jun 4, 2024 | Completed final sign-off May 2025 | 331 Powell St | to erect electrical wall sign. (nintendo)Details
to erect electrical wall sign. (nintendo) | $5,000 |
| Jun 4, 2024 | Completed final sign-off May 2025 | 331 Powell St | to erect electrical wall sign. (nintendo)Details
to erect electrical wall sign. (nintendo) | $5,000 |
| May 23, 2024 | In progress issued May 2024 | 100 Stockton St | 4 evacuation plan maps floor 1, 6, 8, 7Details
4 evacuation plan maps floor 1, 6, 8, 7 | $1,800 |
| Mar 7, 2024 | Completed final sign-off Apr 2024 | 3133 Taraval St | ref pa# 201905231498 three evacuation plan maps at the 1st, 2nd & 3rd floorDetails
ref pa# 201905231498 three evacuation plan maps at the 1st, 2nd & 3rd floor | $1,350 |
| Jan 16, 2024 | In progress issued Jan 2024 | 78 Johnson St | 16 evacuation plan mapDetails
16 evacuation plan map | $7,200 |
| Jan 11, 2024 | Completed final sign-off May 2024 | 1450 Owens St | 31 evacuation plan maps floors 1 thru 7 for fire review onlyDetails
31 evacuation plan maps floors 1 thru 7 for fire review only | $13,950 |
| Oct 17, 2023 | Completed final sign-off Aug 2024 | 52 Kirkwood Av | 10 evacuation plan maps floors 1, 2, 3, 4 for fire review only.Details
10 evacuation plan maps floors 1, 2, 3, 4 for fire review only. | $4,500 |
| Sep 11, 2023 | Completed final sign-off Oct 2023 | 101 California St | 1st & 2nd fl - 10 evacuation plan maps for fire review onlyDetails
1st & 2nd fl - 10 evacuation plan maps for fire review only | $4,250 |
| Jun 9, 2023 | Never finaled issued Aug 2023, no final | 101 California St | placing excuavation route signage in buildingDetails
placing excuavation route signage in building | $1,700 |
| Jun 1, 2023 | Completed final sign-off Jun 2024 | 1450 Owens St | 31 evacuation plan maps floors 1-7 & penthouse for fire review only.Details
31 evacuation plan maps floors 1-7 & penthouse for fire review only. | $13,950 |
| May 23, 2023 | Completed final sign-off Aug 2023 | 363 Noe St | 8 evacuation plan maps floors 1,2,3 for fire review onlyDetails
8 evacuation plan maps floors 1,2,3 for fire review only | $3,600 |
| Apr 25, 2023 | Completed final sign-off Sep 2023 | 2340 San Jose Av | 28 evacuation plan maps floor 1,2,3,4,5,6,7,8,9. roof for fire review onlyDetails
28 evacuation plan maps floor 1,2,3,4,5,6,7,8,9. roof for fire review only | $11,900 |
| Apr 17, 2023 | Expired or cancelled cancelled Jan 2026 | 1275 Folsom St | non electric wall signDetails
non electric wall sign | $5,680 |
| Mar 30, 2023 | Never finaled issued Mar 2023, no final | 1000 Market St | 28 evacuation plan maps, floors, basement, 1,2,3,4 for fire review only.Details
28 evacuation plan maps, floors, basement, 1,2,3,4 for fire review only. | $11,900 |
| Mar 28, 2023 | Completed final sign-off Apr 2023 | 838 Kearny St | 1 evacuation plan map level b1 for fire review onlyDetails
1 evacuation plan map level b1 for fire review only | $425 |
| Jan 23, 2023 | Completed final sign-off May 2023 | 1005 Powell St | 9 evacuation maps levels ground, 1,2,3,4 for fire review onlyDetails
9 evacuation maps levels ground, 1,2,3,4 for fire review only | $3,825 |
| Dec 5, 2022 | Completed final sign-off Feb 2023 | 101 California St | (6) evacuation plan maps floors 7 & 8 for fire review only. ref 202106283370.Details
(6) evacuation plan maps floors 7 & 8 for fire review only. ref 202106283370. | $2,550 |
| Nov 15, 2022 | Never finaled issued Nov 2022, no final | 1033 Clement St | 9 evacuation maps floors 1, 2, 3, for fire review onlyDetails
9 evacuation maps floors 1, 2, 3, for fire review only | $3,825 |
| Nov 1, 2022 | Completed final sign-off May 2023 | 921 Howard St | (54) evacuation plan maps, floors 1 through roof.Details
(54) evacuation plan maps, floors 1 through roof. | $22,950 |
| Oct 25, 2022 | Completed final sign-off Jun 2023 | 55 Cravath St | 27 evacuation maps, floors: 1, 2, 3, 4, 5, 6 & roof. for fire review only.Details
27 evacuation maps, floors: 1, 2, 3, 4, 5, 6 & roof. for fire review only. | $11,050 |
| Sep 1, 2022 | Never finaled issued Sep 2022, no final | 120 Stockton St | all floores: 57 evacuation plan maps.Details
all floores: 57 evacuation plan maps. | $24,225 |
| Mar 7, 2022 | Completed final sign-off Mar 2023 | 681 Florida St | fl 1-9: intsall total of 32 evacuation maps.Details
fl 1-9: intsall total of 32 evacuation maps. | $13,000 |
| Mar 3, 2022 | Completed final sign-off Mar 2026 | 2403 Keith St | 6 evacuation plan maps. floor 1,2. for fire review only.Details
6 evacuation plan maps. floor 1,2. for fire review only. | $2,544 |
| Jan 11, 2022 | Completed final sign-off Mar 2022 | 671 China Basin St | 1/f: 1 evavacuation map for fire review only.Details
1/f: 1 evavacuation map for fire review only. | $424 |
| Nov 16, 2021 | Never finaled issued Nov 2021, no final | 300 Clay St | 16 evacuation plan maps floors 10, 11, 12, 13 for fire review onlyDetails
16 evacuation plan maps floors 10, 11, 12, 13 for fire review only | $6,800 |
| Nov 16, 2021 | Never finaled issued Nov 2021, no final | 444 Battery St | floor 1: 1 evacuation plan map for fire review only.Details
floor 1: 1 evacuation plan map for fire review only. | $424 |
| Sep 7, 2021 | Completed final sign-off Oct 2021 | 2633 San Bruno Av | 3 evacuation plan maps, floor 1, 2 for fire review only.Details
3 evacuation plan maps, floor 1, 2 for fire review only. | $1,272 |
| Sep 2, 2021 | Never finaled issued Sep 2021, no final | 1064 Mission St | levels 1,2,3,4,5,6: 34 evacuation plan maps (north and south)Details
levels 1,2,3,4,5,6: 34 evacuation plan maps (north and south) | $14,416 |
| May 20, 2021 | Never finaled issued Jun 2021, no final | 290 Malosi St | 49 evacuation maps on floors 0-1-2-3-4-5 for review by fire only.Details
49 evacuation maps on floors 0-1-2-3-4-5 for review by fire only. | $19,200 |
| Mar 11, 2021 | Completed final sign-off Sep 2021 | 1995 Evans Av | 7 evacuation plan maps floors 1, 2, 3, roof to be reviewed by fire onlyDetails
7 evacuation plan maps floors 1, 2, 3, roof to be reviewed by fire only | $2,100 |
| Feb 4, 2021 | Completed final sign-off Aug 2021 | 1178 Folsom St | 23 evacuation plan maps - basement, 1, 2, 3, 4, 5, 6, roof to be reviewed by fire onlyDetails
23 evacuation plan maps - basement, 1, 2, 3, 4, 5, 6, roof to be reviewed by fire only | $9,200 |
| Dec 30, 2020 | Never finaled issued Feb 2021, no final | 1990 Folsom St | 25 evacuation plan maps floors 1-8 & roof for review by fire onlyDetails
25 evacuation plan maps floors 1-8 & roof for review by fire only | $9,600 |
| Nov 19, 2020 | Completed final sign-off Jun 2022 | 385 Eddy St | 17 evacuation maps for basement, floors 1, 2, 3, 4, 5, 6 for fire reviewDetails
17 evacuation maps for basement, floors 1, 2, 3, 4, 5, 6 for fire review | $6,800 |
| Sep 12, 2020 | Completed final sign-off Sep 2021 | 49 South Van Ness Av | emergency evacuation maps to be reviewed by sffd only. floors b2, b1, 1, 2, 3, 4, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, roof (96 maps)Details
emergency evacuation maps to be reviewed by sffd only. floors b2, b1, 1, 2, 3, 4, 6, 7, 8, 9, 10, 11, 12, 13, 14, 15, 16, 17, roof (96 maps) | $12,000 |
| Sep 11, 2020 | Never finaled issued Oct 2020, no final | 827 Kearny St | 8 evacuation maps for basement 1,2,3,4 for fire review only.Details
8 evacuation maps for basement 1,2,3,4 for fire review only. | $3,200 |
| Sep 9, 2020 | Completed final sign-off Jun 2021 | 633 Folsom St | 56 evacuation plan maps for floors basement - roof. for fire review onlyDetails
56 evacuation plan maps for floors basement - roof. for fire review only | $22,400 |
| Sep 9, 2020 | Never finaled issued Nov 2020, no final | 270 Turk St | 10/f: 37 evacuation plan maps, floors basement through - floor 10. for fire review onlyDetails
10/f: 37 evacuation plan maps, floors basement through - floor 10. for fire review only | $14,800 |
| Aug 14, 2020 | Never finaled issued Aug 2020, no final | 188 Octavia St | evacuation maps - fabrication and installation. for sffd review only.Details
evacuation maps - fabrication and installation. for sffd review only. | $4,500 |
| Jun 12, 2020 | Never finaled issued Aug 2020, no final | 1419 Bryant St | evacuation maps fabrication and installation. fl 1,2,3Details
evacuation maps fabrication and installation. fl 1,2,3 | $3,600 |
| Jun 12, 2020 | Completed final sign-off Aug 2021 | 1045 Capp St | evacuation maps fabrication and installationDetails
evacuation maps fabrication and installation | $2,000 |
| Jan 7, 2020 | Completed final sign-off Jul 2020 | 2465 Van Ness Av | 27 evacuation maps for sffd review only. floors. b1,1,2,3,4,5,6,7 and roof.Details
27 evacuation maps for sffd review only. floors. b1,1,2,3,4,5,6,7 and roof. | $10,800 |
| Nov 7, 2019 | Completed final sign-off Jan 2021 | 490 South Van Ness Av | 1st - 7th fl & roof 27 evacuation maps for sffd review only.Details
1st - 7th fl & roof 27 evacuation maps for sffd review only. | $10,800 |
| Aug 30, 2019 | Completed final sign-off Jul 2020 | 175 Bluxome St | evac maps for floors g, 1, 2, 3. maher n/a.Details
evac maps for floors g, 1, 2, 3. maher n/a. | $5,200 |
| Apr 1, 2019 | Completed final sign-off Aug 2019 | 1441 Ocean Av | 9 evacuation maps for sffd review only floors 1,2,3Details
9 evacuation maps for sffd review only floors 1,2,3 | $3,600 |
| Mar 11, 2019 | Never finaled issued Mar 2019, no final | 455 Fell St | evac mapsDetails
evac maps | $5,000 |
| Feb 25, 2019 | Never finaled issued Feb 2019, no final | 440 Turk St | 8 evacuation maps for sffd review only, floors b,1,2Details
8 evacuation maps for sffd review only, floors b,1,2 | $3,200 |
| Jan 4, 2019 | Completed final sign-off Feb 2020 | 1296 Shotwell St | 26 evacuation maps for sffd review only. floors 1, 2, 3, 4, 5, 6, 7, 8, 9.Details
26 evacuation maps for sffd review only. floors 1, 2, 3, 4, 5, 6, 7, 8, 9. | $10,400 |
| Dec 13, 2018 | Completed final sign-off Apr 2021 | 911 Bryant St | 6 evacuation maps for sffd review only floors: ground, 2,3,4,5 & roof per sffd ab-2.11. district inspector to review maps before printing. n/a for maherDetails
6 evacuation maps for sffd review only floors: ground, 2,3,4,5 & roof per sffd ab-2.11. district inspector to review maps before printing. n/a for maher | $2,400 |
| Dec 10, 2018 | Completed final sign-off Mar 2019 | 973 Mission St | 5 evacuation maps for sffd only. floors b, 1, mezzanine.Details
5 evacuation maps for sffd only. floors b, 1, mezzanine. | $2,000 |
| Nov 16, 2018 | Never finaled issued Nov 2018, no final | 601 Montgomery St | 82 evacuation for sffd review only floors b, 1, garage, 3,4,5,6, 7, 8,9,10,11,12,14,16,17, 18,19,20,roofDetails
82 evacuation for sffd review only floors b, 1, garage, 3,4,5,6, 7, 8,9,10,11,12,14,16,17, 18,19,20,roof | $32,800 |
| Oct 22, 2018 | Completed final sign-off Jun 2019 | 350 Ellis St | 13 evac maps for sffd review only. fls: g/f, 1/f thru 12/fDetails
13 evac maps for sffd review only. fls: g/f, 1/f thru 12/f | $5,200 |
| Oct 12, 2018 | Completed final sign-off Jan 2019 | 333 Dolores St | floor 1,2,3 10 evac map.Details
floor 1,2,3 10 evac map. | $4,000 |
| Aug 22, 2018 | Completed final sign-off Jun 2020 | 555 Fulton St | 38 evacuation maps for sffd rebiew only. floors b2, b1, 1, 2, 3, 4, 5, & roof.Details
38 evacuation maps for sffd rebiew only. floors b2, b1, 1, 2, 3, 4, 5, & roof. | $15,600 |
| Aug 6, 2018 | Completed final sign-off Jan 2020 | 1555 Mariposa St | 2 evacuation maps for sffd review only floor 2Details
2 evacuation maps for sffd review only floor 2 | $800 |
| Aug 6, 2018 | Completed final sign-off Nov 2018 | 2800 Arelious Walker Dr | 9 evac maps for sffd review only floor 1,2,3. maher n/a.Details
9 evac maps for sffd review only floor 1,2,3. maher n/a. | $3,600 |
| Jun 18, 2018 | Completed final sign-off Oct 2018 | 1235 Mission St | floors: b,1,2,3,4, - evac maps maher naDetails
floors: b,1,2,3,4, - evac maps maher na | $8,000 |
| Apr 27, 2018 | Completed final sign-off Jul 2018 | 447 Minna St | 4 evac maps to be reviewed by sffd only floor 1,2,3,4Details
4 evac maps to be reviewed by sffd only floor 1,2,3,4 | $1,600 |
| Mar 5, 2018 | Completed final sign-off Jun 2018 | 450 Toland St | 11 evacuation plan maps floor 1Details
11 evacuation plan maps floor 1 | $4,400 |
| Mar 5, 2018 | Completed final sign-off Jun 2018 | 555 Selby St | 12 evacuation plan maps floors 1, 2. maher naDetails
12 evacuation plan maps floors 1, 2. maher na | $4,800 |
| Feb 15, 2018 | Completed final sign-off Mar 2018 | 2095 Jerrold Av | painted wall sign. "the sf market" maher naDetails
painted wall sign. "the sf market" maher na | $5,000 |
| Jan 23, 2018 | Completed final sign-off Mar 2018 | 10 Innes Ct | (x11) evacuation maps for sffd review only floor b,1,2,3 and 4Details
(x11) evacuation maps for sffd review only floor b,1,2,3 and 4 | $4,400 |
| Jan 23, 2018 | Completed final sign-off Mar 2018 | 10 Kennedy Pl | (x9) evacuation maps for sffd review only floor b,1,2,3. maher naDetails
(x9) evacuation maps for sffd review only floor b,1,2,3. maher na | $3,600 |
| Dec 21, 2017 | Never finaled issued Jan 2018, no final | 288 Pacific Av | (31) evacuation maps to be reviewed by sffd. floors 1, 2 , 3, 4, 5, 6, 7. maher na. ref pa 201508134190. n/a for maher.Details
(31) evacuation maps to be reviewed by sffd. floors 1, 2 , 3, 4, 5, 6, 7. maher na. ref pa 201508134190. n/a for maher. | $5,000 |
| Nov 27, 2017 | Never finaled issued Nov 2017, no final | 1555 Turk St | floors:1,2,3 - evac mapsDetails
floors:1,2,3 - evac maps | $4,800 |
| Nov 13, 2017 | Completed final sign-off Nov 2018 | 1251 Turk St | 57 evacuation maps for floors 1-12Details
57 evacuation maps for floors 1-12 | $22,800 |
| Nov 13, 2017 | Completed final sign-off Jun 2018 | 3850 18th St | floors 1 through 5: 5 evacuation maps for bldg aDetails
floors 1 through 5: 5 evacuation maps for bldg a | $2,000 |
| Nov 13, 2017 | Completed final sign-off Jun 2018 | 255 Dorland St | 6 evacuation maps floors b-5, bldg b `````5 evacuation maps for bldg aDetails
6 evacuation maps floors b-5, bldg b `````5 evacuation maps for bldg a | $2,400 |
| Nov 13, 2017 | Completed final sign-off Jun 2018 | 1855 15th St | evacuation maps (10) floors 1-10Details
evacuation maps (10) floors 1-10 | $4,000 |
| Sep 18, 2017 | Completed final sign-off Sep 2018 | 461 Valencia St | install one illuminated single-faced wall sign. "everlane" maher naDetails
install one illuminated single-faced wall sign. "everlane" maher na | $5,000 |
| Sep 15, 2017 | Completed final sign-off Aug 2018 | 705 Natoma St | 20 evac maps for sffd review only floors b, 1, 2, 3,4, 5. maher naDetails
20 evac maps for sffd review only floors b, 1, 2, 3,4, 5. maher na | $8,000 |
| Sep 11, 2017 | Completed final sign-off Jun 2018 | 1171 Mission St | evacuation maps to be reviewed by sffd only floor 1 only maher not reqDetails
evacuation maps to be reviewed by sffd only floor 1 only maher not req | $2,800 |
| Aug 15, 2017 | Completed final sign-off Oct 2017 | 146 West Point Rd | install 30 evacuation maps for all the floors to be reviewed by sffd onlyDetails
install 30 evacuation maps for all the floors to be reviewed by sffd only | $6,000 |
| Jul 24, 2017 | Completed final sign-off Sep 2017 | 462 Duboce Av | sffd review only: evacuation maps (13 total) floors: 1,2,3,4,5,6,r.Details
sffd review only: evacuation maps (13 total) floors: 1,2,3,4,5,6,r. | $5,200 |
| Jun 13, 2017 | Completed final sign-off Mar 2019 | 1750 Mcallister St | floor 1-12 - (x12) evacuation maps to be reviewed by sffdDetails
floor 1-12 - (x12) evacuation maps to be reviewed by sffd | $4,800 |
| Jun 7, 2017 | Completed final sign-off Aug 2018 | 1760 Bush St | (x20) evacuation maps to be reviewed by sffd. foors 1,2,3,4,5,6,7 and rDetails
(x20) evacuation maps to be reviewed by sffd. foors 1,2,3,4,5,6,7 and r | $8,000 |
| Jun 7, 2017 | Expired or cancelled cancelled Aug 2018 | 705 Natoma St | (x19) evacuation maps to be reviewed by sffd. foors b,1,s,3,4 and 5Details
(x19) evacuation maps to be reviewed by sffd. foors b,1,s,3,4 and 5 | $7,600 |
| Jun 5, 2017 | Completed final sign-off Sep 2017 | 25 Sanchez St | 1,2,3,4/f- 11 evacuation mapsDetails
1,2,3,4/f- 11 evacuation maps | $4,400 |