Prior Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2018 to Jan 2024
- Last 24 months
- 0 permits filed
4 permits since 2000: 1 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 3, 2024 | Completed final sign-off Sep 2024 | 1132 Noe St | replace partial foundation(brick to reinf. concrete) upgrade wood girder to steel girder at garage. reduce quantty of posts. partial slab replacement.Details
replace partial foundation(brick to reinf. concrete) upgrade wood girder to steel girder at garage. reduce quantty of posts. partial slab replacement. | $55,000 |
| Feb 15, 2023 | In progress issued Dec 2023 | 1658 48th Av | legalizing existing gate, driveway, parking pad. new curbcut, pour/finish concrete as necessary.Details
legalizing existing gate, driveway, parking pad. new curbcut, pour/finish concrete as necessary. | $10,000 |
| Jul 24, 2019 | Never finaled issued Jul 2019, no final | 481 29th St | street spaceDetails
street space | |
| Apr 10, 2018 | Never finaled issued Apr 2018, no final | 2473 20th Av | excavate 12" +/-(e) ground floor to attain 8'-0" finish ceiling height. (e) storage at the ground floor to be remain.Details
excavate 12" +/-(e) ground floor to attain 8'-0" finish ceiling height. (e) storage at the ground floor to be remain. | $15,000 |