Prescott Enterprises
- Based in
- San Francisco
- On San Francisco permits
- Jun 2008 to Oct 2019
- Last 24 months
- 0 permits filed
11 permits since 2000: 10 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 16, 2019 | Completed final sign-off Jan 2020 | 77 Landers St | 3/f: convert (e) closet into (n) 1/2 bathroom in second unit #2. amend to pa201809190715 for additional work.Details
3/f: convert (e) closet into (n) 1/2 bathroom in second unit #2. amend to pa201809190715 for additional work. | $5,000 |
| May 7, 2019 | Completed final sign-off Dec 2019 | 775 Pacheco St | 296.6 sf counditioned space added to home converting part of ground floor, ground fl. garage. fire seperation between dwelling unit & garage added, clad wood windows & doors at rear elevation onlyDetails
296.6 sf counditioned space added to home converting part of ground floor, ground fl. garage. fire seperation between dwelling unit & garage added, clad wood windows & doors at rear elevation only | $40,000 |
| Sep 19, 2018 | Completed final sign-off Jan 2020 | 77 Landers St | revisionto 201808026247 to memorialize structural field conditions. add new beam and posts at the ceiling of the lower unitDetails
revisionto 201808026247 to memorialize structural field conditions. add new beam and posts at the ceiling of the lower unit | $3,000 |
| Aug 31, 2018 | Never finaled issued Sep 2018, no final | 4329 Kirkham St | install half bath at 2nd level above garageDetails
install half bath at 2nd level above garage | $4,000 |
| Aug 2, 2018 | Completed final sign-off Jan 2020 | 77 Landers St | remove non-bearing wall, remove utility sink, move light switch, build non -bearing walls, sheetrock, add exit door.Details
remove non-bearing wall, remove utility sink, move light switch, build non -bearing walls, sheetrock, add exit door. | $5,000 |
| Jan 8, 2018 | Completed final sign-off Jun 2018 | 1818 Lyon St | add closet and remodel bathroom to include showerDetails
add closet and remodel bathroom to include shower | $20,000 |
| Jun 30, 2017 | Completed final sign-off Nov 2017 | 1170 Green St | repair water damage and wood rot - remove damaged siding and paint. work is visible from street.Details
repair water damage and wood rot - remove damaged siding and paint. work is visible from street. | $30,000 |
| Oct 3, 2013 | Completed final sign-off Oct 2013 | 2263 Union St | mechanical, title 24 reference 201309136796Details
mechanical, title 24 reference 201309136796 | $15,000 |
| Sep 13, 2013 | Completed final sign-off Oct 2013 | 2263 Union St | non structural ti: change use from retail to hair salon. lighting, new gyp bd, add shampoo sinks, electrical, hot water heater. remove e pilasters, fin wall. add power door operator,handrail at ramp, transition strip at flooring, hc toilet, grab bars, hc sink/faucet, change of use from m to b.Details
non structural ti: change use from retail to hair salon. lighting, new gyp bd, add shampoo sinks, electrical, hot water heater. remove e pilasters, fin wall. add power door operator,handrail at ramp, transition strip at flooring, hc toilet, grab bars, hc sink/faucet, change of use from m to b. | $20,000 |
| Feb 13, 2009 | Completed final sign-off Sep 2009 | 4416 19th St | install new kitchen cabinets, sink & fixtures, new appliances, 1 sliding door, new windows, remodel bathroom, shower, vanity & toilet. install new lighting (ceiling) tile work, floor, wall. all work on 2nd floor.Details
install new kitchen cabinets, sink & fixtures, new appliances, 1 sliding door, new windows, remodel bathroom, shower, vanity & toilet. install new lighting (ceiling) tile work, floor, wall. all work on 2nd floor. | $15,000 |
| Jun 25, 2008 | Completed final sign-off Dec 2008 | 109 Alton Av | remove and replace old kitchen cabinets with new, remove tile floor & install new. remove (e) two 8'x 5' doors. two 6' x 8' doors, one 3' x 3' window, one 4' x 2 1/2' window and replace with new. same size. u factor max 0.67. remove one 6' x 8' door & frame in new wall. as back of house.Details
remove and replace old kitchen cabinets with new, remove tile floor & install new. remove (e) two 8'x 5' doors. two 6' x 8' doors, one 3' x 3' window, one 4' x 2 1/2' window and replace with new. same size. u factor max 0.67. remove one 6' x 8' door & frame in new wall. as back of house. | $16,400 |