Permit GraphShortlistSan Francisco building permits since 2000

Premier Construction

Contractor license
611710
State license record
Based in
Half Moon Bay
On San Francisco permits
Nov 2010 to Dec 2022
Last 24 months
0 permits filed

2 permits since 2000: 2 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Dec 15, 2022Completed
final sign-off Jan 2023
139 Ulloa Stto comply with nov 202200206 item 8 b on termite report 37581. replace damage due to wood destroying beetles like for like. chip back stucco. remove damaged sheathing and approx 7 studs set new doug fir studs 1/2 " plywood and moisture membrane, restucco to match as close as possible.
Details
Permit
202212158441
Status
complete
Filed
Dec 15, 2022
Permit issued
Dec 15, 2022
Final sign-off
Jan 5, 2023
Declared cost
$6,000
Address
139 Ulloa St

to comply with nov 202200206 item 8 b on termite report 37581. replace damage due to wood destroying beetles like for like. chip back stucco. remove damaged sheathing and approx 7 studs set new doug fir studs 1/2 " plywood and moisture membrane, restucco to match as close as possible.

Open the permit page

$6,000
Nov 24, 2010Completed
final sign-off Sep 2011
2870 California Sttake out front planter boxes and set new due to dry rot repair framing below boxes; see report 26906 for repair description by premier termite dtd 912212010
Details
Permit
201011245629
Status
complete
Filed
Nov 24, 2010
Permit issued
Nov 24, 2010
Final sign-off
Sep 22, 2011
Declared cost
$11,000
Address
2870 California St

take out front planter boxes and set new due to dry rot repair framing below boxes; see report 26906 for repair description by premier termite dtd 912212010

Open the permit page

$11,000