Premier Construction
- Based in
- Half Moon Bay
- On San Francisco permits
- Nov 2010 to Dec 2022
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 15, 2022 | Completed final sign-off Jan 2023 | 139 Ulloa St | to comply with nov 202200206 item 8 b on termite report 37581. replace damage due to wood destroying beetles like for like. chip back stucco. remove damaged sheathing and approx 7 studs set new doug fir studs 1/2 " plywood and moisture membrane, restucco to match as close as possible.Details
to comply with nov 202200206 item 8 b on termite report 37581. replace damage due to wood destroying beetles like for like. chip back stucco. remove damaged sheathing and approx 7 studs set new doug fir studs 1/2 " plywood and moisture membrane, restucco to match as close as possible. | $6,000 |
| Nov 24, 2010 | Completed final sign-off Sep 2011 | 2870 California St | take out front planter boxes and set new due to dry rot repair framing below boxes; see report 26906 for repair description by premier termite dtd 912212010Details
take out front planter boxes and set new due to dry rot repair framing below boxes; see report 26906 for repair description by premier termite dtd 912212010 | $11,000 |