Preferred Power Solutions Inc
- Based in
- Bakersfield
- On San Francisco permits
- Apr 2019 to Mar 2021
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 18, 2021 | Completed final sign-off Aug 2021 | 3350 Mission St | ev: upgrade (e) ev dispensers. install (3) 175kw power gen units. remove & replace concrete pad as needed, same size. install (3) new dispensers with bollards. remove (e) unnecessary bollards. install light.Details
ev: upgrade (e) ev dispensers. install (3) 175kw power gen units. remove & replace concrete pad as needed, same size. install (3) new dispensers with bollards. remove (e) unnecessary bollards. install light. | $90,000 |
| Apr 30, 2019 | Completed final sign-off Apr 2020 | 1335 Webster St | install 1 utility transformer, 1 switchboard assembly, 3 (150kw) btc power units, 3 (150kw) btc dispensers, 1 level 2 chargerDetails
install 1 utility transformer, 1 switchboard assembly, 3 (150kw) btc power units, 3 (150kw) btc dispensers, 1 level 2 charger | $100,000 |