Power Engineering Contraction Co.
- Based in
- Alameda
- On San Francisco permits
- Jun 2000 to Aug 2026
- Last 24 months
- 1 permit filed
25 permits since 2000: 21 completed, 1 in progress, 3 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2026 | In progress filed Aug 2026, not yet issued | 1 Clipper Cove Wy | to demolish 1 story office building (marina office building)Details
to demolish 1 story office building (marina office building) | $521,697 |
| May 18, 2022 | Completed final sign-off Dec 2022 | 2 Avenue Of The Palms | administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 2020-0818-2044Details
administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 2020-0818-2044 | |
| May 18, 2022 | Completed final sign-off Jun 2022 | 2 Avenue Of The Palms | administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 2019-1120-7799Details
administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 2019-1120-7799 | |
| May 18, 2022 | Completed final sign-off Dec 2022 | 2 Avenue Of The Palms | administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 2020-1204-0242Details
administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 2020-1204-0242 | |
| May 18, 2022 | Completed final sign-off Jun 2022 | 2 Avenue Of The Palms | administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 202112073882Details
administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 202112073882 | |
| May 18, 2022 | Completed final sign-off Dec 2022 | 2 Avenue Of The Palms | administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 202101122537Details
administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 202101122537 | |
| May 18, 2022 | Completed final sign-off Dec 2022 | 2 Avenue Of The Palms | administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 2020-0916-4281Details
administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 2020-0916-4281 | |
| May 18, 2022 | Completed final sign-off Jun 2022 | 2 Avenue Of The Palms | administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit2021-0128-3576.Details
administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit2021-0128-3576. | |
| May 18, 2022 | Completed final sign-off Dec 2022 | 2 Avenue Of The Palms | administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 2021-0112-2536.Details
administrative permit to document change of address from: 1 avenue of the palms. to 2 avenue of the palms for permit 2021-0112-2536. | |
| May 17, 2022 | Expired or cancelled cancelled Jan 2026 | 2 Avenue Of The Palms | administrtive permit to document change of address from 1 avenue of the palms to 2 avenue of the palms for permits 2019-1120-7799, 2020-0818-2044, 2020-0916-4281,2020-1204-0242,2021-0112-2536,20210112-2537,2021-0128-3576,2021-1207-3882Details
administrtive permit to document change of address from 1 avenue of the palms to 2 avenue of the palms for permits 2019-1120-7799, 2020-0818-2044, 2020-0916-4281,2020-1204-0242,2021-0112-2536,20210112-2537,2021-0128-3576,2021-1207-3882 | |
| Dec 7, 2021 | Completed final sign-off Feb 2022 | 1 Avenue Of The Palms | ferry terminal revision to pa 2019-1120-7799 construction of a submerged rock dike between the concrete sheet pile breakwater & the landing slope at offshore locationDetails
ferry terminal revision to pa 2019-1120-7799 construction of a submerged rock dike between the concrete sheet pile breakwater & the landing slope at offshore location | |
| Jan 28, 2021 | Completed final sign-off Jan 2023 | 1 Avenue Of The Palms | ferry terminal fire protection system - construction of 4" dry standpipe fire protection system for the fixed pier (2020-0818-2044) and ferry float (2020-0916-4281)Details
ferry terminal fire protection system - construction of 4" dry standpipe fire protection system for the fixed pier (2020-0818-2044) and ferry float (2020-0916-4281) | $107,000 |
| Jan 12, 2021 | Completed final sign-off Dec 2022 | 1 Avenue Of The Palms | fixed pier utilities- construct power, water, comms and low volts systems on fixed pier-pa 202008182044, ferry float platform-202009164281, ramps, gangway-pa 202012040242Details
fixed pier utilities- construct power, water, comms and low volts systems on fixed pier-pa 202008182044, ferry float platform-202009164281, ramps, gangway-pa 202012040242 | $1,065,000 |
| Jan 12, 2021 | Completed final sign-off Dec 2022 | 1 Avenue Of The Palms | treasure island ferry terminal - construction of glass windscreen, roof sheathing and finish schedule on the fixed pier structure. ref pa 202008182044.Details
treasure island ferry terminal - construction of glass windscreen, roof sheathing and finish schedule on the fixed pier structure. ref pa 202008182044. | $3,500,000 |
| Dec 4, 2020 | Completed final sign-off Dec 2022 | 1 Avenue Of The Palms | priority plan review treasure island project. const of 2,260 sf of aluminum platforms, mechanically actvatep ramps, and stairs mounted top side of ferry float per pa #202009164281, construction of , 884 sf aluminum gangway connecting ferry loat platforms to fixed pier per pa #202008182044.Details
priority plan review treasure island project. const of 2,260 sf of aluminum platforms, mechanically actvatep ramps, and stairs mounted top side of ferry float per pa #202009164281, construction of , 884 sf aluminum gangway connecting ferry loat platforms to fixed pier per pa #202008182044. | $125,000 |
| Sep 16, 2020 | Completed final sign-off Dec 2022 | 1 Avenue Of The Palms | construction of a 42'x135" steel ferry landing float, reference to pa #202008182044 (concrete pier), pa #201911207799 (concrete breakwater) prior work.Details
construction of a 42'x135" steel ferry landing float, reference to pa #202008182044 (concrete pier), pa #201911207799 (concrete breakwater) prior work. | $250,000 |
| Aug 18, 2020 | Completed final sign-off Dec 2022 | 1 Avenue Of The Palms | construction of 156' concrete pier spanning shore abutment and (e) steel piles, reference pa #201911207799 for prior work including permitting of (e) steel piles. ferry terminal.Details
construction of 156' concrete pier spanning shore abutment and (e) steel piles, reference pa #201911207799 for prior work including permitting of (e) steel piles. ferry terminal. | $2,250,000 |
| Nov 20, 2019 | Completed final sign-off Feb 2022 | 1 Avenue Of The Palms | construction of new 760' long concrete breakwater constisting of concrete sheet piles,concrete batter piles and concrete cap. in addition, 8 each steel pipe piles will be driven for future construction of a ferry terminal.Details
construction of new 760' long concrete breakwater constisting of concrete sheet piles,concrete batter piles and concrete cap. in addition, 8 each steel pipe piles will be driven for future construction of a ferry terminal. | $15,180,000 |
| Jul 2, 2002 | Expired or cancelled expired Jul 2025 | 2990 Vallejo St | strengthening of foundation & patial seismic upgrade of basement & first floor (voluntary).Details
strengthening of foundation & patial seismic upgrade of basement & first floor (voluntary). | $386,000 |
| Dec 7, 2000 | Completed final sign-off Mar 2002 | 2 Dunnes Al | replace exterior old stairwayDetails
replace exterior old stairway | $100,000 |
| Nov 20, 2000 | Completed final sign-off Oct 2001 | 450 Broadway | repair of rockslope behind structure includes scaling, bolting and nettingDetails
repair of rockslope behind structure includes scaling, bolting and netting | $100,000 |
| Nov 20, 2000 | Completed final sign-off Oct 2001 | 2 Dunnes Al | repair rockslope below property including scaling,bolting, and nettingDetails
repair rockslope below property including scaling,bolting, and netting | $100,000 |
| Nov 20, 2000 | Completed final sign-off Oct 2001 | 455 Vallejo St | repair of rock slope below property including scaling/boltings and wettingDetails
repair of rock slope below property including scaling/boltings and wetting | $100,000 |
| Oct 19, 2000 | Completed final sign-off Oct 2001 | 440 Broadway | repair of rock slope behind structure of 440 broadway inc scaling,boltingDetails
repair of rock slope behind structure of 440 broadway inc scaling,bolting | $100,000 |
| Jun 28, 2000 | Expired or cancelled expired Dec 2000 | 440 Broadway | repair existing holes in 440 broadway at g/f level off haul loose debris at base of cliff scaleDetails
repair existing holes in 440 broadway at g/f level off haul loose debris at base of cliff scale | $5,000 |