Polyzos Construction
- Based in
- Castro Valley
- On San Francisco permits
- Mar 2014 to Oct 2015
- Last 24 months
- 0 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 19, 2015 | Completed final sign-off May 2016 | 435 10th Av | revision to 2014-0307-0225 in lieu of rated passage way & rated wall & openings on ground floor with ab-005 to provide the back most 25' of rear yard as an area of refuge. in addition, to change a sliding door to a sliding window. new steps & walkway on ground floorDetails
revision to 2014-0307-0225 in lieu of rated passage way & rated wall & openings on ground floor with ab-005 to provide the back most 25' of rear yard as an area of refuge. in addition, to change a sliding door to a sliding window. new steps & walkway on ground floor | |
| Mar 7, 2014 | Completed final sign-off May 2016 | 435 10th Av | horizontal & vertical addition in the rear for bedroom suite, den on the grd fl. (n) kitchen, family room, half bath & interior stair connect on the 2/fl to grd fl. extend (e) bedroom, and a (n) mstr suite on 3/fl. (n) deck off the 2/fl & 3/fl.Details
horizontal & vertical addition in the rear for bedroom suite, den on the grd fl. (n) kitchen, family room, half bath & interior stair connect on the 2/fl to grd fl. extend (e) bedroom, and a (n) mstr suite on 3/fl. (n) deck off the 2/fl & 3/fl. | $285,000 |