Plazo Construction
- Based in
- Daly City
- On San Francisco permits
- Jan 2008 to Aug 2013
- Last 24 months
- 0 permits filed
6 permits since 2000: 5 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 15, 2013 | Expired or cancelled withdrawn Oct 2013 | 1325 Revere Av | remove extg unapproved wiring and plmbg on kitchen at garage level correct violation #201276841. install a patio door and built a deck and stair. resolve complaint #201276762Details
remove extg unapproved wiring and plmbg on kitchen at garage level correct violation #201276841. install a patio door and built a deck and stair. resolve complaint #201276762 | $4,500 |
| Aug 5, 2009 | Completed final sign-off Aug 2009 | 3769 Folsom St | replace 2 windows at rear side on 2nd floor. not visible from street.Details
replace 2 windows at rear side on 2nd floor. not visible from street. | $1,200 |
| Nov 7, 2008 | Completed final sign-off Dec 2008 | 167 Molimo Dr | change sheetrock on living room on 2nd floor ceiling & wall. 300 sq. ft.Details
change sheetrock on living room on 2nd floor ceiling & wall. 300 sq. ft. | $2,500 |
| Oct 6, 2008 | Completed final sign-off Nov 2008 | 350 Burrows St | put drywall firecode 5/8" on ceiling & wall of garage. update electrical panel. exterior paint.Details
put drywall firecode 5/8" on ceiling & wall of garage. update electrical panel. exterior paint. | $18,000 |
| Sep 2, 2008 | Completed final sign-off Aug 2009 | 550 46th Av | remove existing rear stair and build a rear deck & stair.Details
remove existing rear stair and build a rear deck & stair. | $3,000 |
| Jan 29, 2008 | Completed final sign-off Mar 2008 | 1628 Kirkwood Av | all old deck & stair to be replaced in kind. deck and door will be removed on 3rd floor.Details
all old deck & stair to be replaced in kind. deck and door will be removed on 3rd floor. | $5,000 |