Planning & Architecture
- Based in
- Oakland
- On San Francisco permits
- Feb 2002 to Feb 2026
- Last 24 months
- 1 permit filed
20 permits since 2000: 18 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 27, 2026 | In progress issued Feb 2026 | 72 Townsend St | cabinetry, dry wall patching, painting installation, painting, electrical plumbing under separate permitsDetails
cabinetry, dry wall patching, painting installation, painting, electrical plumbing under separate permits | $25,000 |
| Mar 25, 2021 | Completed final sign-off Sep 2025 | 434 41st Av | convert lower flr to adu. add: apvers to driveway,street tree, bike parking,5/8" drywall to corridor/ceiling @ garage, 4 self closing doors.replace: ducts w/ metal ducts @ garage. add vents/co detector. replace entry door. new entry to adu.Details
convert lower flr to adu. add: apvers to driveway,street tree, bike parking,5/8" drywall to corridor/ceiling @ garage, 4 self closing doors.replace: ducts w/ metal ducts @ garage. add vents/co detector. replace entry door. new entry to adu. | $19,700 |
| Nov 20, 2020 | Completed final sign-off Aug 2025 | 434 41st Av | replace existing windows, access to new elevated wood deck. revision to permit # 202009254973 and 202010237240. new deck at second fl.Details
replace existing windows, access to new elevated wood deck. revision to permit # 202009254973 and 202010237240. new deck at second fl. | $70,000 |
| Nov 6, 2020 | Completed final sign-off Oct 2021 | 434 41st Av | to comply with complaint# 202064601. rot repairs in kind to rear and side lower walls and windows. work to include framing, insulation, window and drywall replacement. new siding. no changes to window locations or sizes.Details
to comply with complaint# 202064601. rot repairs in kind to rear and side lower walls and windows. work to include framing, insulation, window and drywall replacement. new siding. no changes to window locations or sizes. | $15,000 |
| Oct 23, 2020 | Expired or cancelled expired Aug 2025 | 434 41st Av | repairs to (e) deck and stairs. less than 50%Details
repairs to (e) deck and stairs. less than 50% | $5,000 |
| Sep 25, 2020 | Completed final sign-off Sep 2021 | 434 41st Av | remodel (e) kitchen wiht (n) cabinets, appliances, and finishes. minor upgrades to plumbing, electrical, lightingDetails
remodel (e) kitchen wiht (n) cabinets, appliances, and finishes. minor upgrades to plumbing, electrical, lighting | $40,000 |
| May 7, 2019 | Completed final sign-off Aug 2019 | 146 Beaumont Av | window replacement to match existing. wood windows, in kind, same operation.Details
window replacement to match existing. wood windows, in kind, same operation. | $10,000 |
| May 7, 2019 | Completed final sign-off Aug 2019 | 148 Beaumont Av | renovation to building facade facing street including new windows and siding. no change to appearance. wood windows, in kind, same operation. wood siding to match existing.Details
renovation to building facade facing street including new windows and siding. no change to appearance. wood windows, in kind, same operation. wood siding to match existing. | $20,000 |
| Nov 23, 2015 | Completed final sign-off Mar 2016 | 650 Delancey St | bathroom remodel including new cabinets, fixtures & finishes. plumbing & electrical work under seperate permits. compliance with maher ordinance no 155-13 not required.Details
bathroom remodel including new cabinets, fixtures & finishes. plumbing & electrical work under seperate permits. compliance with maher ordinance no 155-13 not required. | $15,000 |
| Aug 26, 2015 | Completed final sign-off Dec 2015 | 650 Delancey St | construction of an interior partition and one door. new hardwood floor. n/a for maher.Details
construction of an interior partition and one door. new hardwood floor. n/a for maher. | $20,000 |
| Dec 7, 2009 | Completed final sign-off Apr 2010 | 650 Delancey St | live work unit 403, 4th floor. remodel 2 bathrooms. work to include new tile and paint, new cainets and plumbing fixtures. elec and plbg under separate permits. no wall removal or addition.Details
live work unit 403, 4th floor. remodel 2 bathrooms. work to include new tile and paint, new cainets and plumbing fixtures. elec and plbg under separate permits. no wall removal or addition. | $30,000 |
| Sep 3, 2009 | Completed final sign-off Apr 2010 | 650 Delancey St | work @ unit# 403 only. kitchen remodel including replacing cabinets & counters, some appliances. minor electrical & plumbing work under seperate permits.Details
work @ unit# 403 only. kitchen remodel including replacing cabinets & counters, some appliances. minor electrical & plumbing work under seperate permits. | $25,000 |
| Jan 23, 2009 | Completed final sign-off Apr 2010 | 18 Roanoke St | revision to pa# 2008-0331-8361-changes include omitting balcony to leave roof as is, reconfiguring of interior walls at garage level. change in stair detailing from steel to woodDetails
revision to pa# 2008-0331-8361-changes include omitting balcony to leave roof as is, reconfiguring of interior walls at garage level. change in stair detailing from steel to wood | |
| Mar 31, 2008 | Completed final sign-off Apr 2010 | 18 Roanoke St | rebuild & enlarge deck, addition of family room, all work @ rear of building. new balcony @ 2nd floor.Details
rebuild & enlarge deck, addition of family room, all work @ rear of building. new balcony @ 2nd floor. | $110,000 |
| Jul 16, 2007 | Completed final sign-off Oct 2007 | 3172 Sacramento St | bathroom remodel on 3/f. replacement of fixtures and finishes. no structural work. plumbing & electrical work under seperate permit.Details
bathroom remodel on 3/f. replacement of fixtures and finishes. no structural work. plumbing & electrical work under seperate permit. | $20,000 |
| Jan 27, 2006 | Completed final sign-off Dec 2006 | 3172 Sacramento St | kitchen remodel. new cabinets and appiances. bathroom remodel upstairs. bathroom fixture replacement only downstairs. plumbing and electrical work under seperate permits. kitchen 2nd floor. bathrooms on 2nd & 3rd floor.Details
kitchen remodel. new cabinets and appiances. bathroom remodel upstairs. bathroom fixture replacement only downstairs. plumbing and electrical work under seperate permits. kitchen 2nd floor. bathrooms on 2nd & 3rd floor. | $50,000 |
| May 4, 2005 | Completed final sign-off May 2005 | 1902 Lyon St | renew permit app 200410045887 no. 1037967Details
renew permit app 200410045887 no. 1037967 | |
| Oct 4, 2004 | Completed final sign-off May 2005 | 1902 Lyon St | kitchen remodel, new cabinets, appliances & finishes. partitions to be modified or removed are nonDetails
kitchen remodel, new cabinets, appliances & finishes. partitions to be modified or removed are non | $25,000 |
| Jan 16, 2004 | Completed final sign-off Dec 2004 | 3190 Sacramento St | remodel 1 kitchen & 2 bathrooms,(n)doorway in kitchen in non bearing wall,(n)pocket door in bathroomDetails
remodel 1 kitchen & 2 bathrooms,(n)doorway in kitchen in non bearing wall,(n)pocket door in bathroom | $40,000 |
| Feb 13, 2002 | Completed final sign-off Jun 2005 | 127 Belvedere St | 2 story addition at rear of bldg housing 4 new connecting stair between 1st & 2nd floorsDetails
2 story addition at rear of bldg housing 4 new connecting stair between 1st & 2nd floors | $100,000 |