Pionic Unit Construction Co
- Based in
- Pacifica
- On San Francisco permits
- Jan 2014 to Feb 2025
- Last 24 months
- 1 permit filed
14 permits since 2000: 14 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 5, 2025 | Completed final sign-off Dec 2025 | 137 Oxford St | nov#: 202430051; remove horizontal expansion of a living area and full bath on the first flr level at rear of structure under deck. exceeding work under pa#: 201601157184.Details
nov#: 202430051; remove horizontal expansion of a living area and full bath on the first flr level at rear of structure under deck. exceeding work under pa#: 201601157184. | $10,000 |
| Sep 13, 2019 | Completed final sign-off Dec 2019 | 111 Galewood Cr | remove (e) stucco from 1/2 to roof at right side exterior wall, reinstall new stucco from 1/2 to roof at right side exterior wallDetails
remove (e) stucco from 1/2 to roof at right side exterior wall, reinstall new stucco from 1/2 to roof at right side exterior wall | $20,000 |
| Jun 13, 2018 | Completed final sign-off Jun 2018 | 111 Galewood Cr | (1) kitchen remodel including cabinets, counter tops, electrical & plumbing at 2/f. 2.5 bathroom & toilet remodel including electrical & plumbing at 2/f & 3/f. no change to existing floor plan.Details
(1) kitchen remodel including cabinets, counter tops, electrical & plumbing at 2/f. 2.5 bathroom & toilet remodel including electrical & plumbing at 2/f & 3/f. no change to existing floor plan. | $45,000 |
| Feb 8, 2018 | Completed final sign-off Jun 2018 | 111 Galewood Cr | painting to wall and ceiling at 2nd and 3rd floor. replacement of carpet to hardwood flooring at 2nd and 3rd floors living dining , bedrroms and kitchen. replacement ow all and floor tiles at bathrooms and toilets.Details
painting to wall and ceiling at 2nd and 3rd floor. replacement of carpet to hardwood flooring at 2nd and 3rd floors living dining , bedrroms and kitchen. replacement ow all and floor tiles at bathrooms and toilets. | $38,000 |
| Sep 13, 2017 | Completed final sign-off Apr 2021 | 2158 44th Av | horizontal additon, remodel kitchen area, add one family room, one bath at 1st fl, add master bed and one bath. mech, elec and plumbing under separate permitDetails
horizontal additon, remodel kitchen area, add one family room, one bath at 1st fl, add master bed and one bath. mech, elec and plumbing under separate permit | $180,000 |
| Jun 26, 2017 | Completed final sign-off Nov 2019 | 1235 Mission St | barrier removal of extg, non compliant stair/guardrail and hanrail in 2 extg stairs. replace with new code compliant guardrail and handrail in all locations where feasible. n/a for maherDetails
barrier removal of extg, non compliant stair/guardrail and hanrail in 2 extg stairs. replace with new code compliant guardrail and handrail in all locations where feasible. n/a for maher | $40,000 |
| May 11, 2016 | Completed final sign-off Dec 2016 | 695 48th Av | soft story retrofit per sfbc chapter 34b engineering criteria: other rational design.Details
soft story retrofit per sfbc chapter 34b engineering criteria: other rational design. | $25,000 |
| Jul 24, 2015 | Completed final sign-off Nov 2015 | 3010 23rd Av | at 3/f, remove & rebuild fire damaged roof and wall in kind, repair roof and wall shall match (e) in profile material & style.Details
at 3/f, remove & rebuild fire damaged roof and wall in kind, repair roof and wall shall match (e) in profile material & style. | $1,000 |
| Mar 16, 2015 | Completed final sign-off Oct 2015 | 1531 31st Av | remove partial partition wall, re-arrange kitchen layout, all work at second floor.Details
remove partial partition wall, re-arrange kitchen layout, all work at second floor. | $16,000 |
| Nov 14, 2014 | Completed final sign-off Apr 2015 | 874 33rd Av | revision to 201409126243. add family room, bedroom, bath on 1st flDetails
revision to 201409126243. add family room, bedroom, bath on 1st fl | $30,000 |
| Oct 6, 2014 | Completed final sign-off Apr 2015 | 47 Guttenberg St | comply with complaint 200665991, legalize (2) bedrooms, laundry room, storage rm & construct one full bathroom. all work at ground floor.Details
comply with complaint 200665991, legalize (2) bedrooms, laundry room, storage rm & construct one full bathroom. all work at ground floor. | $38,000 |
| Sep 12, 2014 | Completed final sign-off Apr 2015 | 874 33rd Av | renovate of existing duplex: add 1/2 bath and remodel (e) kitchen & bathroom for both units. replace (e) windows at lightwell and rear of the building on 2/f & 3/f.Details
renovate of existing duplex: add 1/2 bath and remodel (e) kitchen & bathroom for both units. replace (e) windows at lightwell and rear of the building on 2/f & 3/f. | $60,000 |
| Sep 8, 2014 | Completed final sign-off Jan 2015 | 15 Regent St | construct two bedrooms, laundry room & one full bathroom. all work at ground floor.Details
construct two bedrooms, laundry room & one full bathroom. all work at ground floor. | $28,000 |
| Jan 9, 2014 | Completed final sign-off Oct 2014 | 11 Leo St | construct 2 bedrooms, 1 full bath, laundry room. al work at gr flDetails
construct 2 bedrooms, 1 full bath, laundry room. al work at gr fl | $28,000 |