Pinnacle Roofing Co
- Based in
- Oakland
- On San Francisco permits
- Dec 2018 to Jan 2026
- Last 24 months
- 7 permits filed
17 permits since 2000: 11 completed, 6 never finaled.
Of the 6 never-finaled permits, 2 are 3 to 5 years old, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 9, 2026 | Completed final sign-off Jan 2026 | 1061 Filbert St | re-roofing with torch downDetails
re-roofing with torch down | $13,600 |
| Sep 9, 2025 | Completed final sign-off Sep 2025 | 66 09th St | reroofing: overlay title 24 modified bitumen torch down.Details
reroofing: overlay title 24 modified bitumen torch down. | $80,000 |
| Aug 27, 2025 | Completed final sign-off Sep 2025 | 1805 San Jose Av | re-roofing. torch down 30squaresDetails
re-roofing. torch down 30squares | $32,000 |
| Aug 19, 2025 | Completed final sign-off Aug 2025 | 338 Marietta Dr | reroofing- torch downDetails
reroofing- torch down | $8,500 |
| Mar 19, 2025 | Completed final sign-off Mar 2025 | 151 Rice St | re-roofing with hot works.Details
re-roofing with hot works. | $7,200 |
| Mar 4, 2025 | Completed final sign-off Mar 2025 | 2319 27th Av | re-roofing with hot works.Details
re-roofing with hot works. | $8,640 |
| Oct 22, 2024 | Completed final sign-off Nov 2024 | 231 Texas St | re-roofing: torch down (hot works) - remove existing roof surface: new waterproofing membrane: new rubber modified bitumenDetails
re-roofing: torch down (hot works) - remove existing roof surface: new waterproofing membrane: new rubber modified bitumen | $17,600 |
| Jun 26, 2024 | Completed final sign-off Jan 2025 | 2530 19th Av | remove existing roof. new waterproofing membrane. new granulated modified bitumen roofingDetails
remove existing roof. new waterproofing membrane. new granulated modified bitumen roofing | $10,400 |
| Apr 8, 2024 | Completed final sign-off Jan 2025 | 30 Santa Monica Wy | reroofingDetails
reroofing | $9,000 |
| Oct 25, 2023 | Completed final sign-off Jan 2025 | 1427 29th Av | reroofing at flat portion only. no work to front roof tiles.Details
reroofing at flat portion only. no work to front roof tiles. | $7,800 |
| Aug 22, 2023 | Completed final sign-off Jun 2024 | 2535 30th Av | reroofingDetails
reroofing | $5,800 |
| Jun 13, 2022 | Never finaled issued Jun 2022, no final | 3144 Anza St | roof repair with torch roofing material.Details
roof repair with torch roofing material. | $2,500 |
| Nov 15, 2021 | Never finaled issued Nov 2021, no final | 821 Capitol Av | reroofingDetails
reroofing | $6,000 |
| Dec 10, 2020 | Never finaled issued Dec 2020, no final | 3342 San Bruno Av | roof repair more than 20%Details
roof repair more than 20% | $5,000 |
| Dec 10, 2020 | Never finaled issued Dec 2020, no final | 225 Vienna St | roof repair more than 20%Details
roof repair more than 20% | $5,000 |
| Jan 23, 2019 | Never finaled issued Jan 2019, no final | 2139 21st Av | reroofDetails
reroof | $5,220 |
| Dec 20, 2018 | Never finaled issued Dec 2018, no final | 1765 Turk St | reroofingDetails
reroofing | $7,000 |