Peter Spediacci Company
- Based in
- San Francisco
- On San Francisco permits
- Sep 2009 to Jul 2019
- Last 24 months
- 0 permits filed
10 permits since 2000: 10 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 26, 2019 | Completed final sign-off Jul 2019 | 650 Church St | administrative permit to correct pa# 201904127917. to reflect correct nov which should have been 201890941. for document only.Details
administrative permit to correct pa# 201904127917. to reflect correct nov which should have been 201890941. for document only. | |
| Jul 24, 2019 | Completed final sign-off Jul 2019 | 3947 18th St | adminstrative permit to correct pa #201903296720, complying with nov #201920673, item #2 & #3 which are completed in this permit.Details
adminstrative permit to correct pa #201903296720, complying with nov #201920673, item #2 & #3 which are completed in this permit. | |
| Apr 12, 2019 | Completed final sign-off May 2019 | 650 Church St | to comply with nov 201800321 0new permit to remove chimney for apartment 1 & 2Details
to comply with nov 201800321 0new permit to remove chimney for apartment 1 & 2 | $2,500 |
| Jan 29, 2018 | Completed final sign-off Feb 2018 | 488 30th St | to comply with nov #201721491 #2. add hand rails.Details
to comply with nov #201721491 #2. add hand rails. | $500 |
| Sep 11, 2017 | Completed final sign-off Sep 2019 | 661 Castro St | soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4Details
soft story retrofit per sfebc chapter 4d: 2016 cebc appendix a-4 | $50,000 |
| Jan 22, 2013 | Completed final sign-off Mar 2014 | 35 Capp St | remove plaster walls & ceiling, replace with 5/8 fr sheetrock. replace some trim & add insulation to exterior walls. replace tile in bathrooms on 3 units only. no change on walls and openings.Details
remove plaster walls & ceiling, replace with 5/8 fr sheetrock. replace some trim & add insulation to exterior walls. replace tile in bathrooms on 3 units only. no change on walls and openings. | $36,000 |
| Nov 14, 2012 | Completed final sign-off Dec 2012 | 2295 Vallejo St | remove dry rot sections & replace with pit, not visible from the street. repair 5 story rear stairs in various locations. repair 1 small bridge crossing to upper yard extensionDetails
remove dry rot sections & replace with pit, not visible from the street. repair 5 story rear stairs in various locations. repair 1 small bridge crossing to upper yard extension | $750 |
| Aug 6, 2012 | Completed final sign-off Oct 2012 | 1720 Quesada Av | repair leak in plumbing in lower unit, replace shower valve & bath valve, replace flooring due to water damage, check for dryrot & repair as needed, wrap heater vent pipes.Details
repair leak in plumbing in lower unit, replace shower valve & bath valve, replace flooring due to water damage, check for dryrot & repair as needed, wrap heater vent pipes. | $5,000 |
| Nov 10, 2011 | Completed final sign-off Feb 2012 | 32 Terra Vista Av | work in unit #3: repair dry rot on decking platform. replace 7 boards with pressure treated 2x16 15 ft. boards. paint new boards to match as same color. replacement less than 50% of same.Details
work in unit #3: repair dry rot on decking platform. replace 7 boards with pressure treated 2x16 15 ft. boards. paint new boards to match as same color. replacement less than 50% of same. | $450 |
| Sep 16, 2009 | Completed final sign-off Jan 2010 | 2230 26th Av | minor remodel of bathroom. rpelace fixtures and tile bath. texture walls and paint. no structural changesDetails
minor remodel of bathroom. rpelace fixtures and tile bath. texture walls and paint. no structural changes | $6,000 |