Peter Riechers
- Based in
- Napa
- On San Francisco permits
- Mar 2017 to Mar 2017
- Last 24 months
- 0 permits filed
1 permit since 2000: 1 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 23, 2017 | Completed final sign-off Dec 2023 | 3479 Mission St | horiz & vert addition.(e)3 story tall res'dl bldg w/1 comm'l.rear yard addition at 1/f&2/f levels. expand(e)attic space to add new resid'l unit at 4/f level w/2 bedrms, 1 bath.add new fixture stair betwn 3/f&4/f levels at rear yard.new fire rated wall adj to extr stair at rear yard.Details
horiz & vert addition.(e)3 story tall res'dl bldg w/1 comm'l.rear yard addition at 1/f&2/f levels. expand(e)attic space to add new resid'l unit at 4/f level w/2 bedrms, 1 bath.add new fixture stair betwn 3/f&4/f levels at rear yard.new fire rated wall adj to extr stair at rear yard. | $284,000 |