Peter Lawlor Construction
- Based in
- San Francisco
- On San Francisco permits
- Nov 2007 to Nov 2013
- Last 24 months
- 0 permits filed
17 permits since 2000: 15 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 26, 2013 | Completed final sign-off Dec 2013 | 755 Darien Wy | removing dry rot at rear and side of building and reairing in kindDetails
removing dry rot at rear and side of building and reairing in kind | $5,700 |
| Jul 18, 2013 | Completed final sign-off Nov 2013 | 743 Polk St | to comply with ordinance 029-13 only, installation of grab bars in sro at the following 2nd,3rd and 4th flrs total 7 grab bars in 3 bathroomsDetails
to comply with ordinance 029-13 only, installation of grab bars in sro at the following 2nd,3rd and 4th flrs total 7 grab bars in 3 bathrooms | $600 |
| Dec 11, 2012 | Completed final sign-off Apr 2013 | 536 Leavenworth St | to comply with nov #200345791; any new kitchen/bathroom fans to tie 2 existing ductwork, remodel kitchen and bath in units #54,45,1101, 43 and bath in unit #41 new lighting in kitchen 50% high efficacy, lighting in bathroom to high efficacy and controllled by occupancy sensorDetails
to comply with nov #200345791; any new kitchen/bathroom fans to tie 2 existing ductwork, remodel kitchen and bath in units #54,45,1101, 43 and bath in unit #41 new lighting in kitchen 50% high efficacy, lighting in bathroom to high efficacy and controllled by occupancy sensor | $35,000 |
| Nov 13, 2012 | Completed final sign-off Nov 2012 | 15 Escondido Av | dry rot: replacing wood at back and front of building, 240 sq.ft. approx, finished wih stucco replace in kindDetails
dry rot: replacing wood at back and front of building, 240 sq.ft. approx, finished wih stucco replace in kind | $7,000 |
| Nov 9, 2012 | Completed final sign-off Jan 2013 | 20 Toledo Wy | to comply with physical inspection report #cc-7171Details
to comply with physical inspection report #cc-7171 | |
| May 9, 2011 | Never finaled issued Dec 2015, no final | 2159 Quesada Av | addition of a bedroom upstairs approx 220 sq. ft & a studio room downstairs approx 240 sq. ft. including stairs, with a lightwell, accessing the 1st floor & back yard.Details
addition of a bedroom upstairs approx 220 sq. ft & a studio room downstairs approx 240 sq. ft. including stairs, with a lightwell, accessing the 1st floor & back yard. | $65,000 |
| Feb 15, 2011 | Completed final sign-off Feb 2012 | 20 Toledo Wy | interior remodel consisting of new internal stairs connecting to basement with new bedroom, bathroom & closet. remove one post, strengthen beam. work per plans.Details
interior remodel consisting of new internal stairs connecting to basement with new bedroom, bathroom & closet. remove one post, strengthen beam. work per plans. | $53,000 |
| Oct 25, 2010 | Completed final sign-off Nov 2010 | 2325 Bush St | putting a new door into bedroom. putting 3 new fire dampers in furnace. putting a new intake for furnace grit in up stairs. patching all hole on sheet rock in garage.Details
putting a new door into bedroom. putting 3 new fire dampers in furnace. putting a new intake for furnace grit in up stairs. patching all hole on sheet rock in garage. | $3,400 |
| Aug 20, 2010 | Completed final sign-off Aug 2010 | 29 03rd St | repairing, topping on sidewalk, not disturbing the framing belowDetails
repairing, topping on sidewalk, not disturbing the framing below | $11,500 |
| Jan 28, 2010 | Completed final sign-off Feb 2010 | 661 Peralta Av | replace siding on side off bldg. no visable from street.Details
replace siding on side off bldg. no visable from street. | $7,000 |
| Aug 27, 2009 | Completed final sign-off Sep 2009 | 89 Webster St | reroofing.Details
reroofing. | $8,500 |
| May 20, 2009 | Completed final sign-off Jul 2009 | 246 Kearny St | sidewalk repair new topping slab.Details
sidewalk repair new topping slab. | $9,000 |
| Oct 22, 2008 | Completed final sign-off Oct 2008 | 2725 Broadway | reroofing (replacing roof with tourch on rubber). no structural work.Details
reroofing (replacing roof with tourch on rubber). no structural work. | $6,500 |
| Jul 31, 2008 | Completed final sign-off Aug 2008 | 2209 Gough St | replace a wooden beam with steel in the court yard area on 3rd floor.Details
replace a wooden beam with steel in the court yard area on 3rd floor. | $4,800 |
| Mar 3, 2008 | Completed final sign-off Mar 2008 | 64 Cervantes Bl | construct a 8'x17' redeood deck with stairs going down to yard, install 30" door where existing window is - at the rear of ground floor.Details
construct a 8'x17' redeood deck with stairs going down to yard, install 30" door where existing window is - at the rear of ground floor. | $10,000 |
| Dec 7, 2007 | Expired or cancelled expired Dec 2008 | 632 Banks St | replace a window with a 4 feet french door. a new deck with stair 52" above grade.Details
replace a window with a 4 feet french door. a new deck with stair 52" above grade. | $6,000 |
| Nov 15, 2007 | Completed final sign-off Feb 2008 | 2215 Gough St | replacing at exterior stair on cour yerd in kind, less than 50% on 2nd , 3rd fl and roof.Details
replacing at exterior stair on cour yerd in kind, less than 50% on 2nd , 3rd fl and roof. | $20,000 |