Peter G Low
- Based in
- San Francisco
- On San Francisco permits
- Jun 2008 to Mar 2020
- Last 24 months
- 0 permits filed
16 permits since 2000: 14 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2020 | Completed final sign-off Feb 2021 | 2014 Clement St | add in new bathroom in extg 2nd floor dining room. no change to bldg footprintDetails
add in new bathroom in extg 2nd floor dining room. no change to bldg footprint | $10,000 |
| Oct 25, 2018 | Completed final sign-off Dec 2018 | 821 Folsom St | #102: add in restroom in side extg commercial space.Details
#102: add in restroom in side extg commercial space. | $6,000 |
| Oct 30, 2017 | Completed final sign-off Jun 2018 | 526 Castenada Av | revision to app#201707273159 and 201708144785. 1st floor reconfigure bathroom layout relocate laundry area and furnace. 2nd floor relocate kitchen and bedroom. add bedroom and new skylight. replace door to sliding glass door @ rear, remove bay window replace w/sliding glass door.Details
revision to app#201707273159 and 201708144785. 1st floor reconfigure bathroom layout relocate laundry area and furnace. 2nd floor relocate kitchen and bedroom. add bedroom and new skylight. replace door to sliding glass door @ rear, remove bay window replace w/sliding glass door. | |
| Aug 14, 2017 | Never finaled issued Aug 2017, no final | 526 Castenada Av | remodel (e) kitchen & bathroom on second floor in kind.Details
remodel (e) kitchen & bathroom on second floor in kind. | $28,000 |
| Jul 27, 2017 | Never finaled issued Aug 2017, no final | 526 Castenada Av | 1st fl - new bathroom and bedroom. new bathroom on 2nd floorDetails
1st fl - new bathroom and bedroom. new bathroom on 2nd floor | $18,000 |
| Jun 28, 2017 | Completed final sign-off Sep 2017 | 621 42nd Av | new deck per plan at rearDetails
new deck per plan at rear | $6,000 |
| Nov 8, 2016 | Completed final sign-off Jun 2018 | 2727 34th Av | legalize rooms on 1st flr as 2nd unit including 3 bdrms, 2 bath, kitchen, dining & living. add windows @ side, relocate water heater, furnace. replace foundation. unit legalization ordinance 43-14.Details
legalize rooms on 1st flr as 2nd unit including 3 bdrms, 2 bath, kitchen, dining & living. add windows @ side, relocate water heater, furnace. replace foundation. unit legalization ordinance 43-14. | $120,000 |
| Dec 14, 2012 | Completed final sign-off Dec 2012 | 2436 Fulton St | replace 8 window in unit #4 visible from the street. replace from wood to ultra window.Details
replace 8 window in unit #4 visible from the street. replace from wood to ultra window. | $3,800 |
| Jan 18, 2012 | Completed final sign-off Sep 2012 | 2099 Folsom St | replace kitchen counter, hood, sink, water heater to tankless water heater. change restroom to accessible restroom. exhaust hood and fan under separate permitDetails
replace kitchen counter, hood, sink, water heater to tankless water heater. change restroom to accessible restroom. exhaust hood and fan under separate permit | $28,000 |
| Feb 3, 2010 | Completed final sign-off Feb 2010 | 926 Fillmore St | apt. 208: remove the (e) floor tiles of shower. install (n) floor tiles in bathroom floor only. (no other work).Details
apt. 208: remove the (e) floor tiles of shower. install (n) floor tiles in bathroom floor only. (no other work). | $2,000 |
| Feb 2, 2010 | Completed final sign-off Feb 2010 | 347 Dolores St | work @ apt# 221 only. remove & replace bathtub with new ada shower. no structural work.Details
work @ apt# 221 only. remove & replace bathtub with new ada shower. no structural work. | $2,500 |
| Jan 13, 2010 | Completed final sign-off Feb 2010 | 926 Fillmore St | remove existing damage floor tile. install new floor tile in bathroom only. (no other work).Details
remove existing damage floor tile. install new floor tile in bathroom only. (no other work). | $2,000 |
| Apr 16, 2009 | Completed final sign-off Jun 2009 | 1340 Golden Gate Av | replace the shower to one piece shower set in 2nd flr bathroom @hall way areaDetails
replace the shower to one piece shower set in 2nd flr bathroom @hall way area | $2,800 |
| Nov 18, 2008 | Completed final sign-off Jun 2009 | 2123 44th Av | renew pa# 2007/09/27/3858 to complete work & obtain final inspection. reference pa# 2008/04/15/9768.Details
renew pa# 2007/09/27/3858 to complete work & obtain final inspection. reference pa# 2008/04/15/9768. | $5,000 |
| Nov 5, 2008 | Completed final sign-off Jan 2009 | 926 Fillmore St | work @ apt# 106 only. replace 1 bathtub to be a 1 shower @ same location. no change to window, door exit.Details
work @ apt# 106 only. replace 1 bathtub to be a 1 shower @ same location. no change to window, door exit. | $2,500 |
| Jun 26, 2008 | Completed final sign-off Sep 2008 | 5227 Anza St | remodel the kitchen & bathroom. change the new cabinet & fixture. new sink, new counter & light fixture in kitchen. replace new sink & cabinet, new toilet, new bathtub & new tile of bathroom.Details
remodel the kitchen & bathroom. change the new cabinet & fixture. new sink, new counter & light fixture in kitchen. replace new sink & cabinet, new toilet, new bathtub & new tile of bathroom. | $20,000 |