Performance Systems Co
- Based in
- Paramount
- On San Francisco permits
- Aug 2005 to Mar 2012
- Last 24 months
- 0 permits filed
8 permits since 2000: 3 completed, 5 never finaled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 27, 2012 | Never finaled issued Mar 2012, no final | 2445 16th St | proposed (1) 400,000 btu air make up unit for 1 existing paint spray booth. revison to 201202033468Details
proposed (1) 400,000 btu air make up unit for 1 existing paint spray booth. revison to 201202033468 | |
| Feb 3, 2012 | Never finaled issued Feb 2012, no final | 2445 16th St | proposed gasline permit for a heater unit (1,000,000 btu) within a existing bldg, heater on spray booth.legalize existing sparay booth for planning purposes.Details
proposed gasline permit for a heater unit (1,000,000 btu) within a existing bldg, heater on spray booth.legalize existing sparay booth for planning purposes. | $15,000 |
| Feb 1, 2012 | Completed final sign-off Jun 2012 | 265 Eddy St | install paint spray booth for auto repair within (e) building.Details
install paint spray booth for auto repair within (e) building. | $15,000 |
| Sep 15, 2011 | Never finaled issued Oct 2011, no final | 1240 17th St | proposed to replace (e) spray booth with new within (e) building. fire permit required for flammable combustibles.Details
proposed to replace (e) spray booth with new within (e) building. fire permit required for flammable combustibles. | $50,000 |
| Feb 25, 2011 | Completed final sign-off May 2011 | 1850 Cesar Chavez St | replacing an (e) permitted spray booth with a new spray booth, same type of spray booth.Details
replacing an (e) permitted spray booth with a new spray booth, same type of spray booth. | $20,000 |
| Feb 23, 2011 | Never finaled issued Feb 2011, no final | 340 Fell St | install new gas line and motor for existing spray booth. (heater unit on existing booth).Details
install new gas line and motor for existing spray booth. (heater unit on existing booth). | $3,500 |
| Sep 17, 2009 | Never finaled issued Sep 2009, no final | 450 Potrero Av | proposed fire suppression system for one pre-fab spray booth & paint mixing room.Details
proposed fire suppression system for one pre-fab spray booth & paint mixing room. | $4,500 |
| Aug 2, 2005 | Completed final sign-off Dec 2005 | 948 Folsom St | remove (e) crossdraft auto spraybooth & install new-listed accudraft down draft with 1.5 mbtu heaterDetails
remove (e) crossdraft auto spraybooth & install new-listed accudraft down draft with 1.5 mbtu heater | $100,000 |