Perezalonso Construction Inc.
- Based in
- Fremont
- On San Francisco permits
- Jul 2020 to Jun 2026
- Last 24 months
- 1 permit filed
8 permits since 2000: 8 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2026 | Completed final sign-off Sep 2026 | 2166 35th Av | rewire whole house, repipe portions of water pipes, drywall and plaster repairs throughout home.Details
rewire whole house, repipe portions of water pipes, drywall and plaster repairs throughout home. | $10,000 |
| Oct 17, 2023 | Completed final sign-off Oct 2024 | 925 Filbert St | revision to pa# 202105140422, kitchen entry reduced in size.Details
revision to pa# 202105140422, kitchen entry reduced in size. | |
| Oct 17, 2023 | Completed final sign-off Oct 2024 | 925 Filbert St | in-kind window replacement of 18 windows, not visible from the street.Details
in-kind window replacement of 18 windows, not visible from the street. | $25,000 |
| Apr 21, 2023 | Completed final sign-off Dec 2023 | 923 Filbert St | legalization of in-kind window replacement in compliance to report# 202306974. window replacement is not street visible. u=.30max, 8 total windows.Details
legalization of in-kind window replacement in compliance to report# 202306974. window replacement is not street visible. u=.30max, 8 total windows. | $5,000 |
| Dec 21, 2022 | Completed final sign-off Dec 2023 | 923 Filbert St | revision to bpa#202210063873, adding structural beams at kitchen/livingDetails
revision to bpa#202210063873, adding structural beams at kitchen/living | $5,000 |
| Oct 6, 2022 | Completed final sign-off Dec 2023 | 923 Filbert St | kitechen remodel including (n) cabinets, appliances, lighting & plumbing connections. (n) recessed lighting in entry, hall, laundryDetails
kitechen remodel including (n) cabinets, appliances, lighting & plumbing connections. (n) recessed lighting in entry, hall, laundry | $50,000 |
| May 14, 2021 | Completed final sign-off Oct 2024 | 925 Filbert St | remodel (e) kitchen and upper bath in current locations. new cabinetry, appliances, lighting, tile, plumbing fixtures and countertops to be used.Details
remodel (e) kitchen and upper bath in current locations. new cabinetry, appliances, lighting, tile, plumbing fixtures and countertops to be used. | $150,000 |
| Jul 31, 2020 | Completed final sign-off Sep 2020 | 2166 35th Av | inkind repair of the lower steps (approximately 1/3 of the steps) at the front of the building. the steps are cracking. repair the stucco on the sides of the steps, equal to about 15-20 linear feet.Details
inkind repair of the lower steps (approximately 1/3 of the steps) at the front of the building. the steps are cracking. repair the stucco on the sides of the steps, equal to about 15-20 linear feet. | $3,000 |