Perez Construction
- Based in
- Livingston
- On San Francisco permits
- May 2025 to Jul 2025
- Last 24 months
- 2 permits filed
2 permits since 2000: 2 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2025 | Completed final sign-off Dec 2025 | 1789 Oak St | 1) remove non-working fire place at 3rd floor and attic roof while leaving the 2nd floor and garage level intact. 2)remove kitchen fire place wall at 3rd floor only and install 4x12 beam. 3)install a new footing for 4x6 post at garage level as needed. exterior remove fire place flueDetails
1) remove non-working fire place at 3rd floor and attic roof while leaving the 2nd floor and garage level intact. 2)remove kitchen fire place wall at 3rd floor only and install 4x12 beam. 3)install a new footing for 4x6 post at garage level as needed. exterior remove fire place flue | $9,000 |
| May 28, 2025 | Completed final sign-off Dec 2025 | 1789 Oak St | 2/f unit 1789: expand 2 bathrooms, no wall removal, expand bath 1 for a new tub/ shower, expand bath 2 for a new sink. kitchen- add a stove exhaust fan.Details
2/f unit 1789: expand 2 bathrooms, no wall removal, expand bath 1 for a new tub/ shower, expand bath 2 for a new sink. kitchen- add a stove exhaust fan. | $14,000 |